Lower Energy Costs Act
Client: SOUTHWESTERN POWER GROUP (FKA SUNZIA TRANSMISSION) LLCOSOL TRANSMISSION PROJECT · Firm: THOMAS CHAMPION
Monitoring Congress' consideration of environmental permitting changes in HR1 and tax legislation to permit investment tax credits for electric transmission properties.
Lower Energy Costs Act
Client: SOUTHWESTERN POWER GROUP (FKA SUNZIA TRANSMISSION) LLCOSOL TRANSMISSION PROJECT · Firm: THOMAS CHAMPION
Monitoring Congress' consideration of environmental permitting changes in HR1 and tax legislation to permit investment tax credits for electric transmission properties.
Specific issues are shown only where the LDA source assigned them to this lobbyist. Targets apply to the associated filing.
SOUTHWESTERN POWER GROUP (FKA SUNZIA TRANSMISSION) LLCOSOL TRANSMISSION PROJECT via THOMAS CHAMPION
2026 · second_quarter · Q2
House-Senate budget resolutions for an electrical transmission investment tax provision.
House reconciliation bill for inclusion of an investment tax credit for electrical transmission
Source: Senate LDA
Lower Energy Costs Act
Client: SOUTHWESTERN POWER GROUP (FKA SUNZIA TRANSMISSION) LLCOSOL TRANSMISSION PROJECT · Firm: THOMAS CHAMPION
Monitoring Congress' consideration of environmental permitting changes in HR1 and tax legislation to permit investment tax credits for electric transmission properties.
Lower Energy Costs Act
Client: SOUTHWESTERN POWER GROUP (FKA SUNZIA TRANSMISSION) LLCOSOL TRANSMISSION PROJECT · Firm: THOMAS CHAMPION
Monitoring Congress' consideration of environmental permitting changes in HR1 and tax legislation to permit investment tax credits for electric transmission properties.
Lower Energy Costs Act
Client: SOUTHWESTERN POWER GROUP (FKA SUNZIA TRANSMISSION) LLCOSOL TRANSMISSION PROJECT · Firm: THOMAS CHAMPION
Monitoring Congress' consideration of environmental permitting changes in HR1 and tax legislation to permit investment tax credits for electric transmission properties.
Lower Energy Costs Act
Client: SOUTHWESTERN POWER GROUP (FKA SUNZIA TRANSMISSION) LLCOSOL TRANSMISSION PROJECT · Firm: THOMAS CHAMPION
Monitoring Congress' consideration of environmental permitting changes in HR1 and tax legislation to permit investment tax credits for electric transmission properties.
No Time Limit for Justice Act
Client: SOUTHWESTERN POWER GROUP (FKA SUNZIA TRANSMISSION) LLCOSOL TRANSMISSION PROJECT · Firm: THOMAS CHAMPION
S. 3107- A bill to establish a tax credit for regionalelectric transmission lines.
No Time Limit for Justice Act
Client: SOUTHWESTERN POWER GROUP (FKA SUNZIA TRANSMISSION) LLCOSOL TRANSMISSION PROJECT · Firm: THOMAS CHAMPION
S. 3107- A bill to establish a tax credit for regional electric transmission lines.
No Time Limit for Justice Act
Client: SOUTHWESTERN POWER GROUP (FKA SUNZIA TRANSMISSION) LLCOSOL TRANSMISSION PROJECT · Firm: THOMAS CHAMPION
S. 3107 - To establish a tax credit for the installation of regionally significant electric transmission power lines.
No Time Limit for Justice Act
Client: SOUTHWESTERN POWER GROUP (FKA SUNZIA TRANSMISSION) LLCOSOL TRANSMISSION PROJECT · Firm: THOMAS CHAMPION
S. 3107- A bill to establish a tax credit for regional electric transmission lines.
No Time Limit for Justice Act
Client: SOUTHWESTERN POWER GROUP (FKA SUNZIA TRANSMISSION) LLCOSOL TRANSMISSION PROJECT · Firm: THOMAS CHAMPION
S. 3107 - To establish a tax credit for the installation of regionally significant electric transmission power lines.
No Time Limit for Justice Act
Client: SOUTHWESTERN POWER GROUP (FKA SUNZIA TRANSMISSION) LLCOSOL TRANSMISSION PROJECT · Firm: THOMAS CHAMPION
S. 3107 - To establish a tax credit for the installation of regionally significant electric transmission power lines.
No Time Limit for Justice Act
Client: SOUTHWESTERN POWER GROUP (FKA SUNZIA TRANSMISSION) LLCOSOL TRANSMISSION PROJECT · Firm: THOMAS CHAMPION
S. 3107 - To establish a tax credit for the installation of regionally significant electric transmission power lines.
No Time Limit for Justice Act
Client: SOUTHWESTERN POWER GROUP (FKA SUNZIA TRANSMISSION) LLCOSOL TRANSMISSION PROJECT · Firm: THOMAS CHAMPION
S. 3107- A bill to establish a tax credit for regionalelectric transmission lines.
No Time Limit for Justice Act
Client: SOUTHWESTERN POWER GROUP (FKA SUNZIA TRANSMISSION) LLCOSOL TRANSMISSION PROJECT · Firm: THOMAS CHAMPION
S. 3107 - To establish a tax credit for the installation of regionally significant electric transmission power lines.
No Time Limit for Justice Act
Client: SOUTHWESTERN POWER GROUP (FKA SUNZIA TRANSMISSION) LLCOSOL TRANSMISSION PROJECT · Firm: THOMAS CHAMPION
S. 3107- A bill to establish a tax credit for regionally significant electric transmission lines.
No Time Limit for Justice Act
Client: SOUTHWESTERN POWER GROUP (FKA SUNZIA TRANSMISSION) LLCOSOL TRANSMISSION PROJECT · Firm: THOMAS CHAMPION
S. 3107- A bill to establish a tax credit for regionally significant electric transmission lines.
No Time Limit for Justice Act
Client: SOUTHWESTERN POWER GROUP (FKA SUNZIA TRANSMISSION) LLCOSOL TRANSMISSION PROJECT · Firm: THOMAS CHAMPION
S. 3107 - To establish a tax credit for the installation of regionally significant electric transmission power lines.
No Time Limit for Justice Act
Client: SOUTHWESTERN POWER GROUP (FKA SUNZIA TRANSMISSION) LLCOSOL TRANSMISSION PROJECT · Firm: THOMAS CHAMPION
S. 3107 - To establish a tax credit for the installation of regionally significant electric transmission power lines.
No Time Limit for Justice Act
Client: SOUTHWESTERN POWER GROUP (FKA SUNZIA TRANSMISSION) LLCOSOL TRANSMISSION PROJECT · Firm: THOMAS CHAMPION
S. 3107- A bill to establish a tax credit for regionalelectric transmission lines.
No Time Limit for Justice Act
Client: SOUTHWESTERN POWER GROUP (FKA SUNZIA TRANSMISSION) LLCOSOL TRANSMISSION PROJECT · Firm: THOMAS CHAMPION
S. 3107 - To establish a tax credit for the installation of regionally significant electric transmission power lines.
House-Senate reconciliation bill
Filing targets: Bureau of Land Management (BLM), Council on Environmental Quality (CEQ), Defense, Dept of (DOD), Energy, Dept of, Federal Energy Regulatory Commission (FERC), HOUSE OF REPRESENTATIVES, Interior, Dept of (DOI), SENATE, U.S. Fish & Wildlife Service (USFWS), U.S. Forest Service
SOUTHWESTERN POWER GROUP (FKA SUNZIA TRANSMISSION) LLCOSOL TRANSMISSION PROJECT via THOMAS CHAMPION
2026 · first_quarter · Q1
House reconciliation bill for inclusion of an investment tax credit for electrical transmission
House-Senate budget resolutions for an electrical transmission investment tax provision.
House-Senate reconciliation bill
Filing targets: Bureau of Land Management (BLM), Council on Environmental Quality (CEQ), Defense, Dept of (DOD), Energy, Dept of, Federal Energy Regulatory Commission (FERC), HOUSE OF REPRESENTATIVES, Interior, Dept of (DOI), SENATE, U.S. Fish & Wildlife Service (USFWS), U.S. Forest Service
SOUTHWESTERN POWER GROUP (FKA SUNZIA TRANSMISSION) LLCOSOL TRANSMISSION PROJECT via THOMAS CHAMPION
2025 · fourth_quarter · Q4
House-Senate budget resolutions for an electrical transmission investment tax provision.
House reconciliation bill for inclusion of an investment tax credit for electrical transmission
House-Senate reconciliation bill
Filing targets: Bureau of Land Management (BLM), Council on Environmental Quality (CEQ), Defense, Dept of (DOD), Energy, Dept of, Federal Energy Regulatory Commission (FERC), HOUSE OF REPRESENTATIVES, Interior, Dept of (DOI), SENATE, U.S. Fish & Wildlife Service (USFWS), U.S. Forest Service
SOUTHWESTERN POWER GROUP (FKA SUNZIA TRANSMISSION) LLCOSOL TRANSMISSION PROJECT via THOMAS CHAMPION
2025 · third_quarter · Q3
House-Senate budget resolutions for an electrical transmission investment tax provision.
House reconciliation bill for inclusion of an investment tax credit for electrical transmission
House-Senate reconciliation bill
Filing targets: Bureau of Land Management (BLM), Council on Environmental Quality (CEQ), Defense, Dept of (DOD), Energy, Dept of, Federal Energy Regulatory Commission (FERC), HOUSE OF REPRESENTATIVES, Interior, Dept of (DOI), SENATE, U.S. Fish & Wildlife Service (USFWS), U.S. Forest Service
SOUTHWESTERN POWER GROUP (FKA SUNZIA TRANSMISSION) LLCOSOL TRANSMISSION PROJECT via THOMAS CHAMPION
2025 · second_quarter · Q2
House-Senate budget resolutions for an electrical transmission investment tax provision.
House reconciliation bill for inclusion of an investment tax credit for electrical transmission
House-Senate reconciliation bill
Filing targets: Bureau of Land Management (BLM), Council on Environmental Quality (CEQ), Defense, Dept of (DOD), Energy, Dept of, Federal Energy Regulatory Commission (FERC), HOUSE OF REPRESENTATIVES, Interior, Dept of (DOI), SENATE, U.S. Fish & Wildlife Service (USFWS), U.S. Forest Service
SOUTHWESTERN POWER GROUP (FKA SUNZIA TRANSMISSION) LLCOSOL TRANSMISSION PROJECT via THOMAS CHAMPION
2025 · first_quarter · Q1
House-Senate budget resolutions for an electrical transmission investment tax provision.
House concurrent resolution for inclusion of an investment tax credit for electrical transmission
House-Senate
Filing targets: Bureau of Land Management (BLM), Council on Environmental Quality (CEQ), Defense, Dept of (DOD), Energy, Dept of, Federal Energy Regulatory Commission (FERC), HOUSE OF REPRESENTATIVES, Interior, Dept of (DOI), SENATE, U.S. Fish & Wildlife Service (USFWS), U.S. Forest Service
SOUTHWESTERN POWER GROUP (FKA SUNZIA TRANSMISSION) LLCOSOL TRANSMISSION PROJECT via THOMAS CHAMPION
2024 · fourth_quarter · Q4
Providing Senate and House staff advice regarding NEPA permitting changes; monitoring BLM and related agency activities toward completing a NEPA review; discussing with House and Senate staff the qualification of transmission properties for investment tax credit treatment.
Seeking introduction of legislation to qualify electric transmission properties for investment tax credits.
Monitoring Congress' consideration of environmental permitting changes in HR1 and tax legislation to permit investment tax credits for electric transmission properties.
SOUTHWESTERN POWER GROUP (FKA SUNZIA TRANSMISSION) LLCOSOL TRANSMISSION PROJECT via THOMAS CHAMPION
2024 · third_quarter · Q3
Seeking introduction of legislation to qualify electric transmission properties for investment tax credits.
Monitoring Congress' consideration of environmental permitting changes in HR1 and tax legislation to permit investment tax credits for electric transmission properties.
Providing Senate and House staff advice regarding NEPA permitting changes; monitoring BLM and related agency activities toward completing a NEPA review; discussing with House and Senate staff the qualification of transmission properties for investment tax credit treatment.
SOUTHWESTERN POWER GROUP (FKA SUNZIA TRANSMISSION) LLCOSOL TRANSMISSION PROJECT via THOMAS CHAMPION
2024 · second_quarter · Q2
Providing Senate and House staff advice regarding NEPA permitting changes; monitoring BLM and related agency activities toward completing a NEPA review; discussing with House and Senate staff the qualification of transmission properties for investment tax credit treatment.
Monitoring Congress' consideration of environmental permitting changes in HR1 and tax legislation to permit investment tax credits for electric transmission properties.
Seeking introduction of legislation to qualify electric transmission properties for investment tax credits.
SOUTHWESTERN POWER GROUP (FKA SUNZIA TRANSMISSION) LLCOSOL TRANSMISSION PROJECT via THOMAS CHAMPION
2024 · first_quarter · Q1
Providing Senate and House staff advice regarding NEPA permitting changes; monitoring BLM and related agency activities toward completing a NEPA review; discussing with House and Senate staff the qualification of transmission properties for investment tax credit treatment.
Monitoring Congress' consideration of environmental permitting changes in HR1 and tax legislation to permit investment tax credits for electric transmission properties.
Seeking introduction of legislation to qualify electric transmission properties for investment tax credits.
SOUTHWESTERN POWER GROUP (FKA SUNZIA TRANSMISSION) LLCOSOL TRANSMISSION PROJECT via THOMAS CHAMPION
2023 · fourth_quarter · Q4
Monitoring Congress' consideration of environmental permitting changes in HR1 and tax legislation to permit investment tax credits for electric transmission properties.
Providing Senate and House staff advice regarding NEPA permitting changes; monitoring BLM and related agency activities toward completing a NEPA review; discussing with House and Senate staff the qualification of transmission properties for investment tax credit treatment.
Seeking introduction of legislation to qualify electric transmission properties for investment tax credits.
SOUTHWESTERN POWER GROUP (FKA SUNZIA TRANSMISSION) LLCOSOL TRANSMISSION PROJECT via THOMAS CHAMPION
2023 · third_quarter · Q3
Monitoring Congress' consideration of environmental permitting changes in HR1 and tax legislation to permit investment tax credits for electric transmission properties.
Seeking introduction of legislation to qualify electric transmission properties for investment tax credits.
Providing Senate and House staff advice regarding NEPA permitting changes; monitoring BLM and related agency activities toward completing a NEPA review; discussing with House and Senate staff the qualification of transmission properties for investment tax credit treatment.
SOUTHWESTERN POWER GROUP (FKA SUNZIA TRANSMISSION) LLCOSOL TRANSMISSION PROJECT via THOMAS CHAMPION
2023 · third_quarter · RA
NEPA permitting reform; tax legislation
SOUTHWESTERN POWER GROUP (FKA SUNZIA TRANSMISSION) LLCOSOL TRANSMISSION PROJECT via THOMAS CHAMPION
2023 · second_quarter · Q2
Providing Senate staff advice regarding NEPA permitting changes; monitoring BLM and related agency activities toward completing a NEPA review
Monitoring Congress' consideration of environmental permitting changes
Filing targets: Bureau of Land Management (BLM), Council on Environmental Quality (CEQ), Defense, Dept of (DOD), Energy, Dept of, Federal Energy Regulatory Commission (FERC), HOUSE OF REPRESENTATIVES, Interior, Dept of (DOI), SENATE, U.S. Fish & Wildlife Service (USFWS), U.S. Forest Service
SOUTHWESTERN POWER GROUP (FKA SUNZIA TRANSMISSION) LLCOSOL TRANSMISSION PROJECT via THOMAS CHAMPION
2023 · first_quarter · Q1
Monitoring Congress' consideration of environmental permitting changes
Providing Senate staff advice regarding NEPA permitting changes; monitoring BLM and related agency activities toward completing a NEPA review
Filing targets: Bureau of Land Management (BLM), Council on Environmental Quality (CEQ), Defense, Dept of (DOD), Energy, Dept of, Federal Energy Regulatory Commission (FERC), HOUSE OF REPRESENTATIVES, Interior, Dept of (DOI), SENATE, U.S. Fish & Wildlife Service (USFWS), U.S. Forest Service
SOUTHWESTERN POWER GROUP (FKA SUNZIA TRANSMISSION) LLCOSOL TRANSMISSION PROJECT via THOMAS CHAMPION
2022 · fourth_quarter · Q4
Working to secure approvals to construct wind-enabling electric transmission lines. Project works with Members of Congress and staff as needed to assist with approvals through the Department of the Interior and a number of federal cooperating agencies.
S. 3107 - To establish a tax credit for the installation of regionally significant electric transmission power lines.
Filing targets: Bureau of Land Management (BLM), Council on Environmental Quality (CEQ), Defense, Dept of (DOD), Energy, Dept of, Federal Energy Regulatory Commission (FERC), HOUSE OF REPRESENTATIVES, Interior, Dept of (DOI), SENATE, U.S. Fish & Wildlife Service (USFWS), U.S. Forest Service
SOUTHWESTERN POWER GROUP (FKA SUNZIA TRANSMISSION) LLCOSOL TRANSMISSION PROJECT via THOMAS CHAMPION
2022 · third_quarter · Q3
S. 3107- A bill to establish a tax credit for regional electric transmission lines.
S. 3107 - To establish a tax credit for the installation of regionally significant electric transmission power lines.
Filing targets: Bureau of Land Management (BLM), Council on Environmental Quality (CEQ), Defense, Dept of (DOD), Energy, Dept of, Federal Energy Regulatory Commission (FERC), HOUSE OF REPRESENTATIVES, Interior, Dept of (DOI), SENATE, U.S. Fish & Wildlife Service (USFWS), U.S. Forest Service
SOUTHWESTERN POWER GROUP (FKA SUNZIA TRANSMISSION) LLCOSOL TRANSMISSION PROJECT via THOMAS CHAMPION
2022 · second_quarter · Q2
S. 3107- A bill to establish a tax credit for regional electric transmission lines.
S. 3107 - To establish a tax credit for the installation of regionally significant electric transmission power lines.
Filing targets: Bureau of Land Management (BLM), Council on Environmental Quality (CEQ), Defense, Dept of (DOD), Energy, Dept of, Federal Energy Regulatory Commission (FERC), HOUSE OF REPRESENTATIVES, Interior, Dept of (DOI), SENATE, U.S. Fish & Wildlife Service (USFWS), U.S. Forest Service
SOUTHWESTERN POWER GROUP (FKA SUNZIA TRANSMISSION) LLCOSOL TRANSMISSION PROJECT via THOMAS CHAMPION
2022 · first_quarter · Q1
S. 3107 - To establish a tax credit for the installation of regionally significant electric transmission power lines.
S. 3107- A bill to establish a tax credit for regionalelectric transmission lines.
Filing targets: Bureau of Land Management (BLM), Council on Environmental Quality (CEQ), Defense, Dept of (DOD), Energy, Dept of, Federal Energy Regulatory Commission (FERC), HOUSE OF REPRESENTATIVES, Interior, Dept of (DOI), SENATE, U.S. Fish & Wildlife Service (USFWS), U.S. Forest Service
SOUTHWESTERN POWER GROUP (FKA SUNZIA TRANSMISSION) LLCOSOL TRANSMISSION PROJECT via THOMAS CHAMPION
2021 · fourth_quarter · Q4
S. 3107 - To establish a tax credit for the installation of regionally significant electric transmission power lines.
S. 3107- A bill to establish a tax credit for regionalelectric transmission lines.
Filing targets: Bureau of Land Management (BLM), Council on Environmental Quality (CEQ), Defense, Dept of (DOD), Energy, Dept of, Federal Energy Regulatory Commission (FERC), HOUSE OF REPRESENTATIVES, Interior, Dept of (DOI), SENATE, U.S. Fish & Wildlife Service (USFWS), U.S. Forest Service
SOUTHWESTERN POWER GROUP (FKA SUNZIA TRANSMISSION) LLCOSOL TRANSMISSION PROJECT via THOMAS CHAMPION
2021 · third_quarter · Q3
S. 3107- A bill to establish a tax credit for regionalelectric transmission lines.
S. 3107 - To establish a tax credit for the installation of regionally significant electric transmission power lines.
Filing targets: Bureau of Land Management (BLM), Council on Environmental Quality (CEQ), Defense, Dept of (DOD), Energy, Dept of, Federal Energy Regulatory Commission (FERC), HOUSE OF REPRESENTATIVES, Interior, Dept of (DOI), SENATE
SOUTHWESTERN POWER GROUP (FKA SUNZIA TRANSMISSION) LLCOSOL TRANSMISSION PROJECT via THOMAS CHAMPION
2021 · second_quarter · Q2
S. 3107 - To establish a tax credit for the installation of regionally significant electric transmission power lines.
S. 3107- A bill to establish a tax credit for regionally significant electric transmission lines.
Filing targets: Bureau of Land Management (BLM), Defense, Dept of (DOD), Energy, Dept of, Federal Energy Regulatory Commission (FERC), HOUSE OF REPRESENTATIVES, Interior, Dept of (DOI), SENATE
SOUTHWESTERN POWER GROUP (FKA SUNZIA TRANSMISSION) LLCOSOL TRANSMISSION PROJECT via THOMAS CHAMPION
2021 · first_quarter · Q1
S. 3107- A bill to establish a tax credit for regionally significant electric transmission lines.
S. 3107 - To establish a tax credit for the installation of regionally significant electric transmission power lines.
Filing targets: Bureau of Land Management (BLM), Defense, Dept of (DOD), Energy, Dept of, Federal Energy Regulatory Commission (FERC), HOUSE OF REPRESENTATIVES, Interior, Dept of (DOI), SENATE
SOUTHWESTERN POWER GROUP (FKA SUNZIA TRANSMISSION) LLCOSOL TRANSMISSION PROJECT via THOMAS CHAMPION
2020 · fourth_quarter · Q4
Representation of the SunZia Transmission project includes resource-related issues before the Congress and various agencies.
Project focused on a BLM-led environmental review process.
Filing targets: Bureau of Land Management (BLM), Defense, Dept of (DOD), Energy, Dept of, Federal Energy Regulatory Commission (FERC), HOUSE OF REPRESENTATIVES, Interior, Dept of (DOI), SENATE
SOUTHWESTERN POWER GROUP (FKA SUNZIA TRANSMISSION) LLCOSOL TRANSMISSION PROJECT via THOMAS CHAMPION
2020 · third_quarter · Q3
Representation of the SunZia Transmission project includes resource-related issues before the Congress and various agencies.
Project focused on a BLM-led environmental review process.
Filing targets: Bureau of Land Management (BLM), Defense, Dept of (DOD), Energy, Dept of, Federal Energy Regulatory Commission (FERC), HOUSE OF REPRESENTATIVES, Interior, Dept of (DOI), SENATE
SOUTHWESTERN POWER GROUP (FKA SUNZIA TRANSMISSION) LLCOSOL TRANSMISSION PROJECT via THOMAS CHAMPION
2020 · second_quarter · Q2
Representation of the SunZia Transmission project includes resource-related issues before the Congress and various agencies.
Filing targets: Bureau of Land Management (BLM), Defense, Dept of (DOD), Energy, Dept of, Federal Energy Regulatory Commission (FERC), HOUSE OF REPRESENTATIVES, Interior, Dept of (DOI), SENATE
SOUTHWESTERN POWER GROUP (FKA SUNZIA TRANSMISSION) LLCOSOL TRANSMISSION PROJECT via THOMAS CHAMPION
2020 · first_quarter · Q1
Representation of the SunZia Transmission project includes resource-related issues before the Congress and various agencies.
Filing targets: Bureau of Land Management (BLM), Defense, Dept of (DOD), Energy, Dept of, Federal Energy Regulatory Commission (FERC), HOUSE OF REPRESENTATIVES, Interior, Dept of (DOI), SENATE
SOUTHWESTERN POWER GROUP (FKA SUNZIA TRANSMISSION) LLCOSOL TRANSMISSION PROJECT via THOMAS CHAMPION
2019 · fourth_quarter · Q4
Representation of the SunZia Transmission project includes resource-related issues before the Congress and various agencies.
Filing targets: Bureau of Land Management (BLM), Defense, Dept of (DOD), Energy, Dept of, Federal Energy Regulatory Commission (FERC), HOUSE OF REPRESENTATIVES, Interior, Dept of (DOI), SENATE
SOUTHWESTERN POWER GROUP (FKA SUNZIA TRANSMISSION) LLCOSOL TRANSMISSION PROJECT via THOMAS CHAMPION
2019 · third_quarter · 3A
Representation of the SunZia Transmission project includes resource-related issues before the Congress and various agencies.
Filing targets: Bureau of Land Management (BLM), Defense, Dept of (DOD), Energy, Dept of, Federal Energy Regulatory Commission (FERC), HOUSE OF REPRESENTATIVES, Interior, Dept of (DOI), SENATE
SOUTHWESTERN POWER GROUP (FKA SUNZIA TRANSMISSION) LLCOSOL TRANSMISSION PROJECT via THOMAS CHAMPION
2019 · second_quarter · Q2
Representation of the SunZia Transmission project includes resource-related issues before the Congress and various agencies.
Filing targets: Bureau of Land Management (BLM), Defense, Dept of (DOD), Energy, Dept of, Federal Energy Regulatory Commission (FERC), HOUSE OF REPRESENTATIVES, Interior, Dept of (DOI), SENATE
SOUTHWESTERN POWER GROUP (FKA SUNZIA TRANSMISSION) LLCOSOL TRANSMISSION PROJECT via THOMAS CHAMPION
2019 · first_quarter · Q1
Representation of the SunZia Transmission project includes resource-related issues before the Congress and various agencies.
Filing targets: Bureau of Land Management (BLM), Defense, Dept of (DOD), Energy, Dept of, Federal Energy Regulatory Commission (FERC), HOUSE OF REPRESENTATIVES, Interior, Dept of (DOI), SENATE
SOUTHWESTERN POWER GROUP (FKA SUNZIA TRANSMISSION) LLCOSOL TRANSMISSION PROJECT via THOMAS CHAMPION
2018 · fourth_quarter · Q4
Monitored issues related to FERC, the Department of the Interior, the Department of Energy, the Department of Defense. and Congress.
Filing targets: Bureau of Land Management (BLM), Defense, Dept of (DOD), Energy, Dept of, Federal Energy Regulatory Commission (FERC), HOUSE OF REPRESENTATIVES, Interior, Dept of (DOI), SENATE
SOUTHWESTERN POWER GROUP (FKA SUNZIA TRANSMISSION) LLCOSOL TRANSMISSION PROJECT via THOMAS CHAMPION
2018 · third_quarter · Q3
Monitored issues related to FERC, the Department of the Interior, the Department of Energy, the Department of Defense. and Congress.
Filing targets: Bureau of Land Management (BLM), Defense, Dept of (DOD), Energy, Dept of, Federal Energy Regulatory Commission (FERC), HOUSE OF REPRESENTATIVES, Interior, Dept of (DOI), SENATE
SOUTHWESTERN POWER GROUP (FKA SUNZIA TRANSMISSION) LLCOSOL TRANSMISSION PROJECT via THOMAS CHAMPION
2018 · second_quarter · Q2
Monitored issues related to FERC, the Department of the Interior, the Department of Energy, the Department of Defense. and Congress.
Filing targets: Bureau of Land Management (BLM), Defense, Dept of (DOD), Energy, Dept of, Federal Energy Regulatory Commission (FERC), HOUSE OF REPRESENTATIVES, Interior, Dept of (DOI), SENATE
SOUTHWESTERN POWER GROUP (FKA SUNZIA TRANSMISSION) LLCOSOL TRANSMISSION PROJECT via THOMAS CHAMPION
2018 · first_quarter · Q1
Monitored issues related to FERC, the Department of the Interior, the Department of Energy, the Department of Defense. and Congress.
Filing targets: Bureau of Land Management (BLM), Defense, Dept of (DOD), Energy, Dept of, Federal Energy Regulatory Commission (FERC), HOUSE OF REPRESENTATIVES, Interior, Dept of (DOI), SENATE
SOUTHWESTERN POWER GROUP (FKA SUNZIA TRANSMISSION) LLCOSOL TRANSMISSION PROJECT via THOMAS CHAMPION
2017 · fourth_quarter · Q4
Monitored issues related to FERC, the Department of the Interior, and the Department of Energy.
Filing targets: Bureau of Land Management (BLM), Defense, Dept of (DOD), Energy, Dept of, Federal Energy Regulatory Commission (FERC), HOUSE OF REPRESENTATIVES, Interior, Dept of (DOI), SENATE
SOUTHWESTERN POWER GROUP (FKA SUNZIA TRANSMISSION) LLCOSOL TRANSMISSION PROJECT via THOMAS CHAMPION
2017 · third_quarter · Q3
Monitored issues related to FERC, the Department of the Interior, and the Department of Energy.
Filing targets: Bureau of Land Management (BLM), Defense, Dept of (DOD), Energy, Dept of, Federal Energy Regulatory Commission (FERC), HOUSE OF REPRESENTATIVES, Interior, Dept of (DOI), SENATE
SOUTHWESTERN POWER GROUP (FKA SUNZIA TRANSMISSION) LLCOSOL TRANSMISSION PROJECT via THOMAS CHAMPION
2017 · second_quarter · Q2
Monitored issues related to FERC, the Department of the Interior, and the Department of Energy.
Filing targets: Bureau of Land Management (BLM), Defense, Dept of (DOD), Energy, Dept of, Federal Energy Regulatory Commission (FERC), HOUSE OF REPRESENTATIVES, Interior, Dept of (DOI), SENATE
SOUTHWESTERN POWER GROUP (FKA SUNZIA TRANSMISSION) LLCOSOL TRANSMISSION PROJECT via THOMAS CHAMPION
2017 · first_quarter · Q1
Monitored issues related to FERC, the Department of the Interior, and the Department of Energy.
Filing targets: Bureau of Land Management (BLM), Defense, Dept of (DOD), Energy, Dept of, Federal Energy Regulatory Commission (FERC), HOUSE OF REPRESENTATIVES, Interior, Dept of (DOI), SENATE
SOUTHWESTERN POWER GROUP (FKA SUNZIA TRANSMISSION) LLCOSOL TRANSMISSION PROJECT via THOMAS CHAMPION
2016 · third_quarter · Q3
Issues associated with the environmental review of the SunZia Transmission Project LLC
Issues associated with the environmental review of the Sun Zia Transmission Project LLC
Filing targets: Army, Dept of (Other), Bureau of Land Management (BLM), Council on Environmental Quality (CEQ), Defense, Dept of (DOD), Federal Energy Regulatory Commission (FERC), HOUSE OF REPRESENTATIVES, SENATE
SOUTHWESTERN POWER GROUP (FKA SUNZIA TRANSMISSION) LLCOSOL TRANSMISSION PROJECT via THOMAS CHAMPION
2016 · second_quarter · Q2
Issues associated with the environmental review of the Sun Zia Transmission Project LLC
Issues associated with the environmental review of the SunZia Transmission Project LLC
Filing targets: Army, Dept of (Other), Bureau of Land Management (BLM), Council on Environmental Quality (CEQ), Defense, Dept of (DOD), Federal Energy Regulatory Commission (FERC), HOUSE OF REPRESENTATIVES, SENATE
SOUTHWESTERN POWER GROUP (FKA SUNZIA TRANSMISSION) LLCOSOL TRANSMISSION PROJECT via THOMAS CHAMPION
2016 · fourth_quarter · Q4
Monitoring legislation related to transmission development. Monitoring agency activities associated with transmission development.
Filing targets: Bureau of Land Management (BLM), Defense, Dept of (DOD), Energy, Dept of, Federal Energy Regulatory Commission (FERC), HOUSE OF REPRESENTATIVES, SENATE
SOUTHWESTERN POWER GROUP (FKA SUNZIA TRANSMISSION) LLCOSOL TRANSMISSION PROJECT via THOMAS CHAMPION
2016 · first_quarter · Q1
Issues associated with the environmental review of the SunZia Transmission Project LLC
Issues associated with the environmental review of the Sun Zia Transmission Project LLC
Filing targets: Army, Dept of (Other), Bureau of Land Management (BLM), Council on Environmental Quality (CEQ), Defense, Dept of (DOD), Federal Energy Regulatory Commission (FERC), HOUSE OF REPRESENTATIVES, SENATE
SOUTHWESTERN POWER GROUP (FKA SUNZIA TRANSMISSION) LLCOSOL TRANSMISSION PROJECT via THOMAS CHAMPION
2015 · fourth_quarter · Q4
Issues associated with the environmental review of the SunZia Transmission Project LLC
Issues associated with the environmental review of the Sun Zia Transmission Project LLC
Filing targets: Army, Dept of (Other), Bureau of Land Management (BLM), Council on Environmental Quality (CEQ), Defense, Dept of (DOD), Federal Energy Regulatory Commission (FERC), HOUSE OF REPRESENTATIVES, SENATE
SOUTHWESTERN POWER GROUP (FKA SUNZIA TRANSMISSION) LLCOSOL TRANSMISSION PROJECT via THOMAS CHAMPION
2015 · third_quarter · Q3
Issues associated with the environmental review of the Sun Zia Transmission Project LLC
Issues associated with the environmental review of the SunZia Transmission Project LLC
Filing targets: Army, Dept of (Other), Bureau of Land Management (BLM), Council on Environmental Quality (CEQ), Defense, Dept of (DOD), Federal Energy Regulatory Commission (FERC), HOUSE OF REPRESENTATIVES, SENATE
SOUTHWESTERN POWER GROUP (FKA SUNZIA TRANSMISSION) LLCOSOL TRANSMISSION PROJECT via THOMAS CHAMPION
2015 · second_quarter · Q2
Issues associated with the environmental review of the SunZia Transmission Project LLC
Issues associated with the environmental review of the Sun Zia Transmission Project LLC
Filing targets: Army, Dept of (Other), Bureau of Land Management (BLM), Council on Environmental Quality (CEQ), Defense, Dept of (DOD), Federal Energy Regulatory Commission (FERC), HOUSE OF REPRESENTATIVES, SENATE
SOUTHWESTERN POWER GROUP (FKA SUNZIA TRANSMISSION) LLCOSOL TRANSMISSION PROJECT via THOMAS CHAMPION
2015 · first_quarter · Q1
Issues associated with the environmental review of the SunZia Transmission Project LLC
Filing targets: Army, Dept of (Other), Bureau of Land Management (BLM), Council on Environmental Quality (CEQ), Defense, Dept of (DOD), Federal Energy Regulatory Commission (FERC), HOUSE OF REPRESENTATIVES, SENATE
SOUTHWESTERN POWER GROUP (FKA SUNZIA TRANSMISSION) LLCOSOL TRANSMISSION PROJECT via THOMAS CHAMPION
2014 · fourth_quarter · 4A
Issues associated with the environmental review of the Sun Zia Transmission Project LLC
Filing targets: Army, Dept of (Other), Bureau of Land Management (BLM), Council on Environmental Quality (CEQ), Defense, Dept of (DOD), Federal Energy Regulatory Commission (FERC), HOUSE OF REPRESENTATIVES, SENATE
SOUTHWESTERN POWER GROUP (FKA SUNZIA TRANSMISSION) LLCOSOL TRANSMISSION PROJECT via THOMAS CHAMPION
2014 · fourth_quarter · Q4
Issues associated with the environmental review of the Sun Zia Transmission Project LLC
Filing targets: Army, Dept of (Other), Bureau of Land Management (BLM), Council on Environmental Quality (CEQ), Defense, Dept of (DOD), Federal Energy Regulatory Commission (FERC), HOUSE OF REPRESENTATIVES, SENATE
SOUTHWESTERN POWER GROUP (FKA SUNZIA TRANSMISSION) LLCOSOL TRANSMISSION PROJECT via THOMAS CHAMPION
2014 · third_quarter · Q3
Issues associated with the environmental review of the SunZia Transmission Project LLC
Filing targets: Army, Dept of (Other), Bureau of Land Management (BLM), Council on Environmental Quality (CEQ), Defense, Dept of (DOD), Federal Energy Regulatory Commission (FERC), HOUSE OF REPRESENTATIVES, SENATE
SOUTHWESTERN POWER GROUP (FKA SUNZIA TRANSMISSION) LLCOSOL TRANSMISSION PROJECT via THOMAS CHAMPION
2014 · second_quarter · Q2
Issues associated with the environmental review of the SunZia Transmission Project LLC
Filing targets: Army, Dept of (Other), Bureau of Land Management (BLM), Council on Environmental Quality (CEQ), Defense, Dept of (DOD), Energy, Dept of, Federal Energy Regulatory Commission (FERC), HOUSE OF REPRESENTATIVES, SENATE
SOUTHWESTERN POWER GROUP (FKA SUNZIA TRANSMISSION) LLCOSOL TRANSMISSION PROJECT via THOMAS CHAMPION
2014 · first_quarter · Q1
Issues associated with the environmental review of the SunZia Transmission Project LLC
Filing targets: Army, Dept of (Other), Bureau of Land Management (BLM), Council on Environmental Quality (CEQ), Defense, Dept of (DOD), Energy, Dept of, Federal Energy Regulatory Commission (FERC), HOUSE OF REPRESENTATIVES, SENATE
SOUTHWESTERN POWER GROUP (FKA SUNZIA TRANSMISSION) LLCOSOL TRANSMISSION PROJECT via THOMAS CHAMPION
2013 · second_quarter · Q2
Issues associated with the environmental review of the SunZia Transmission Project LLC
Filing targets: Army, Dept of (Other), Bureau of Land Management (BLM), Council on Environmental Quality (CEQ), Defense, Dept of (DOD), Energy, Dept of, Federal Energy Regulatory Commission (FERC), HOUSE OF REPRESENTATIVES, SENATE
SOUTHWESTERN POWER GROUP (FKA SUNZIA TRANSMISSION) LLCOSOL TRANSMISSION PROJECT via THOMAS CHAMPION
2013 · fourth_quarter · Q4
Issues associated with the environmental review of the SunZia Transmission Project LLC
Filing targets: Army, Dept of (Other), Bureau of Land Management (BLM), Council on Environmental Quality (CEQ), Defense, Dept of (DOD), Energy, Dept of, Federal Energy Regulatory Commission (FERC), HOUSE OF REPRESENTATIVES, SENATE
SOUTHWESTERN POWER GROUP (FKA SUNZIA TRANSMISSION) LLCOSOL TRANSMISSION PROJECT via THOMAS CHAMPION
2013 · third_quarter · Q3
Issues associated with the environmental review of the SunZia Transmission Project LLC
Filing targets: Army, Dept of (Other), Bureau of Land Management (BLM), Council on Environmental Quality (CEQ), Defense, Dept of (DOD), Energy, Dept of, Federal Energy Regulatory Commission (FERC), HOUSE OF REPRESENTATIVES, SENATE
SOUTHWESTERN POWER GROUP (FKA SUNZIA TRANSMISSION) LLCOSOL TRANSMISSION PROJECT via THOMAS CHAMPION
2013 · first_quarter · Q1
Issues associated with the environmental review of the SunZia Transmission Project LLC.
Filing targets: Army, Dept of (Other), Bureau of Land Management (BLM), Council on Environmental Quality (CEQ), Defense, Dept of (DOD), Energy, Dept of, Federal Energy Regulatory Commission (FERC), HOUSE OF REPRESENTATIVES, SENATE
SOUTHWESTERN POWER GROUP (FKA SUNZIA TRANSMISSION) LLCOSOL TRANSMISSION PROJECT via THOMAS CHAMPION
2012 · fourth_quarter · Q4
Issues associated with finalizing the environmental review of the SunZia Transmission Project LLC
Filing targets: Army, Dept of (Other), Bureau of Land Management (BLM), Council on Environmental Quality (CEQ), Defense, Dept of (DOD), Energy, Dept of, Federal Energy Regulatory Commission (FERC), HOUSE OF REPRESENTATIVES, SENATE
SOUTHWESTERN POWER GROUP (FKA SUNZIA TRANSMISSION) LLCOSOL TRANSMISSION PROJECT via THOMAS CHAMPION
2012 · third_quarter · Q3
Issues associated with the environmental review of the SunZia Transmission Project LLC
Filing targets: Army, Dept of (Other), Bureau of Land Management (BLM), Council on Environmental Quality (CEQ), Defense, Dept of (DOD), Federal Energy Regulatory Commission (FERC), HOUSE OF REPRESENTATIVES, SENATE
SOUTHWESTERN POWER GROUP (FKA SUNZIA TRANSMISSION) LLCOSOL TRANSMISSION PROJECT via THOMAS CHAMPION
2012 · second_quarter · Q2
Issues associated with the environmental review of the SunZia Transmission Project LLC.
Filing targets: Army, Dept of (Other), Bureau of Land Management (BLM), Council on Environmental Quality (CEQ), Defense, Dept of (DOD), Energy, Dept of, Federal Energy Regulatory Commission (FERC), HOUSE OF REPRESENTATIVES, SENATE
SOUTHWESTERN POWER GROUP (FKA SUNZIA TRANSMISSION) LLCOSOL TRANSMISSION PROJECT via THOMAS CHAMPION
2012 · first_quarter · Q1
Issues associated with the environmental review of the SunZia Transmission Project LLC.
Filing targets: Army, Dept of (Other), Bureau of Land Management (BLM), Council on Environmental Quality (CEQ), Defense, Dept of (DOD), Energy, Dept of, Federal Energy Regulatory Commission (FERC), HOUSE OF REPRESENTATIVES, Interior, Dept of (DOI), SENATE
SOUTHWESTERN POWER GROUP (FKA SUNZIA TRANSMISSION) LLCOSOL TRANSMISSION PROJECT via THOMAS CHAMPION
2011 · first_quarter · Q1
Issues associated with the environmental review of the Sun Zia Transmission Project LLC
Filing targets: Army, Dept of (Other), Bureau of Land Management (BLM), Defense, Dept of (DOD), Energy, Dept of, Federal Energy Regulatory Commission (FERC), HOUSE OF REPRESENTATIVES, Interior, Dept of (DOI), SENATE
SOUTHWESTERN POWER GROUP (FKA SUNZIA TRANSMISSION) LLCOSOL TRANSMISSION PROJECT via THOMAS CHAMPION
2011 · fourth_quarter · 4A
Issues associated with the environmental review of the Sun Zia Transmission Project LLC
Filing targets: Army, Dept of (Other), Bureau of Land Management (BLM), Council on Environmental Quality (CEQ), Defense, Dept of (DOD), Energy, Dept of, Federal Energy Regulatory Commission (FERC), HOUSE OF REPRESENTATIVES, Interior, Dept of (DOI), SENATE
SOUTHWESTERN POWER GROUP (FKA SUNZIA TRANSMISSION) LLCOSOL TRANSMISSION PROJECT via THOMAS CHAMPION
2011 · third_quarter · Q3
Issues associated with environmental review of the Sun Zia Transmission Project LLC
Filing targets: Army, Dept of (Other), Bureau of Land Management (BLM), Council on Environmental Quality (CEQ), Defense, Dept of (DOD), Federal Energy Regulatory Commission (FERC), HOUSE OF REPRESENTATIVES, Interior, Dept of (DOI), SENATE
SOUTHWESTERN POWER GROUP (FKA SUNZIA TRANSMISSION) LLCOSOL TRANSMISSION PROJECT via THOMAS CHAMPION
2011 · second_quarter · Q2
Issues associated with the environmental review of the SunZia Transmission Project LLC.
Filing targets: Army, Dept of (Other), Bureau of Land Management (BLM), Council on Environmental Quality (CEQ), Defense, Dept of (DOD), Energy, Dept of, Federal Energy Regulatory Commission (FERC), HOUSE OF REPRESENTATIVES, Interior, Dept of (DOI), SENATE
SOUTHWESTERN POWER GROUP (FKA SUNZIA TRANSMISSION) LLCOSOL TRANSMISSION PROJECT via THOMAS CHAMPION
2011 · first_quarter · RR
Provide members of Congress and staff information and secure and conduct meetings regarding federal agency processes and approvals needed for the siting of the transmission line and substations.
Provide members of Congress and staff information and secure and conduct meetings regarding federal agency processes and approvals needed for the siting of the transmission line and substations.
Provide members of Congress and staff information and secure and conduct meetings regarding federal agency processes and approvals needed for the siting of the transmission line and substations.
SOUTHWESTERN POWER GROUP (FKA SUNZIA TRANSMISSION) LLCOSOL TRANSMISSION PROJECT via THOMAS CHAMPION
2009 · third_quarter · RA
NEPA permitting reform and investment tax credit qualification for transmission properties
Filing targets: Bureau of Land Management (BLM), Council on Environmental Quality (CEQ), Defense, Dept of (DOD), Energy, Dept of, Federal Energy Regulatory Commission (FERC), HOUSE OF REPRESENTATIVES, Interior, Dept of (DOI), SENATE, U.S. Fish & Wildlife Service (USFWS), U.S. Forest Service
Filing targets: Bureau of Land Management (BLM), Council on Environmental Quality (CEQ), Defense, Dept of (DOD), Energy, Dept of, Federal Energy Regulatory Commission (FERC), HOUSE OF REPRESENTATIVES, Interior, Dept of (DOI), SENATE, U.S. Fish & Wildlife Service (USFWS), U.S. Forest Service
Filing targets: Bureau of Land Management (BLM), Council on Environmental Quality (CEQ), Defense, Dept of (DOD), Energy, Dept of, Federal Energy Regulatory Commission (FERC), HOUSE OF REPRESENTATIVES, Interior, Dept of (DOI), SENATE, U.S. Fish & Wildlife Service (USFWS), U.S. Forest Service
Filing targets: Bureau of Land Management (BLM), Council on Environmental Quality (CEQ), Defense, Dept of (DOD), Energy, Dept of, Federal Energy Regulatory Commission (FERC), HOUSE OF REPRESENTATIVES, Interior, Dept of (DOI), SENATE, U.S. Fish & Wildlife Service (USFWS), U.S. Forest Service
Filing targets: Bureau of Land Management (BLM), Council on Environmental Quality (CEQ), Defense, Dept of (DOD), Energy, Dept of, Federal Energy Regulatory Commission (FERC), HOUSE OF REPRESENTATIVES, Interior, Dept of (DOI), SENATE, U.S. Fish & Wildlife Service (USFWS), U.S. Forest Service
Filing targets: Bureau of Land Management (BLM), Council on Environmental Quality (CEQ), Defense, Dept of (DOD), Energy, Dept of, Federal Energy Regulatory Commission (FERC), HOUSE OF REPRESENTATIVES, Interior, Dept of (DOI), SENATE, U.S. Fish & Wildlife Service (USFWS), U.S. Forest Service