Reported covered position: U.S. House of Representatives, DOE, DOC, and CEQ
How to read the money
Income and expense are whole-filing amounts associated with this lobbyist, not personal compensation or an allocated share.
No topic inference: each bill number appears in source LDA issue text assigned to this lobbyist.
Endangered Salmon and Fisheries Predation Prevention Act
Client: PACIFIC NORTHWEST GENERATING COOPERATIVE (DBA PNGC POWER) · Firm: PACIFIC NORTHWEST GENERATING COOPERATIVE (DBA PNGC POWER)
1. Issues related to the modernization of the Columbia River Treaty. 2. In support of HR 3144 related to the operations of the Federal Columbia River Hydropower System. 3. In opposition to the privatization of the transmission assets of the Bonneville Power Administration. In opposition to the imposition of market-based rates for the Bonneville Power Administration. In opposition to changing the Bonneville Power Administration's current reporting structure within the Department of Energy.(Including report language to this effect in the FY19 Energy and Water Appropriations bill) 4. In support of language in the House version of the FY19 Energy and Water Appropriations bill to prohibit the use of funds to operate the Federal Columbia River Power System hydroelectric dams in a manner inconsistent with a 2017 operations plan (section 506). In support of language in the House version of the FY19 Energy and Water Appropriations bill to prohibit the use of funds for removal of any federally-owned or operated dam (section 507). 5. In support of HR 2083 and S 1702 to reduce marine mammal predation on endangered Columbia River salmon.
Specific issues are shown only where the LDA source assigned them to this lobbyist. Targets apply to the associated filing.
PACIFIC NORTHWEST GENERATING COOPERATIVE (DBA PNGC POWER) via PACIFIC NORTHWEST GENERATING COOPERATIVE (DBA PNGC POWER)
2021 · first_quarter · Q1
1. Issues related to the modernization of the Columbia River Treaty 2. Issues related to a legislative concept offered by Rep. Mike Simpson called the Columbia Basin Initiative. 3. General issues related to the competitiveness of the Bonneville Power Administration.
Filing targets: Energy, Dept of, HOUSE OF REPRESENTATIVES, SENATE
Source: Senate LDA
To provide for operations of the Federal Columbia River Power System pursuant to a certain operation plan for a specified period of time, and for other purposes.
Client: PACIFIC NORTHWEST GENERATING COOPERATIVE (DBA PNGC POWER) · Firm: PACIFIC NORTHWEST GENERATING COOPERATIVE (DBA PNGC POWER)
1. Issues related to the modernization of the Columbia River Treaty. 2. In support of HR 3144 related to the operations of the Federal Columbia River Hydropower System. 3. In opposition to the privatization of the transmission assets of the Bonneville Power Administration. In opposition to the imposition of market-based rates for the Bonneville Power Administration. In opposition to changing the Bonneville Power Administration's current reporting structure within the Department of Energy.(Including report language to this effect in the FY19 Energy and Water Appropriations bill) 4. In support of language in the House version of the FY19 Energy and Water Appropriations bill to prohibit the use of funds to operate the Federal Columbia River Power System hydroelectric dams in a manner inconsistent with a 2017 operations plan (section 506). In support of language in the House version of the FY19 Energy and Water Appropriations bill to prohibit the use of funds for removal of any federally-owned or operated dam (section 507). 5. Provided input regarding the "2019-2021 Spill Operation Agreement" for the Federal Columbia River Hydropower System. Provided input regarding the revised schedule for the completion of the Columbia River System Operations (CRSO) NEPA analysis.
To provide for operations of the Federal Columbia River Power System pursuant to a certain operation plan for a specified period of time, and for other purposes.
Client: PACIFIC NORTHWEST GENERATING COOPERATIVE (DBA PNGC POWER) · Firm: PACIFIC NORTHWEST GENERATING COOPERATIVE (DBA PNGC POWER)
1. Issues related to the modernization of the Columbia River Treaty. 2. In support of HR 3144 related to the operations of the Federal Columbia River Hydropower System. 3. In opposition to the privatization of the transmission assets of the Bonneville Power Administration. In opposition to the imposition of market-based rates for the Bonneville Power Administration. 4. In support of including language in the FY18 Omnibus Appropriations bill related to the operations of the Federal Columbia River Hydropower System. 5. In support of language in the FY18 Omnibus Appropriations bill related to streamlining vegetation management procedures.
To provide for operations of the Federal Columbia River Power System pursuant to a certain operation plan for a specified period of time, and for other purposes.
Client: PACIFIC NORTHWEST GENERATING COOPERATIVE (DBA PNGC POWER) · Firm: PACIFIC NORTHWEST GENERATING COOPERATIVE (DBA PNGC POWER)
1. Issues related to the modernization of the Columbia River Treaty. 2. In support of HR 3144 related to the operations of the Federal Columbia River Hydropower System. 3. In opposition to the privatization of the transmission assets of the Bonneville Power Administration. In opposition to the imposition of market-based rates for the Bonneville Power Administration. In opposition to changing the Bonneville Power Administration's current reporting structure within the Department of Energy.(Including report language to this effect in the FY19 Energy and Water Appropriations bill) 4. In support of language in the House version of the FY19 Energy and Water Appropriations bill to prohibit the use of funds to operate the Federal Columbia River Power System hydroelectric dams in a manner inconsistent with a 2017 operations plan (section 506). In support of language in the House version of the FY19 Energy and Water Appropriations bill to prohibit the use of funds for removal of any federally-owned or operated dam (section 507). 5. In support of HR 2083 and S 1702 to reduce marine mammal predation on endangered Columbia River salmon.
To provide for operations of the Federal Columbia River Power System pursuant to a certain operation plan for a specified period of time, and for other purposes.
Client: PACIFIC NORTHWEST GENERATING COOPERATIVE (DBA PNGC POWER) · Firm: PACIFIC NORTHWEST GENERATING COOPERATIVE (DBA PNGC POWER)
1. Issues related to the modernization of the Columbia River Treaty. 2. In support of HR 3144 related to the operations of the Federal Columbia River Hydropower System. 3. In opposition to the privatization of the transmission assets of the Bonneville Power Administration. In opposition to the imposition of market-based rates for the Bonneville Power Administration. In opposition to changing the Bonneville Power Administration's current reporting structure within the Department of Energy.(Including report language to this effect in the FY19 Energy and Water Appropriations bill) 4. In support of language in the House version of the FY19 Energy and Water Appropriations bill to prohibit the use of funds to operate the Federal Columbia River Power System hydroelectric dams in a manner inconsistent with a 2017 operations plan (section 506). In support of language in the House version of the FY19 Energy and Water Appropriations bill to prohibit the use of funds for removal of any federally-owned or operated dam (section 507).
Endangered Salmon and Fisheries Predation Prevention Act
Client: PACIFIC NORTHWEST GENERATING COOPERATIVE (DBA PNGC POWER) · Firm: PACIFIC NORTHWEST GENERATING COOPERATIVE (DBA PNGC POWER)
1. Issues related to the modernization of the Columbia River Treaty. 2. In support of HR 3144 related to the operations of the Federal Columbia River Hydropower System. 3. In opposition to the privatization of the transmission assets of the Bonneville Power Administration. In opposition to the imposition of market-based rates for the Bonneville Power Administration. In opposition to changing the Bonneville Power Administration's current reporting structure within the Department of Energy.(Including report language to this effect in the FY19 Energy and Water Appropriations bill) 4. In support of language in the House version of the FY19 Energy and Water Appropriations bill to prohibit the use of funds to operate the Federal Columbia River Power System hydroelectric dams in a manner inconsistent with a 2017 operations plan (section 506). In support of language in the House version of the FY19 Energy and Water Appropriations bill to prohibit the use of funds for removal of any federally-owned or operated dam (section 507). 5. In support of HR 2083 and S 1702 to reduce marine mammal predation on endangered Columbia River salmon.
To provide for operations of the Federal Columbia River Power System pursuant to a certain operation plan for a specified period of time, and for other purposes.
Client: PACIFIC NORTHWEST GENERATING COOPERATIVE (DBA PNGC POWER) · Firm: PACIFIC NORTHWEST GENERATING COOPERATIVE (DBA PNGC POWER)
1. Issues related to the modernization of the Columbia River Treaty. 2. In support of HR 3144 related to the operations of the Federal Columbia River Hydropower System. 3. In opposition to the privatization of the transmission assets of the Bonneville Power Administration.
To provide for operations of the Federal Columbia River Power System pursuant to a certain operation plan for a specified period of time, and for other purposes.
Client: PACIFIC NORTHWEST GENERATING COOPERATIVE (DBA PNGC POWER) · Firm: PACIFIC NORTHWEST GENERATING COOPERATIVE (DBA PNGC POWER)
1. Issues related to the modernization of the Columbia River Treaty. 2. In support of HR 3144 related to the operations of the Federal Columbia River Hydropower System. 3. In opposition to the privatization of the transmission assets of the Bonneville Power Administration.
To provide for operations of the Federal Columbia River Power System pursuant to a certain operation plan for a specified period of time, and for other purposes.
Client: PACIFIC NORTHWEST GENERATING COOPERATIVE (DBA PNGC POWER) · Firm: PACIFIC NORTHWEST GENERATING COOPERATIVE (DBA PNGC POWER)
1. Issues related to the modernization of the Columbia River Treaty. 2. Issues in support of HR 3144 related to the operations of the Federal Columbia River Hydropower System. 3. In opposition to the privatization of the transmission assets of the Bonneville Power Administration.
2020 · fourth_quarter · Q4
1. Issues related to the modernization of the Columbia River Treaty. 2. Provided input regarding operations for the Federal Columbia River Hydropower System. 3. In support of language related to modernized study of Federal Columbia River Power System (FCRPS) cost allocation. 4. Expressed concern regarding EPA's TMDL for temperature in the Columbia and Lower Snake Rivers.
Filing targets: Energy, Dept of, Environmental Protection Agency (EPA), HOUSE OF REPRESENTATIVES, SENATE, State, Dept of (DOS)
PACIFIC NORTHWEST GENERATING COOPERATIVE (DBA PNGC POWER) via PACIFIC NORTHWEST GENERATING COOPERATIVE (DBA PNGC POWER)
2020 · third_quarter · Q3
1. Issues related to the modernization of the Columbia River Treaty. 2. Provided input regarding operations for the Federal Columbia River Hydropower System. Provided input regarding the revised schedule for the completion of Columbia River System Operations (CRSO) NEPA analysis. 3. In support of language related to modernized study of Federal Columbia River Power System (FCRPS) cost allocation.
Filing targets: Energy, Dept of, HOUSE OF REPRESENTATIVES, Interior, Dept of (DOI), SENATE, State, Dept of (DOS), White House Office
PACIFIC NORTHWEST GENERATING COOPERATIVE (DBA PNGC POWER) via PACIFIC NORTHWEST GENERATING COOPERATIVE (DBA PNGC POWER)
2020 · second_quarter · Q2
1. Issues related to the modernization of the Columbia River Treaty. 2. Provided input regarding operations for the Federal Columbia River Hydropower System. Provided input regarding the revised schedule for the completion of Columbia River System Operations (CRSO) NEPA analysis. 3. In support of language related to modernized study of Federal Columbia River Power System (FCRPS) cost allocation.
Filing targets: Energy, Dept of, HOUSE OF REPRESENTATIVES, Interior, Dept of (DOI), SENATE, State, Dept of (DOS), White House Office
PACIFIC NORTHWEST GENERATING COOPERATIVE (DBA PNGC POWER) via PACIFIC NORTHWEST GENERATING COOPERATIVE (DBA PNGC POWER)
2020 · first_quarter · Q1
1. Issues related to the modernization of the Columbia River Treaty. 2. Provided input regarding operations for the Federal Columbia River Hydropower System. Provided input regarding the revised schedule for the completion of Columbia River System Operations (CRSO) NEPA analysis. 3. In support of language related to modernized study of Federal Columbia River Power System (FCRPS) cost allocation.
Filing targets: Energy, Dept of, HOUSE OF REPRESENTATIVES, Interior, Dept of (DOI), SENATE, State, Dept of (DOS), White House Office
PACIFIC NORTHWEST GENERATING COOPERATIVE (DBA PNGC POWER) via PACIFIC NORTHWEST GENERATING COOPERATIVE (DBA PNGC POWER)
2019 · fourth_quarter · Q4
1. Issues related to the modernization of the Columbia River Treaty. 2. Provided input regarding operations for the Federal Columbia River Hydropower System. Provided input regarding the revised schedule for the completion of Columbia River System Operations (CRSO) NEPA analysis. 3. In support of language related to modernized study of Federal Columbia River Power System (FCRPS) cost allocation. 4. In support of RURAL Act of 2019.
Filing targets: Energy, Dept of, HOUSE OF REPRESENTATIVES, Interior, Dept of (DOI), SENATE, State, Dept of (DOS), White House Office
PACIFIC NORTHWEST GENERATING COOPERATIVE (DBA PNGC POWER) via PACIFIC NORTHWEST GENERATING COOPERATIVE (DBA PNGC POWER)
2019 · third_quarter · Q3
1. Issues related to the modernization of the Columbia River Treaty. 2. In opposition to the privatization of the transmission assets of the Bonneville Power Administration. In opposition to the imposition of market-based rates for the Bonneville Power Administration. 3. Provided input regarding the "2019-2021 Spill Operation Agreement" for the Federal Columbia River Hydropower System. Provided input regarding the revised schedule for the completion of Columbia River System Operations (CRSO) NEPA analysis. 4. Provided input regarding the facilitation of efficient Bonneville Power Administration surplus sales into western states with state-imposed carbon markets. 5. In support of language related to modernized study of Federal Columbia River Power System (FCRPS) cost allocation.
Filing targets: Energy, Dept of, HOUSE OF REPRESENTATIVES, Interior, Dept of (DOI), SENATE, State, Dept of (DOS), White House Office
PACIFIC NORTHWEST GENERATING COOPERATIVE (DBA PNGC POWER) via PACIFIC NORTHWEST GENERATING COOPERATIVE (DBA PNGC POWER)
2019 · second_quarter · Q2
1. Issues related to the modernization of the Columbia River Treaty. 2. In opposition to the privatization of the transmission assets of the Bonneville Power Administration. In opposition to the imposition of market-based rates for the Bonneville Power Administration. 3. Provided input regarding the "2019-2021 Spill Operation Agreement" for the Federal Columbia River Hydropower System. Provided input regarding the revised schedule for the completion of Columbia River System Operations (CRSO) NEPA analysis. 4. Provided input regarding the facilitation of efficient Bonneville Power Administration surplus sales into western states with state-imposed carbon markets. 5. In support of language related to modernized study of Federal Columbia River Power System (FCRPS) cost allocation.
Filing targets: Energy, Dept of, HOUSE OF REPRESENTATIVES, Interior, Dept of (DOI), SENATE, State, Dept of (DOS), White House Office
PACIFIC NORTHWEST GENERATING COOPERATIVE (DBA PNGC POWER) via PACIFIC NORTHWEST GENERATING COOPERATIVE (DBA PNGC POWER)
2019 · first_quarter · Q1
1. Issues related to the modernization of the Columbia River Treaty. 2. In opposition to the privatization of the transmission assets of the Bonneville Power Administration. In opposition to the imposition of market-based rates for the Bonneville Power Administration. 3. Provided input regarding the "2019-2021 Spill Operation Agreement" for the Federal Columbia River Hydropower System. Provided input regarding the revised schedule for the completion of Columbia River System Operations (CRSO) NEPA analysis. 4. Provided input regarding the facilitation of efficient Bonneville Power Administration surplus sales into western states with state-imposed carbon markets.
Filing targets: Energy, Dept of, HOUSE OF REPRESENTATIVES, Interior, Dept of (DOI), SENATE, State, Dept of (DOS), White House Office
PACIFIC NORTHWEST GENERATING COOPERATIVE (DBA PNGC POWER) via PACIFIC NORTHWEST GENERATING COOPERATIVE (DBA PNGC POWER)
2018 · fourth_quarter · Q4
1. Issues related to the modernization of the Columbia River Treaty. 2. In support of HR 3144 related to the operations of the Federal Columbia River Hydropower System. 3. In opposition to the privatization of the transmission assets of the Bonneville Power Administration. In opposition to the imposition of market-based rates for the Bonneville Power Administration. In opposition to changing the Bonneville Power Administration's current reporting structure within the Department of Energy.(Including report language to this effect in the FY19 Energy and Water Appropriations bill) 4. In support of language in the House version of the FY19 Energy and Water Appropriations bill to prohibit the use of funds to operate the Federal Columbia River Power System hydroelectric dams in a manner inconsistent with a 2017 operations plan (section 506). In support of language in the House version of the FY19 Energy and Water Appropriations bill to prohibit the use of funds for removal of any federally-owned or operated dam (section 507). 5. Provided input regarding the "2019-2021 Spill Operation Agreement" for the Federal Columbia River Hydropower System. Provided input regarding the revised schedule for the completion of the Columbia River System Operations (CRSO) NEPA analysis.
Filing targets: Energy, Dept of, HOUSE OF REPRESENTATIVES, Interior, Dept of (DOI), SENATE, State, Dept of (DOS), White House Office
PACIFIC NORTHWEST GENERATING COOPERATIVE (DBA PNGC POWER) via PACIFIC NORTHWEST GENERATING COOPERATIVE (DBA PNGC POWER)
2018 · third_quarter · Q3
1. Issues related to the modernization of the Columbia River Treaty. 2. In support of HR 3144 related to the operations of the Federal Columbia River Hydropower System. 3. In opposition to the privatization of the transmission assets of the Bonneville Power Administration. In opposition to the imposition of market-based rates for the Bonneville Power Administration. In opposition to changing the Bonneville Power Administration's current reporting structure within the Department of Energy.(Including report language to this effect in the FY19 Energy and Water Appropriations bill) 4. In support of language in the House version of the FY19 Energy and Water Appropriations bill to prohibit the use of funds to operate the Federal Columbia River Power System hydroelectric dams in a manner inconsistent with a 2017 operations plan (section 506). In support of language in the House version of the FY19 Energy and Water Appropriations bill to prohibit the use of funds for removal of any federally-owned or operated dam (section 507).
Filing targets: Energy, Dept of, HOUSE OF REPRESENTATIVES, Interior, Dept of (DOI), SENATE, State, Dept of (DOS), White House Office
PACIFIC NORTHWEST GENERATING COOPERATIVE (DBA PNGC POWER) via PACIFIC NORTHWEST GENERATING COOPERATIVE (DBA PNGC POWER)
2018 · second_quarter · Q2
1. Issues related to the modernization of the Columbia River Treaty. 2. In support of HR 3144 related to the operations of the Federal Columbia River Hydropower System. 3. In opposition to the privatization of the transmission assets of the Bonneville Power Administration. In opposition to the imposition of market-based rates for the Bonneville Power Administration. In opposition to changing the Bonneville Power Administration's current reporting structure within the Department of Energy.(Including report language to this effect in the FY19 Energy and Water Appropriations bill) 4. In support of language in the House version of the FY19 Energy and Water Appropriations bill to prohibit the use of funds to operate the Federal Columbia River Power System hydroelectric dams in a manner inconsistent with a 2017 operations plan (section 506). In support of language in the House version of the FY19 Energy and Water Appropriations bill to prohibit the use of funds for removal of any federally-owned or operated dam (section 507). 5. In support of HR 2083 and S 1702 to reduce marine mammal predation on endangered Columbia River salmon.
Filing targets: Energy, Dept of, HOUSE OF REPRESENTATIVES, Interior, Dept of (DOI), SENATE, State, Dept of (DOS), White House Office
PACIFIC NORTHWEST GENERATING COOPERATIVE (DBA PNGC POWER) via PACIFIC NORTHWEST GENERATING COOPERATIVE (DBA PNGC POWER)
2018 · first_quarter · Q1
1. Issues related to the modernization of the Columbia River Treaty. 2. In support of HR 3144 related to the operations of the Federal Columbia River Hydropower System. 3. In opposition to the privatization of the transmission assets of the Bonneville Power Administration. In opposition to the imposition of market-based rates for the Bonneville Power Administration. 4. In support of including language in the FY18 Omnibus Appropriations bill related to the operations of the Federal Columbia River Hydropower System. 5. In support of language in the FY18 Omnibus Appropriations bill related to streamlining vegetation management procedures.
Filing targets: Energy, Dept of, HOUSE OF REPRESENTATIVES, Interior, Dept of (DOI), SENATE, State, Dept of (DOS), White House Office
PACIFIC NORTHWEST GENERATING COOPERATIVE (DBA PNGC POWER) via PACIFIC NORTHWEST GENERATING COOPERATIVE (DBA PNGC POWER)
2017 · fourth_quarter · Q4
1. Issues related to the modernization of the Columbia River Treaty. 2. In support of HR 3144 related to the operations of the Federal Columbia River Hydropower System. 3. In opposition to the privatization of the transmission assets of the Bonneville Power Administration.
Filing targets: Energy, Dept of, HOUSE OF REPRESENTATIVES, Interior, Dept of (DOI), SENATE, State, Dept of (DOS), White House Office
PACIFIC NORTHWEST GENERATING COOPERATIVE (DBA PNGC POWER) via PACIFIC NORTHWEST GENERATING COOPERATIVE (DBA PNGC POWER)
2017 · third_quarter · Q3
1. Issues related to the modernization of the Columbia River Treaty. 2. In support of HR 3144 related to the operations of the Federal Columbia River Hydropower System. 3. In opposition to the privatization of the transmission assets of the Bonneville Power Administration.
Filing targets: Energy, Dept of, HOUSE OF REPRESENTATIVES, SENATE, State, Dept of (DOS), White House Office
PACIFIC NORTHWEST GENERATING COOPERATIVE (DBA PNGC POWER) via PACIFIC NORTHWEST GENERATING COOPERATIVE (DBA PNGC POWER)
2017 · second_quarter · Q2
1. Issues related to the modernization of the Columbia River Treaty. 2. Issues in support of HR 3144 related to the operations of the Federal Columbia River Hydropower System. 3. In opposition to the privatization of the transmission assets of the Bonneville Power Administration.
Filing targets: Energy, Dept of, HOUSE OF REPRESENTATIVES, SENATE, White House Office
PACIFIC NORTHWEST GENERATING COOPERATIVE (DBA PNGC POWER) via PACIFIC NORTHWEST GENERATING COOPERATIVE (DBA PNGC POWER)
2017 · second_quarter · RR
Issues related to the protection of the FEDERAL COLUMBIA RIVER HYDROPOWER SYSTEM.