Legislative Progress
Introduced
December 11, 2025
Latest Action
September 16, 2026
Primary Sponsor
Julie FedorchakRepublican(ND)
Momentum (last 30 days)
0
score
0 actions · 0 new cosponsors · 0 votes
Speed vs cohort
96pct
279d open
vs 10,940 other HR bills in the 119th — cohort avg 30d
High-Capacity Grid Act This bill requires public electric utilities to use the best-available transmission conductor for certain interstate transmission lines (i.e., power lines) in order to recover the costs of the conductor through consumers' electric bills. Specifically, in any filing seeking to recover the costs of a transmission conductor for the transmission line and in any proceeding to determine if the costs may be recovered through rates, the bill directs the Federal Energy Regulatory Commission to presume that (1) the use of a best-available transmission conductor is a prudent practice and that the associated costs are just and reasonable, and (2) the use of a transmission conductor that is not a best-available transmission conductor is not prudent and that the associated costs are not just and reasonable. A best-available transmission conductor is a conductor that (1) provides the greatest feasible and commercially available energy-carrying capacity at a given voltage level, (2) provides the highest feasible and commercially available electrical efficiency at that voltage level, and (3) mitigates thermal sag (drooping of power lines) at the maximum rated transmission-carrying capacity of the facility. The bill applies to projects to (1) construct new transmission facilities; or (2) modify, upgrade, or replace an existing transmission line.
These links require the bill number to appear in the filing's source-reported specific issue text. Client expenses and lobbying-firm income are separate disclosure fields.
Received in the Senate and Read twice and referred to the Committee on Energy and Natural Resources.
Motion to reconsider laid on the table Agreed to without objection.
On motion to suspend the rules and pass the bill, as amended Agreed to by voice vote. (text: CR H5662)
Passed/agreed to in House: On motion to suspend the rules and pass the bill, as amended Agreed to by voice vote.
DEBATE - The House proceeded with forty minutes of debate on H.R. 6633.
Considered under suspension of the rules. (consideration: CR H5662-5663)
Mr. Guthrie moved to suspend the rules and pass the bill, as amended.
Placed on the Union Calendar, Calendar No. 723.
Reported (Amended) by the Committee on Energy and Commerce. H. Rept. 119-824.
Congress.gov source codes: 5000, H12200
Bills with similar content found using semantic analysis.
Sources: Congress.gov
2026 · third_quarter · Energy/Nuclear
Comprehensive Energy Policy Pipeline Construction Greenhouse Gas Energy Storage Technology Permitting Reform Energy Efficiency The POWER Act Energy Policy Reform Electric Vehicle Installation Electric Vehicle Infrastructure Training Program (EVITP) Inflation Reduction Act The PERMIT Act The SPEED Act Energy Permitting Reform Act Bipartisan American Affordability and Jobs Act Ratepayer Protection Act (H.R. 9340) High-Capacity Grid Act (H.R. 6633)
Client expense: $600,000 · Firm income: Not reported
Government targets: Energy, Dept of, HOUSE OF REPRESENTATIVES, SENATE
2026 · third_quarter · Energy/Nuclear
Powering AI H.R. 9340, Ratepayer Protection Act H.R. 9332, Load Forecasting Enhancement Act H.R. 9339, Affordable Innovation for the Grid Act H.R. 9335, Advanced Transmission Technology to Reduce Rates Act H.R. 6633, High-Capacity Grid Act H.R. 6529, Protecting Families from AI Data Center Energy Costs Act
Client expense: Not reported · Firm income: $30,000
Government targets: HOUSE OF REPRESENTATIVES, SENATE
2026 · third_quarter · Energy/Nuclear
DOE Distribution Transformer Rule; Energy efficiency, generally; Grid enhancing technologies, generally; Issues related to FERCs transmission planning and cost allocation rule (Order 1920); Issues related to FERCs regional transmission organizations, generally; Issues related to deregulation, generally; DOE Loan Program Office issues, generally (1706); Issues related to transmission legislation, generally; Issues related to grid enhancing technologies, generally; Issues related to Natural gas infrastructure development, generally; Issues related to Energy infrastructure development, generally; Issues related to FERC nominations, generally; Issues related to S.2651, the SITE Act; Issues related to Building American Energy Security Act of 2023; Issues related to regional transmission organizations, generally; Issues related to deregulation generally; Issues related to interconnection, generally; Issues related to DOE Loan Program Office, generally; Issues related to wildfires, generally; H.R. 7624, Advancing Grid-Enhancing Technologies Act of 2024; H.R. 4476, PURPA Modernization Act of 2017; H.R. 1897, ESA Amendments of 2025; S.1449 RESTART Act; Issues related to HR 1, generally; Issues related to NEPA and permitting reform, generally; Issues related to Yucca Mountain used fuel repository; Issues related to used fuel management; Issues related to consent-based siting generally; Issues related to AP1000 technology generally; Issues related to Accident Tolerant Fuel program; Issues related to advanced nuclear technology; Issues related to DOE Advanced Reactor Development Program, generally; Issues related to small modular reactors (SMRs) in general; Issues related to natural gas appliances; Issues related to DOE energy efficiency standards for electric distribution transformers; DOE new nuclear R&D programs, generally; NRC fee issues, generally; Issues related to NRC nominees in general; Issues related to the NRC decision on Subsequent License Renewal; Issues related to Subsequent License Renewal, generally; Issues related to nuclear uprates, generally; Issues related to nuclear fuels; Issues related to HAELU fuel; Issues related to distribution transformers, generally; Issues related to Transmission legislation, generally; Issues related to Energy infrastructure development, generally; Issues related to permitting reform, generally; Issues related to new nuclear risk mitigation, generally; The ADVANCE Act, P.L. 118-67; National Science Foundation Regional Innovation Engines; The SPEED and Reliability Act, generally; The BIG WIRES Act, generally H.R.3843 - Baseload Reliability Protection Act H.R.6633 - High-Capacity Grid Act H.R.6336 - Fair Allocation of Interstate Rates Act S.3852, GRID Act S.3947, REWIRE Act H.R.9340, Ratepayer Protection Act
2026 · third_quarter · Energy/Nuclear
H.R. 1047 & S. 465 - Guaranteeing Reliability through the Interconnection of Dispatchable (GRID) Power Act (transmission and siting of large transmission infrastructure). H.R. 5600 - Streamlining Powerlines Essential to Electric Demand (SPEED) and Reliability Act (transmission market reform, siting of large transmission infrastructure, and interconnection queue reform). H.R. 3657 - The Hydropower Relicensing Transparency Act (uprating and approvals of hydropower turbine replacement). H.R. 3617 - Securing Americas Critical Materials Supply Act (uranium classification as a critical material). E.O. 14179 Removing Barriers to American Leadership in Artificial Intelligence H.R. 6529 - Protecting Families from AI Data Center Energy Costs Act H.R.3898 - Promoting Efficient Review for Modern Infrastructure Today (PERMIT) Act H.R. 7329 - Fighting for Reliable Energy and Ending Doubt for Open Markets (FREEDOM) Act S. 1327 - Advancing GETs Act of 2025 S. 3034 - Reliable Power Act S. 3947 - REWIRE Act H.R. 3616 - The Reliable Power Act S.3585 DATA Act of 2026 H.R. 8033, No Harm Data Centers Act H.R. 7257, SECURE Grid Act S. 3814 - Accelerating Reliable Capacity ARC Act H.R.9332, Load Forecasting Enhancement Act H.R.9339, Affordable Innovation for the Grid Act H.R.9335 Advanced Transmission Technology to Reduce Rates Act H.R. 9340, Ratepayer Protection Act H.R. 6336, Fair Allocation of Interstate Rates Act H.R. 6633, High-Capacity Grid Act H.R. 6529, Protecting Families from AI Data Center Energy Costs Act Lowering Energy Costs through Grid Modernization Act - discussion draft Create Expedited Reviews to Transform American Infrastructure Now (CERTAIN) - discussion draft H.R. 2347 - Survivor Justice Tax Prevention Act H.R. 10500 - Unleashing American Pipelines Act S. 5653 - Bipartisan American Affordability and Jobs Act of 2026 No specific legislation: Artificial intelligence resource adequacy. Load growth. Data center issues. Energy security issues. Nuclear energy - used fuels. DoD use of nuclear energy. Resiliency. Project permitting certainty. Senate permitting reform. Executive action grid executive orders. DOE/FERC regulations on load interconnection
2026 · third_quarter · Energy/Nuclear
H. Res. Pending: Expressing support for the designation of July 10, 2026 as Journeyman Lineworkers Recognition Day.; all provisions H.R. 471: Fix Our Forests Act; all provisions H.R. 1355: Weatherization Enhancement and Readiness Act of 2025; all provisions H.R. 2072: To require the Federal Energy Regulatory Commission to extend the time period during which licensees are required to commence construction of certain hydropower projects; all provisions H.R. 2709: Save Our Sequoias Act; all provisions H.R. 3657: Hydropower Licensing Transparency Act; all provisions H.R. 3699: Energy Choice Act; all provisions H.R. 4626: Home Appliance Protection and Affordability Act; all provisions H.R. 4690: Reliable Federal infrastructure Act; all provisions H.R. 4776: Standardizing Permitting and Expediting Economic Development (SPEED) Act; all provisions H.R. 5079: Widespread Information Management for the Welfare of Infrastructure and Government Act; provisions related to critical infrastructure security/cybersecurity H.R. 6176: Electricity Transmission Scorecard Act; all provisions H.R. 6177: Grid Research and Development Act; all provisions H.R. 6473: The Facilitating Increased Resilience, Environmental Weatherization And Lowered Liability (FIREWALL) Act; all provisions H.R. 6529: Protecting Families from AI Data Center Energy Costs Act; all provisions H.R. 6633: High-Capacity Grid Act; all provisions H.R. 7257: Securing Community Upgrades for a Resilient (SECURE) Grid Act; all provisions H.R. 8495: Financial Services and General Government Appropriations Act, 2027; provisions related to spectrum H.R. 8800: National Defense Authorization Act for Fiscal Year 2027; provisions related to cybersecurity H.R. 8870: BUILD America 250 Act; provisions related to electric vehicles and charging infrastructure H.R. 8889: National Dam and Hydropower Safety Improvements Act of 2026; all provisions H.R. 9022: Energy and Water Development and Related Agencies Appropriations Act, 2027; provisions related to the Department of Energy and energy efficiency programs H.R. 9171: Department of the Interior, Environment, and Related Agencies Appropriations Act, 2027; provisions related to Tribal Health Programs H.R. 9260: Departments of Labor, Health and Human Services, and Education, and Related Agencies Appropriations Act, 2027; provisions related to the Low Income Home Energy Assistance Program funding H.R. 9332: Load Forecasting Enhancement Act; all provisions H.R. 9335: Advanced Transmission Technology to Reduce Rates Act; all provisions H.R. 9337: Hydropower Licensing Affordability Act; all provisions H.R. 9339: Affordable Innovation for the Grid Act; all provisions H.R. 9340: Ratepayer Protection Act; all provisions S. Res. 794: Expressing support for the designation of July 10, 2026 as Journeyman Lineworkers Recognition Day.; all provisions S. 1020: Build More Hydro Act; all provisions S. 1183: Maintaining and Enhancing Hydroelectricity and River Restoration Act; all provisions S. 1337: Cybersecurity Information Sharing Extension Act; all provisions S. 3500: Hydropower Licensing Transparency Act; all provisions S. 3518: FLOWS Act; all provisions S. 3852: GRID Act; all provisions S. 3926: E-Access Act; all provisions S. 5338: Energy Efficiency Reform Act of 2026; all provisions S. 5653: Bipartisan American Affordability and Jobs Act of 2026; all provisions Executive Order 14420: Declaring a National Emergency to Secure the United States Bulk-Power System; all provisions General discussions related to the Clean Air Act-Section 111(d) and EPA 111(d) rules related to Greenhouse Gas Standards and Guidelines for Fossil Fuel-Fired Power Plants General discussions related to the Clean Air Act - Section 202(a) and EPA Reconsideration of 2009 Endangerment Finding and GHG Vehicle Standards Public Law 119-21 (H.R. 1): One Big Beautiful Bill Act; provisions related to tax Public Law 119-74 (H.R. 6938): The Commerce, Justice, Science; Energy and Water Development; And Interior and Environment Appropriations Act, 2026; provisions related to Dept. of Energy, energy efficiency programs and Dept. of Interior tribal health programs Public Law 119-75 (H.R. 7148): The Consolidated Appropriations Act; provisions related to Low Income Home Energy Assistance Program funding Public Law 117-58: Infrastructure Investment and Jobs Act; all provisions related to electric vehicles, grid resilience, clean energy, energy efficiency and wildfires Public Law 117-169: Inflation Reduction Act of 2022; all provisions Public Law 115-97: Tax Cuts and Jobs Act; provisions related to interest deductibility, capital gains, dividends, and corporate tax rate Public Law 115-141: Consolidated Appropriations Act, 2018; provisions related to Section 512 of the Federal Land Policy and Management Act FCC WT Docket No. 24-99; provisions related to 900 MHz Band Spectrum FCC WT Docket No. 24-240; provisions related to 900 MHz Band Spectrum General discussions related to disaster funding General discussions related to grid security issues for critical infrastructure General discussions related to resilience tax credits and grant proposals General discussions related to wildfire safety, emergency coordination, grid modernization, liability, and permitting issues General discussions related to Counter-Uncrewed Aircraft Systems (cUAS) authority General discussions related to Uncrewed Aircraft Systems (UAS) General discussions related to cybersecurity and grid security General discussions related to nuclear issues and relicensing of Diablo Canyon Power Plant General discussions related to electromagnetic spectrum assignment, licensing, and usage General discussions related to hydrogen production and use General discussions related to California utility rate and energy procurement issues General discussions related to electric vehicles and charging infrastructure General discussion related to the National Environmental Policy Act of 1969 (NEPA) and transmission reform General discussion related to Department of Energy funding programs General discussion related to renewable natural gas production and use General discussion related to hydropower issues and relicensing of hydropower assets General discussion related to offshore wind issues General discussion related to AI/datacenter siting and electricity demand General discussion related to Energy Storage Safety Research & Development General discussion related to Geothermal energy development General discussion related to Energy and Electricity Affordability; Clean Energy and Energy Efficiency Tax Credits General discussion related to Grid planning and FERC proceedings General discussion related to natural gas issues General discussion related to power transformer supply chain issues
Ordered to be Reported (Amended) by the Yeas and Nays: 49 - 0.
Committee Consideration and Mark-up Session Held
Committee Consideration and Mark-up Session Held
Forwarded by Subcommittee to Full Committee (Amended) by Voice Vote.
Subcommittee Consideration and Mark-up Session Held
Referred to the House Committee on Energy and Commerce.
Referred to the Subcommittee on Energy.
Introduced in House
Congress.gov source codes: 1000, Intro-H
| House |
| Markup By |
| July 20, 2026 |
| Energy and Commerce Committee | House | Referred To | December 11, 2025 |
| December 11, 2025 |
| Republican |
| VA |
Client expense: $3,200,000 · Firm income: Not reported
Government targets: HOUSE OF REPRESENTATIVES, SENATE
Client expense: $2,190,000 · Firm income: Not reported
Government targets: Council on Environmental Quality (CEQ), Energy, Dept of, Federal Energy Regulatory Commission (FERC), HOUSE OF REPRESENTATIVES, Interior, Dept of (DOI), SENATE, White House Office
Client expense: $3,150,000 · Firm income: Not reported
Government targets: Agriculture, Dept of (USDA), Energy, Dept of, Executive Office of the President (EOP), Federal Communications Commission (FCC), Federal Energy Regulatory Commission (FERC), HOUSE OF REPRESENTATIVES, Interior, Dept of (DOI), Natl Telecommunications & Information Administration (NTIA), Office of Science & Technology Policy (OSTP), Pipeline & Hazardous Materials Safety Administration, SENATE, Treasury, Dept of, White House Office
2026 · third_quarter · Utilities
H. Res. Pending: Expressing support for the designation of July 10, 2026 as Journeyman Lineworkers Recognition Day.; all provisions H.R. 471: Fix Our Forests Act; all provisions H.R. 1355: Weatherization Enhancement and Readiness Act of 2025; all provisions H.R. 2072: To require the Federal Energy Regulatory Commission to extend the time period during which licensees are required to commence construction of certain hydropower projects; all provisions H.R. 3657: Hydropower Licensing Transparency Act; all provisions H.R. 3699: Energy Choice Act; all provisions H.R. 4626: Home Appliance Protection and Affordability Act; all provisions H.R. 4690: Reliable Federal infrastructure Act; all provisions H.R. 4776: Standardizing Permitting and Expediting Economic Development (SPEED) Act; all provisions H.R. 5079: Widespread Information Management for the Welfare of Infrastructure and Government Act; provisions related to critical infrastructure security/cybersecurity H.R. 5301: Promoting Innovation in Pipeline Efficiency and Safety (PIPES) Act of 2025; provisions related to pipeline safety H.R. 6176: Electricity Transmission Scorecard Act; all provisions H.R. 6177: Grid Research and Development Act; all provisions H.R. 6529: Protecting Families from AI Data Center Energy Costs Act; all provisions H.R. 6633: High-Capacity Grid Act; all provisions H.R. 7257: Securing Community Upgrades for a Resilient (SECURE) Grid Act; all provisions H.R. 8495: Financial Services and General Government Appropriations Act, 2027; provisions related to spectrum H.R. 8800: National Defense Authorization Act for Fiscal Year 2027; provisions related to cybersecurity H.R. 8889: National Dam and Hydropower Safety Improvements Act of 2026; all provisions H.R. 9022: Energy and Water Development and Related Agencies Appropriations Act, 2027; provisions related to the Department of Energy and energy efficiency programs H.R. 9171: Department of the Interior, Environment, and Related Agencies Appropriations Act, 2027; provisions related to Tribal Health Programs H.R. 9260: Departments of Labor, Health and Human Services, and Education, and Related Agencies Appropriations Act, 2027; provisions related to the Low Income Home Energy Assistance Program funding H.R. 9332: Load Forecasting Enhancement Act; all provisions H.R. 9335: Advanced Transmission Technology to Reduce Rates Act; all provisions H.R. 9337: Hydropower Licensing Affordability Act; all provisions H.R. 9338: Pipeline Safety Authorization Act of 2026; all provisions H.R. 9339: Affordable Innovation for the Grid Act; all provisions H.R. 9340: Ratepayer Protection Act; all provisions S. Res. 794: Expressing support for the designation of July 10, 2026 as Journeyman Lineworkers Recognition Day.; all provisions S. 1020: Build More Hydro Act; all provisions S. 1183: Maintaining and Enhancing Hydroelectricity and River Restoration Act; all provisions S. 1337: Cybersecurity Information Sharing Extension Act; all provisions S. 2975: PIPELINE Safety Act of 2025; all provisions S. 3500: Hydropower Licensing Transparency Act; all provisions S. 3518: FLOWS Act; all provisions S. 3852: GRID Act; all provisions S. 3926: E-Access Act; all provisions S. 5338: Energy Efficiency Reform Act of 2026; all provisions S. 5653: Bipartisan American Affordability and Jobs Act of 2026; all provisions Executive Order 14420: Declaring a National Emergency to Secure the United States Bulk-Power System; all provisions General discussions related to the Clean Air Act-Section 111(d) and EPA 111(d) rules related to Greenhouse Gas Standards and Guidelines for Fossil Fuel-Fired Power Plants General discussions related to the Clean Air Act - Section 202(a) and EPA Reconsideration of 2009 Endangerment Finding and GHG Vehicle Standards Public Law 119-74 (H.R. 6938): The Commerce, Justice, Science; Energy and Water Development; And Interior and Environment Appropriations Act, 2026; provisions related to Dept. of Energy, energy efficiency programs and Dept. of Interior tribal health programs Public Law 119-75 (H.R. 7148): The Consolidated Appropriations Act; provisions related to Low Income Home Energy Assistance Program funding FCC WT Docket No. 24-99; provisions related to 900 MHz Band Spectrum FCC WT Docket No. 24-240; provisions related to 900 MHz Band Spectrum General discussions related to resilience tax credits and grant proposals General discussions related to Counter-Uncrewed Aircraft Systems (cUAS) authority General discussions related to Uncrewed Aircraft Systems (UAS) General discussions related to wildfire safety, emergency coordination, grid modernization, liability, and permitting issues General discussions related to nuclear issues and relicensing of Diablo Canyon Power Plant General discussions related to electromagnetic spectrum assignment, licensing, and usage General discussions related to cybersecurity and grid security General discussions related to hydrogen production and use General discussions related to California utility rate and energy procurement issues General discussions related to electric vehicles and charging infrastructure General discussion related to the National Environmental Policy Act of 1969 (NEPA) and transmission reform General discussion related to Department of Energy funding programs General discussion related to renewable natural gas production and use General discussion related to hydropower issues and relicensing of hydropower assets General discussion related to offshore wind issues General discussion related to AI/datacenter siting and electricity demand General discussions related to grid security issues for critical infrastructure General discussion related to Energy Storage Safety Research & Development General discussion related to Geothermal energy development General discussion related to Energy and Electricity Affordability; Clean Energy and Energy Efficiency Tax Credits General discussion related to Grid planning and FERC proceedings General discussion related to natural gas issues General discussion related to power transformer supply chain issues
Client expense: $3,150,000 · Firm income: Not reported
Government targets: Agriculture, Dept of (USDA), Energy, Dept of, Federal Communications Commission (FCC), Federal Energy Regulatory Commission (FERC), HOUSE OF REPRESENTATIVES, Interior, Dept of (DOI), Natl Telecommunications & Information Administration (NTIA), Office of Science & Technology Policy (OSTP), Pipeline & Hazardous Materials Safety Administration, SENATE, White House Office
2026 · third_quarter · Energy/Nuclear
H.R. 1047, Grid Power Act; H.R. 1355, Weatherization Enhancement and Readiness Act; H.R. 3015, National Coal Council Reestablishment Act; H.R. 3062, Promoting Cross-Border Energy Infrastructure Act; H.R. 3157, State Energy Accountability Act; H.R. 3616, Reliable Power Act; H.R. 3617, Securing Americas Critical Minerals Supply Act; H.R. 3632, Power Plant Reliability Act; H.R. 3638, Electric Supply Chain Act; H.R. 3657, Hydropower Relicensing Transparency Act; H.R. 3843, Baseload Reliability Protection Act; H.R. 4503, ePermit Act; H.R. 5600, SPEED and Reliability Act; H.R. 6336, FAIR Act; H.R. 6633, High-Capacity Grid Act; H.R. 6983, PRICE Act; H.R. 7258, Energy Emergency Leadership Act H.R. 7729, SURGE Act; H.R. 7977, Energy Bills Relief Act of 2026; H.R. 8248, Grid Expansion and Reliability Act; H.R. 8568, Lowering Utility Bills Act; H.R. 9332, Load Forecasting Enhancement Act; H.R. 9335, Advanced Transmission Technology to Reduce Rates Act; H.R. 9339, Affordable Innovation for the Grid Act; H.R. 9340/S. 5028, Ratepayer Protection Act; HR. 3628, State Planning for Reliability and Affordability Act; S. 1327, Advancing GETs Act of 2025; S. 3034, Reliable Power Act; S. 3192, REDUCE Act; S. 3585/H.R. 8400, DATA Act; S. 3682, Power for the People Act of 2026; S. 3852, GRID Act; S. 3947, REWIRE Act; S. 4559, Energy Cost Fairness and Reliability Act; S. 465, GRID Power Act; S. 5653 Bipartisan American Affordability and Jobs Act of 2026 (BAAJA) Artificial intelligence issues generally; Data center issues generally; Distribution transformers; Draft legislation on account arrears; Draft legislation on rate filing; Draft legislation on grid supply chain; Draft legislation on microgrids; Draft legislation on permitting certainty; Draft legislation on permitting reform; Draft legislation on state PUC support Draft legislation on transmission; Draft legislation related to cybersecurity; Draft legislation related to electric grid/energy infrastructure cybersecurity; Draft legislation related to security and data; Energy Efficiency generally; Energy security issues generally; Issues related to energy grid supply chain; Issues related to energy sector impacts from tariff policies; Load growth, reliability, and resource adequacy generally
Client expense: $1,633,778 · Firm income: Not reported
Government targets: Energy, Dept of, HOUSE OF REPRESENTATIVES, SENATE
2026 · third_quarter · Energy/Nuclear
Transmission development and deployment Sustainability efforts Energy Permitting Reform H.R. XX, Ratepayer Protection Act H.R. 2703/ S. 1327, Advancing GETS Act H.R. 1077 / S. 456, STEAM Act H.R. 301, GEO Act H.R. 3838, SPEED Act H.R. 6633, High Capacity Grid Act H.R. 2122, IMPACT Act H.R. 6984, Data Center Transparency Act H.R. 6983, Preventing Rate Inflation in Consumer Energy Act S. 3947, REWIRE Act H.R. 4503, ePERMIT Act H.R. 5631, Geothermal Energy Advancement Act H.R. 1687 / S. 4960, Committing Leases for Energy Access Now (CLEAN) Act H.R. 5587 / S. 4975, Harnessing Energy at Thermal Sources (HEATS) Act S. 4116 / H.R. 8437, Geo POWER Act H.R. 8790 / S. 4406, Next-Generation Geothermal Research and Development Act S. 4610, Pacific POWER Act H.R. 7568, Hot Rock Act H.R. 6873 Geothermal Tax Parity Act
Client expense: $3,230,000 · Firm income: Not reported
Government targets: HOUSE OF REPRESENTATIVES, SENATE
2026 · third_quarter · Energy/Nuclear
H.R. 1047, Grid Power Act; H.R. 1355, Weatherization Enhancement and Readiness Act; H.R. 3015, National Coal Council Reestablishment Act; H.R. 3062, Promoting Cross-Border Energy Infrastructure Act; H.R. 3157, State Energy Accountability Act; H.R. 3616, Reliable Power Act; H.R. 3617, Securing Americas Critical Minerals Supply Act; H.R. 3632, Power Plant Reliability Act; H.R. 3638, Electric Supply Chain Act; H.R. 3657, Hydropower Relicensing Transparency Act; H.R. 3898, Promoting Efficient Review for Modern Infrastructure Today (PERMIT) Act; H.R. 3843, Baseload Reliability Protection Act; H.R. 4503, ePermit Act; H.R. 5600, SPEED and Reliability Act; H.R. 6336, FAIR Act; H.R. 6633, High-Capacity Grid Act; H.R. 6983, PRICE Act; H.R. 7258, Energy Emergency Leadership Act H.R. 7729, SURGE Act; H.R. 7977, Energy Bills Relief Act of 2026; H.R. 8248, Grid Expansion and Reliability Act; H.R. 8568, Lowering Utility Bills Act; H.R. 9332, Load Forecasting Enhancement Act; H.R. 9335, Advanced Transmission Technology to Reduce Rates Act; H.R. 9339, Affordable Innovation for the Grid Act; H.R. 9340/S. 5028, Ratepayer Protection Act; HR. 3628, State Planning for Reliability and Affordability Act; S. 1327, Advancing GETs Act of 2025; S. 3034, Reliable Power Act; S. 3192, REDUCE Act; S. 3585/H.R. 8400, DATA Act; S. 3682, Power for the People Act of 2026; S. 3852, GRID Act; S. 3947, REWIRE Act; S. 4559, Energy Cost Fairness and Reliability Act; S. 465, GRID Power Act; S. 5653 Bipartisan American Affordability and Jobs Act of 2026 (BAAJA) Artificial intelligence issues generally; Data center issues generally; Distribution transformers; Draft legislation on account arrears; Draft legislation on rate filing; Draft legislation on grid supply chain; Draft legislation on microgrids; Draft legislation on permitting certainty; Draft legislation on permitting reform; Draft legislation on state PUC support Draft legislation on transmission; Draft legislation related to cybersecurity; Draft legislation related to electric grid/energy infrastructure cybersecurity; Draft legislation related to security and data; Energy Efficiency generally; Energy security issues generally; Issues related to energy grid supply chain; Issues related to energy sector impacts from tariff policies; Load growth, reliability, and resource adequacy generally
Client expense: $300,000 · Firm income: Not reported
Government targets: HOUSE OF REPRESENTATIVES, SENATE
2026 · third_quarter · Energy/Nuclear
H.R. 471, Fix Our Forests Act; H.R. 753, FIRE Act; H.R. 1047, Grid Power Act; H.R. 1355, The Weatherization Enhancement and Readiness Act; H.R.2444 - To establish the Supply Chain Resiliency and Crisis Response Office in the Department of Commerce, and for other purposes; H.R. 2703, Advancing GETs Act; H.R. 3015, National Coal Council Reestablishment Act; H.R. 3062, Promoting Cross-Border Energy Infrastructure Act; H.R. 3157, State Energy Accountability Act; H.R. 3616, Reliable Power Act; H.R. 3617, Securing Americas Critical Minerals Supply Act; H.R. 3626 - To facilitate the development of a whole-of-government strategy for nuclear cooperation and nuclear exports, and for other purposes; HR. 3628, State Planning for Reliability and Affordability Act; H.R. 3632, Power Plant Reliability Act; H.R. 3638, Electric Supply Chain Act; H.R. 3657, Hydropower Relicensing Transparency Act; H.R. 3668, Improving Interagency Coordination for Pipeline Reviews Act; H.R. 3699, Energy Choice Act; H.R. 3843, the Baseload Reliability Protection Act; H.R. 3898, PERMIT Act; H.R. 4136 - To establish an Office of Public Engagement and Participation within the Nuclear Regulatory Commission, and for other purposes; H.R. 4503, ePermit Act; Conservation Act amendments; H.R. 5600, SPEED and Reliability Act; H.R. 6336, Fair Allocation of Interstate Rates Act; H.R. 6633 High-Capacity Grid Act; H.R. 6983 PRICE Act; H.R. 7258, Energy Emergency Leadership Act; H.R. 7729 SURGE Act; H.R. 6336, Fair Allocation of Interstate Rates (FAIR) Act; H.R. 6633 High-Capacity Grid Act; H.R. 6983 PRICE Act; H.R. 7729 SURGE Act; H.R. 7977, Energy Bills Relief Act; H.R. 8248, Grid Expansion and Reliability Act; H.R. 8568, Lowering Utility Bills Act; H.R. 9332, Load Forecasting Enhancement Act; H.R. 9335, Advanced Transmission Technology to Reduce Rates Act; H.R. 9339, Affordable Innovation for the Grid Act; H.R. 9340, Ratepayer Protection Act H.R. 9084, Department of Energy Nuclear Transparency Act; H.R.9613, Nuclear Advisory Committee Reform Act; H.R.9612, American Enrichment Deployment Act; H.R.9614, NRC Staff Pay Alignment Act H. Res. 290; Recognizing Threat of Retirement of Nonintermittent Electric Generation Facilities; S. 465, GRID Power Act; S. 914, Energy Threat Analysis Establishment Act; S. 1327 Advancing GETs Act of 2025; S. 1462, Fix Our Forests Act; S.1757 - To amend the Atomic Energy Act of 1954 to provide for more efficient hearings on nuclear facility construction applications, and for other purposes; S. 1801 -- To facilitate the development of a whole-of-government strategy for nuclear cooperation and nuclear exports, and for other purposes; S. 1945, Energy Choice Act; S. 2082, the Nuclear Refuel Act; S. 2161, NRC Office of Public Engagement and Participation Act; S. 3034 Reliable Power Act; S. 3192, REDUCE Act; S. 3585 DATA Act; S. 3682 Power for the People Act of 2026; S. 3814, the Advancing Reliable Capacity (ARC) Act; S. 3852 GRID Act; S. 3947 REWIRE Act; S. 4284, Nuclear Energy Innovation and Deployment Act; S. 4559, Energy Cost Fairness and Reliability Act; S. 5028, Ratepayer Protection Act; S. 5249, MORE American Fuel Act; S. 5653, Bipartisan American Affordability and Jobs Act of 2026 (BAAJA); 811 Locate Issues generally; Artificial intelligence issues generally; Data Center issues generally; Draft Advancing Reliable Capacity (ARC) Act; Draft legislation on permitting certainty; Draft Permitting Reform Legislation; Draft transmission legislation; Electric grid/energy infrastructure cybersecurity; Energy Emergency Leadership Act; Load growth, reliability, and resource adequacy generally; Energy security issues generally; Issues related to energy grid supply chain; Issues related to energy sector impacts from tariff policies; Distribution transformers supply chain; Energy efficiency, generally; DOE grant awards and implementation; Draft legislation on permitting certainty; NextNav 900 MHz FCC Petition; Draft Permitting our Way to an Energy Resurgence Act (POWER) Act.
Client expense: $300,000 · Firm income: Not reported
Government targets: Energy, Dept of, Federal Energy Regulatory Commission (FERC), HOUSE OF REPRESENTATIVES, SENATE, White House Office
2026 · third_quarter · Energy/Nuclear
Monitor and engage on federal legislation and administrative action related to energy provisions related to climate, carbon, power, fuel and feedstocks. Monitor and engage on federal legislation and administrative action related to circular feedstocks and R&D related automative polymers. H.R. 6336, Fair Allocation of Interstate Rates Act. H.R. 6633, High-Capacity Grid Act. H.R. 9022, Energy and Water Development and Related Agencies Appropriations Act, 2027. H.R. 9332, Load Forecasting Enhancement Act. H.R. 9335, Advanced Transmission Technology to Reduce Rates Act. H.R. 9340, Ratepayer Protection Act. S. 789, Critical Minerals Security Act of 2025.
Client expense: $1,450,000 · Firm income: Not reported
Government targets: Agriculture, Dept of (USDA), Energy, Dept of, Environmental Protection Agency (EPA), HOUSE OF REPRESENTATIVES, SENATE
2026 · third_quarter · Energy/Nuclear
HR 161 New Source Review Permitting Improvement Act; HR 3699 Energy Choice Act; HR 5301 PIPES Act of 2025; HR 6529 Protecting Families from AI Data Center Energy Costs Act; HR 6633 High-Capacity Grid Act; HR 7831 License to Drill Act; HR 8330 Stop Climate Shakedowns Act of 2026; HR 9338 Pipeline Safety Authorization Act of 2026; HR 9340 Ratepayer Protection Act (provisions relating to definitions under the bill); S 4340 Stop Climate Shakedowns Act of 2026; S 5653 A bill to prescribe permitting reform, and for other purposes; draft legislation on permitting certainty for energy projects; draft legislation relating to permitting reform; draft legislation to establish voluntary federal government GHG reporting program; 91 Fed. Reg. 1985 Subpart KKKKa-Standards of Performance for Stationary Combustion Turbines; efforts related to engagement with European Union on Corporate Sustainability Due Diligence Directive (CSDDD)
Client expense: $2,180,000 · Firm income: Not reported
Government targets: Council on Environmental Quality (CEQ), Energy, Dept of, Environmental Protection Agency (EPA), Federal Energy Regulatory Commission (FERC), HOUSE OF REPRESENTATIVES, Interior, Dept of (DOI), SENATE, U.S. Trade Representative (USTR), White House Office
2026 · third_quarter · Energy/Nuclear
Lynch, Kenneth H.R. 9340, Ratepayer Protection Act; S. 1327, Advancing GETs Act of 2025; Draft legislation on transmission; Draft legislation on permitting reform; Draft legislation on permitting certainty; Artificial intelligence issues generally; Load growth, reliability, and resource adequacy generally; Data center issues generally; Energy security issues generally; Issues related to energy grid supply chain; Draft legislation related to electric grid/energy infrastructure cybersecurity; Bayoumi, Elisa H.R. 5600, SPEED and Reliability Act; S. 1327, Advancing GETs Act of 2025; S. 5653 Bipartisan American Affordability and Jobs Act of 2026 (BAAJA) Artificial intelligence issues generally; Data center issues generally; Draft legislation on permitting certainty; Draft legislation on permitting reform; Load growth, reliability, and resource adequacy generally O'Neill, Daniel H.R. 3616, Reliable Power Act; H.R. 1047, Grid Power Act; H.R. 3632, Power Plant Reliability Act; H.R. 3638, Electric Supply Chain Act; H.R. 3157, State Energy Accountability Act; HR. 3628, State Planning for Reliability and Affordability Act; H.R. 3015, National Coal Council Reestablishment Act; H.R. 3617, Securing Americas Critical Minerals Supply Act; H.R. 3062, Promoting Cross-Border Energy Infrastructure Act; H.R. 5600, SPEED and Reliability Act; H.R. 4503, ePermit Act; H.R. 3843, Baseload Reliability Protection Act; H.R. 6336, FAIR Act; H.R. 6633, High-Capacity Grid Act; H.R. 6983, PRICE Act; H.R. 7977, Energy Bills Relief Act of 2026; H.R. 8248, Grid Expansion and Reliability Act; H.R. 8568, Lowering Utility Bills Act; H.R. 7729, SURGE Act; H.R. 9332, Load Forecasting Enhancement Act; H.R. 9339, Affordable Innovation for the Grid Act; H.R. 9335, Advanced Transmission Technology to Reduce Rates Act; H.R. 9340, Ratepayer Protection Act; H.R. 9630: BILL Drivers Act H.R. 7258, Energy Emergency Leadership Act S. 1327, Advancing GETs Act of 2025; S. 3034, Reliable Power Act; S. 3192, REDUCE Act; S. 3585/H.R. 8400, DATA Act; S. 3682, Power for the People Act of 2026; S. 3852, GRID Act; S. 3947, REWIRE Act; S. 465, GRID Power Act; S. 4559, Energy Cost Fairness and Reliability Act; Draft legislation on transmission; Draft legislation on permitting reform; Draft legislation on permitting certainty; Draft legislation on state PUC support Artificial intelligence issues generally; Load growth, reliability, and resource adequacy generally; Data center issues generally; Energy security issues generally; Energy Efficiency generally; Issues related to energy grid supply chain; Draft legislation related to cybersecurity; Draft legislation related to security and data; Distribution transformers; Draft legislation related to electric grid/energy infrastructure cybersecurity;
Client expense: $20,000 · Firm income: Not reported
Government targets: HOUSE OF REPRESENTATIVES, SENATE
2026 · third_quarter · Energy/Nuclear
Legislation and issues impacting the electric grid and infrastructure Issues relating to energy efficiency S. 3947, REWIRE Act H.R. 9335, Advanced Transmission Technology to Reduce Rates Act H.R. 6633, High Capacity Grid Act
Client expense: Not reported · Firm income: $40,000
Government targets: HOUSE OF REPRESENTATIVES, SENATE
2026 · third_quarter · Energy/Nuclear
H.R. 6633, High-Capacity Grid Act, Section 2, regarding best-available transmission conductor standards; H.R. 7257/S. 4166, SECURE Grid Act; S. 3947, REWIRE Act, Section 2; DHS implementation of the UFLPA; permitting reform legislation; Energy Policy and Conservation Act reform; critical minerals programs and domestic and international energy supply chains; transformer production and supply chain issues; Department of Energy energy efficiency programs, including building efficiency; opposition to the LIT Act; tariffs; NEMAs Make It American initiative; energy-efficiency contracting improvements; and national energy strategy.
Client expense: $580,000 · Firm income: Not reported
Government targets: Energy, Dept of, HOUSE OF REPRESENTATIVES, Homeland Security, Dept of (DHS), SENATE, U.S. Trade Representative (USTR)
2026 · third_quarter · Energy/Nuclear
- Permitting Reform. Bipartisan American Affordability and Jobs Act of 2026 (S. 5653). Broad legislation that offers permitting policy and related judicial review reforms within the NEPA, Clean Water Act, Endangered Species Act, National Historic Preservation Act, as well as enhanced FERC siting and cost-allocation backstop authority for national interest lines and permit certainty provisions to prevent the executive branch from cancelling permitted projects. -H.R. 6336, FAIR Act -H.R. 6633, High-Capacity Grid Act -H.R. 7977, Energy Bills Relief Act of 2026 -H.R. 9340/S. 5028, Ratepayer Protection Act -S. 3947, REWIRE Act -S. 5653 Bipartisan American Affordability and Jobs Act of 2026 (BAAJA) -Data center issues generally -Draft legislation on permitting reform -Draft legislation on transmission -Draft legislation related to electric grid/energy infrastructure cybersecurity -Issues related to energy grid supply chain -Issues related to energy sector impacts from tariff policies
Client expense: $260,000 · Firm income: Not reported
Government targets: HOUSE OF REPRESENTATIVES, SENATE
2026 · third_quarter · Energy/Nuclear
- issues related to permitting reform - issues related to the Reliable Power Act - H.R. 1047: GRID Power Act - PURPA 111(d) Reliability Legislation - PURPA 111(d) Clean Energy Standard Legislation - The Expediting Generator Interconnection Procedures Act - issues related to Prohibiting the Retirement of Baseload Electric Generation - issues related to electric sector security including reliability, public/private and cross-sector partnerships, information sharing and protections, incident reporting, research and development, cyber resources, liability issues, defense critical infrastructure, threat environment, supply chain, and security postures - issues related to electric grid reliability - nominations of DOE political appointees - issues related to DOE infrastructure programs and grants - issues related to DOE funding for advanced and small modular nuclear reactors - issues related to FY27 Energy and Water Appropriations - H.R. 3632, Power Plant Reliability Act of 2025 - H.R. 3062, Promoting Cross-border Energy Infrastructure Act - H.R. 1, One Big Beautiful Bill Act - H.R. 5600: SPEED and Reliability Act of 2025 - H.R. 3699: Energy Choice Act - H.R. 4669: FEMA Act of 2025 - Transformer Security Inspection Act - H.R. 3632: Power Plant Reliability Act of 2025 - H.R. 3062: Promoting Cross-border Energy Infrastructure Act - H.R. 3616: Reliable Power Act - H.R. 3843: Baseload Reliability Protection Act - H.R. 6336: FAIR Act - issues related to the Power to the People Act - H.R. 3062: Promoting Cross-Border Energy Infrastructure Act - H.R. 7266: The Rural and Municipal Utility Cybersecurity Act - H.R. 7258: The Energy Emergency Leadership Act - H.R. 7305: The Energy Threat Analysis Center Act - H.R. 161: New Source Review Permitting Act - Draft Democrat Permitting Reform Bill - Draft Load Forecasting Enhancement Act - H.R. 6633: The High-Capacity Grid Act - H.R. 6529: Protecting Families from AI Data Center Energy Costs Act - H.R. 9332: Load Forecasting Enhancement Act - H.R, 9339: Affordable Innovation for the Grid Act - H.R. 9335: Advanced Transmission Technology to Reduce Rates Act - H.R. 9340: Ratepayer Protection Act - legislation relating to microgrid development and resiliency - legislation relating to balcony solar - legislation relating to PURPA 111(d) and discounted rates for electric consumers - The POWER Act - S. 5008, the Grid Connection and Congestion Management Act - S. 5199, the GRID Savings Act of 2026 - H.R.10302, the CLEAR Act of 2026 - RATES Act of 2026 - H.R. 4338, the Weather-Safe Energy Act of 2025
Client expense: $1,289,734 · Firm income: Not reported
Government targets: HOUSE OF REPRESENTATIVES, SENATE
2026 · third_quarter · Energy/Nuclear
H.R. 3616, Reliable Power Act; H.R. 1047, Grid Power Act; H.R. 3632, Power Plant Reliability Act; H.R. 3638, Electric Supply Chain Act; H.R. 3657, Hydropower Relicensing Transparency Act; H.R. 3015, National Coal Council Reestablishment Act; H.R. 3062, Promoting Cross-Border Energy Infrastructure Act; H.R. 5600, SPEED and Reliability Act; H.R. 1355, Weatherization Enhancement and Readiness Act; H.R. 4503, ePermit Act; H.R. 3843, Baseload Reliability Protection Act; H.R. 6336, FAIR Act; H.R. 6633, High-Capacity Grid Act; H.R. 7977, Energy Bills Relief Act of 2026; H.R. 9332, Load Forecasting Enhancement Act; H.R. 9339, Affordable Innovation for the Grid Act; H.R. 9335, Advanced Transmission Technology to Reduce Rates Act; H.R. 9340, Ratepayer Protection Act; H.R. 5549/S. 1757, Efficient Nuclear Licensing Hearings Act; S. 1327, Advancing GETs Act of 2025; S. 3034, Reliable Power Act; S. 3585/H.R. 8400, DATA Act; S. 3852, GRID Act; S. 3947, REWIRE Act; S. 465, GRID Power Act; S. 4559, Energy Cost Fairness and Reliability Act; Draft legislation on transmission; Draft legislation on permitting reform; Draft legislation on permitting certainty; Artificial intelligence issues generally; Load growth, reliability, and resource adequacy generally; Data center issues generally; Energy security issues generally; Energy efficiency generally; Issues related to energy grid supply chain; Issues related to energy sector impacts from tariff policies; Draft legislation related to cybersecurity; Draft legislation related to security and data; Distribution transformers; Draft legislation related to electric grid/energy infrastructure cybersecurity; Draft legislation on microgrids; Advanced Reactor Demonstration Program generally; Advanced nuclear reactor siting issues generally; Coal power plant modernization support; Issues related to new nuclear reactor completion guarantees, including S. 3814, the Accelerating Reliable Capacity (ARC) Act; Issues related to NRC meteorological tower requirement reforms; Issues related to regional transmission organizations; Issues and draft legislation related to transmission permitting and planning; Issues related to DOE Energy Dominance Financing program; DOE SPARK grant applications
Client expense: $370,000 · Firm income: Not reported
Government targets: Energy, Dept of, Environmental Protection Agency (EPA), Federal Energy Regulatory Commission (FERC), HOUSE OF REPRESENTATIVES, Nuclear Regulatory Commission (NRC), SENATE, White House Office
2026 · third_quarter · Energy/Nuclear
S. 3814 - Accelerating Reliable Capacity (ARC) Act: Provisions related to nuclear cost overrun insurance. H.R. 3978, S. 2082 - Nuclear REFUEL (Recycling Efficient Fuels Utilizing Expedited Licensing) Act; H.R. 9612 - American Enrichment Deployment Act: Provisions related to Nuclear Regulatory Commission licensing. H.R. 6336 - FAIR Allocation of Interstate Rates Act: Provisions related to cost allocation issues for transmission based on state energy policies. S. 1241, H.R. 2548 - Sanctioning Russia Act: Provisions related to uranium imports and domestic nuclear fuel supply. S. 3585, H.R. 8400 - DATA Act: Provisions related to consumer-regulated electric utilities. H.R. 1355 - Weatherization Enhancement and Readiness Act: Provisions related to the reauthorization of the Weatherization Assistance Program. S. 5653 Bipartisan American Affordability and Jobs Act of 2026 (BAAJA): Provisions related to National Environmental Policy Act, the Clean Water Act, the Endangered Species Act, the National Historic Preservation Act, permitting project certainty and transmission. S. 465, H.R. 1047 - GRID Power Act: Provisions related to interconnection queue rules. H.R. 6633 - High-Capacity Grid Act: Provisions related to bulk electric systems with advanced conducting technologies to increase grid capacity. H.R. 9340 - Ratepayer Protection Act; Provisions related to the Ratepayer Protection Pledge, large load data centers, and grid buildout. Issues related to electricity transmission and energy grid supply chain. Issues related to permitting reform and permitting certainty. Issues related to Artificial Intelligence. Issues related to data centers. Issues related to energy efficiency. Issues related to used fuel and recycling.
Client expense: $570,000 · Firm income: Not reported
Government targets: Energy, Dept of, HOUSE OF REPRESENTATIVES, SENATE, White House Office
2026 · third_quarter · Energy/Nuclear
H.R. 1047, Grid Power Act; H.R. 1355, Weatherization Enhancement and Readiness Act; H.R. 3015, National Coal Council Reestablishment Act; H.R. 3062, Promoting Cross-Border Energy Infrastructure Act; H.R. 3157, State Energy Accountability Act; H.R. 3616, Reliable Power Act; H.R. 3617, Securing Americas Critical Minerals Supply Act; H.R. 3632, Power Plant Reliability Act; H.R. 3638, Electric Supply Chain Act; H.R. 3657, Hydropower Relicensing Transparency Act; H.R. 3843, Baseload Reliability Protection Act; H.R. 4503, ePermit Act; H.R. 5600, SPEED and Reliability Act; H.R. 6336, FAIR Act; H.R. 6633, High-Capacity Grid Act; H.R. 6983, PRICE Act; H.R. 7258, Energy Emergency Leadership Act H.R. 7729, SURGE Act; H.R. 7977, Energy Bills Relief Act of 2026; H.R. 8248, Grid Expansion and Reliability Act; H.R. 8568, Lowering Utility Bills Act; H.R. 9332, Load Forecasting Enhancement Act; H.R. 9335, Advanced Transmission Technology to Reduce Rates Act; H.R. 9339, Affordable Innovation for the Grid Act; H.R. 9340/S. 5028, Ratepayer Protection Act; HR. 3628, State Planning for Reliability and Affordability Act; S. 1327, Advancing GETs Act of 2025; S. 3034, Reliable Power Act; S. 3192, REDUCE Act; S. 3585/H.R. 8400, DATA Act; S. 3682, Power for the People Act of 2026; S. 3852, GRID Act; S. 3947, REWIRE Act; S. 4559, Energy Cost Fairness and Reliability Act; S. 465, GRID Power Act; S. 5653 Bipartisan American Affordability and Jobs Act of 2026 (BAAJA) Artificial intelligence issues generally; Data center issues generally; Distribution transformers; Draft legislation on account arrears; Draft legislation on rate filing; Draft legislation on grid supply chain; Draft legislation on microgrids; Draft legislation on permitting certainty; Draft legislation on permitting reform; Draft legislation on state PUC support Draft legislation on transmission; Draft legislation related to cybersecurity; Draft legislation related to electric grid/energy infrastructure cybersecurity; Draft legislation related to security and data; Energy Efficiency generally; Energy security issues generally; Issues related to energy grid supply chain; Issues related to energy sector impacts from tariff policies; Load growth, reliability, and resource adequacy generally
Client expense: Not reported · Firm income: $50,000
Government targets: HOUSE OF REPRESENTATIVES, SENATE
2026 · third_quarter · Energy/Nuclear
H.R. 1047, Grid Power Act; H.R. 1355, Weatherization Enhancement and Readiness Act; H.R. 3015, National Coal Council Reestablishment Act; H.R. 3062, Promoting Cross-Border Energy Infrastructure Act; H.R. 3157, State Energy Accountability Act; H.R. 3616, Reliable Power Act; H.R. 3617, Securing Americas Critical Minerals Supply Act; H.R. 3632, Power Plant Reliability Act; H.R. 3638, Electric Supply Chain Act; H.R. 3657, Hydropower Relicensing Transparency Act; H.R. 3843, Baseload Reliability Protection Act; H.R. 4503, ePermit Act; H.R. 5600, SPEED and Reliability Act; H.R. 6336, FAIR Act; H.R. 6633, High-Capacity Grid Act; H.R. 6983, PRICE Act; H.R. 7258, Energy Emergency Leadership Act H.R. 7729, SURGE Act; H.R. 7977, Energy Bills Relief Act of 2026; H.R. 8248, Grid Expansion and Reliability Act; H.R. 8568, Lowering Utility Bills Act; H.R. 9332, Load Forecasting Enhancement Act; H.R. 9335, Advanced Transmission Technology to Reduce Rates Act; H.R. 9339, Affordable Innovation for the Grid Act; H.R. 9340/S. 5028, Ratepayer Protection Act; HR. 3628, State Planning for Reliability and Affordability Act; S. 1327, Advancing GETs Act of 2025; S. 3034, Reliable Power Act; S. 3192, REDUCE Act; S. 3585/H.R. 8400, DATA Act; S. 3682, Power for the People Act of 2026; S. 3852, GRID Act; S. 3947, REWIRE Act; S. 4559, Energy Cost Fairness and Reliability Act; S. 465, GRID Power Act; S. 5653 Bipartisan American Affordability and Jobs Act of 2026 (BAAJA) Artificial intelligence issues generally; Data center issues generally; Distribution transformers; Draft legislation on account arrears; Draft legislation on rate filing; Draft legislation on grid supply chain; Draft legislation on microgrids; Draft legislation on permitting certainty; Draft legislation on permitting reform; Draft legislation on state PUC support Draft legislation on transmission; Draft legislation related to cybersecurity; Draft legislation related to electric grid/energy infrastructure cybersecurity; Draft legislation related to security and data; Energy Efficiency generally; Energy security issues generally; Issues related to energy grid supply chain; Issues related to energy sector impacts from tariff policies; Load growth, reliability, and resource adequacy generally; HR 9337, S. 5048, Hydropower Licensing Affordability Act; Hydropower generally.
Client expense: $60,000 · Firm income: Not reported
Government targets: Federal Energy Regulatory Commission (FERC), HOUSE OF REPRESENTATIVES, SENATE
2026 · third_quarter · Energy/Nuclear
H.R. 3616, Reliable Power Act; H.R. 1047, Grid Power Act; H.R. 3632, Power Plant Reliability Act; H.R. 3638, Electric Supply Chain Act; H.R. 3657, Hydropower Relicensing Transparency Act; H.R. 3015, National Coal Council Reestablishment Act; H.R. 3062, Promoting Cross-Border Energy Infrastructure Act; H.R. 5600, SPEED and Reliability Act; H.R. 1355, Weatherization Enhancement and Readiness Act; H.R. 4503, ePermit Act; H.R. 3843, Baseload Reliability Protection Act; H.R. 6336, FAIR Act; H.R. 6633, High-Capacity Grid Act; H.R. 7977, Energy Bills Relief Act of 2026; H.R. 9332, Load Forecasting Enhancement Act; H.R. 9339, Affordable Innovation for the Grid Act; H.R. 9335, Advanced Transmission Technology to Reduce Rates Act; H.R. 9340, Ratepayer Protection Act; H.R. 5549/S. 1757, Efficient Nuclear Licensing Hearings Act; S. 1327, Advancing GETs Act of 2025; S. 3034, Reliable Power Act; S. 3585/H.R. 8400, DATA Act; S. 3852, GRID Act; S. 3947, REWIRE Act; S. 465, GRID Power Act; S. 4559, Energy Cost Fairness and Reliability Act; Draft legislation on transmission; Draft legislation on permitting reform; Draft legislation on permitting certainty; Artificial intelligence issues generally; Load growth, reliability, and resource adequacy generally; Data center issues generally; Energy security issues generally; Energy efficiency generally; Issues related to energy grid supply chain; Issues related to energy sector impacts from tariff policies; Draft legislation related to cybersecurity; Draft legislation related to security and data; Distribution transformers; Draft legislation related to electric grid/energy infrastructure cybersecurity; Draft legislation on microgrids; Advanced Reactor Demonstration Program generally; Advanced nuclear reactor siting issues generally; Coal power plant modernization support; Issues related to new nuclear reactor completion guarantees, including S. 3814, the Accelerating Reliable Capacity (ARC) Act; Issues related to NRC meteorological tower requirement reforms; Issues related to regional transmission organizations; Issues and draft legislation related to transmission permitting and planning; Issues related to DOE Energy Dominance Financing program; DOE SPARK grant applications
Client expense: $380,000 · Firm income: Not reported
Government targets: Energy, Dept of, Environmental Protection Agency (EPA), Federal Energy Regulatory Commission (FERC), HOUSE OF REPRESENTATIVES, Nuclear Regulatory Commission (NRC), SENATE, White House Office
2026 · third_quarter · Energy/Nuclear
S. 5653 Bipartisan American Affordability and Jobs Act of 2026 S.5199 - GRID Savings Act of 2026 HR 6633 - High-Capacity Grid Act HR 9340 - Ratepayer Protection Act S. 3947 - REWIRE ActPermitting reform Energy availability Energy provisions within the Working Families Tax Cuts
Client expense: $100,000 · Firm income: Not reported
Government targets: Energy, Dept of, HOUSE OF REPRESENTATIVES, SENATE, White House Office
2026 · third_quarter · Energy/Nuclear
Issues related to AI energy use; Issues related to data centers; Issues related to permitting reform; Issues related to microgrid policy; H.R. 5332/S. 3269 - Liquid Cooling for AI Act of 2025 H.R. 6633 - High-Capacity Grid Act S. 3947 - REWIRE Act; H.R. 9340 - Ratepayer Protection Act; H.R. 9332 - Load Forecasting Enhancement Act; H.R. 9339 - Affordable Innovation for the Grid Act; H.R. 9335 - Advanced Transmission Technology to Reduce Rates Act; H.R. 4776 - SPEED Act; S. 5159 - Supporting Transformative Resilience, Operations, and Next-Generation Grid Innovation Deployment Act.
Client expense: $720,000 · Firm income: Not reported
Government targets: HOUSE OF REPRESENTATIVES, SENATE
2026 · third_quarter · Energy/Nuclear
H.R. 1047, Grid Power Act, provisions relating to FERC reform and the interconnection queue process for certain projects; H.R. 3062, Promoting Cross-Border Energy Infrastructure Act; provisions relating relating to streamlining approval and permitting for energy infrastructure projects; H.R. 3157, State Energy Accountability Act, provisions relating to clean energy standards H.R. 3616, Reliable Power Act, provisions relating to grid reliability; H.R. 3628, State Planning for Reliability and Affordability Act; provisions relating to amending PURPA, H.R. 3632, Power Plant Reliability Act, provisions relating to grid reliability; H.R. 3638, Electric Supply Chain Act, provisions relating to assessing and strengthening the supply chains for electricity generation and transmission; H.R. 5600, SPEED and Reliability Act, provisions relating to federal backstop siting reform; H.R. 6336, Fair Allocation of Interstate Rates Act (FAIR Act), provisions relating to use of regional cost allocation for projects; H.R. 6633, High Capacity Grid Act, provisions relating FERC to mandate use of best available, high capacity low sag conductors for new projects and rebuilds; H.R. 9340/ S. 5028, Ratepayer Protection Act; provisions relating to amending PURPA to establish a federal standard for grid upgrades that serve large load customer; S. 4193, Wildfire and Grid Reliability Act, provisions relating to power grid reliability issues; S. 5653 Bipartisan American Affordability and Jobs Act of 2026 (BAAJA); provisions related to permitting, environmental review, and transmission reforms; Draft legislation relating to cybersecurity; Draft legislation relating to transmission; FERC issues generally; Federal policy regarding matters impacting the energy industry, including: Energy grid supply chain; The Federal Power Act; Minimum transfer capacity; Electric transmission competition; and Transmission siting and permitting.
Client expense: $170,000 · Firm income: Not reported
Government targets: Executive Office of the President (EOP), Federal Energy Regulatory Commission (FERC), HOUSE OF REPRESENTATIVES, SENATE
2026 · third_quarter · Energy/Nuclear
Issues related to clean energy project development (including siting, permitting, interconnection or contracting), electricity market design, transmission, energy storage, demand response, and load growth. Legislation and regulatory policies impacting existing fossil and nuclear power plants. Sections of the following bills related to these topics: H.R.2347: Survivor Justice Tax Prevention Act, issues related to the Bipartisan American Affordability and Jobs Act and related discussion drafts; H.R.2074: POWER Act; H.R.8308: CERTAIN Act; H.R.6633: High-Capacity Grid Act; S.3947: REWIRE Act; H.R.7977: Energy Bills Relief Act; S.4116/H.R.8437: Geo POWER Act; H.R.5631: Geothermal Energy Advancement Act; S.3814: ARC Act of 2026; H.R.7595: TVA IRP Act; H.R.9340 and S.5028, the Ratepayer Protection Act; S.4784, the National Defense Authorization Act; H.R.4776 SPEED Act. Potential regulatory actions regarding the Bonneville Power Administration's Day-Ahead market decision. Draft legislation on Data Center Interconnection. Potential legislation to reauthorize the Grid Resilience and Innovation Partnerships program. Permitting issues related to the National Historic Preservation Act, the National Environmental Policy Act, the Endangered Species Act, Section 401 of the Clean Water Act, and the Federal Power Act, including transmission siting authority, interregional transmission planning, cost allocation, local transmission oversight, utility disclosure, and advanced transmission technologies. Federal policy affecting deployment of advanced nuclear and geothermal energy.
Client expense: $140,000 · Firm income: Not reported
Government targets: Energy, Dept of, HOUSE OF REPRESENTATIVES, SENATE, White House Office
2026 · third_quarter · Utilities
Issues related to the U.S. electric grid including cybersecurity, reliability, resilience, competition in transmission projects, and permitting reform; H.R.6633, High-Capacity Grid Act.
Client expense: Not reported · Firm income: $60,000
Government targets: HOUSE OF REPRESENTATIVES, SENATE
2026 · third_quarter · Energy/Nuclear
S.914, Energy Threat Analysis Center Establishment Act; Draft legislation on the interconnection queue; Draft legislation on power reliability; Draft legislation on transmission; Artificial intelligence issues generally; Load growth, reliability, and resource adequacy generally; Data center issues generally; Energy security issues generally; Issues related to energy grid supply chain; Issues related to energy sector impacts from tariff policies; Energy Efficiency generally; Draft legislation related to cybersecurity; Draft legislation related to security and data; Distribution transformers; Draft legislation related to electric grid/energy infrastructure cybersecurity H.R. 1355, the Weatherization Enhancement and Readiness Act H. J. RES. 20, S.J. RES 4. Energy Conservation Program: Energy Conservation H.R. 3699, Energy Choice Act H.R. 3616, Reliable Power Act H.R. 1047, Grid Power Act H.R. 3632, Power Plant Reliability Act H.R. 3638, Electric Supply Chain Act H.R. 3157, State Energy Accountability Act HR. 3628, State Planning for Reliability and Affordability Act H.R. 3657, Hydropower Relicensing Transparency Act H.R. 3015, National Coal Council Reestablishment Act H.R. 3617, Securing Americas Critical Minerals Supply Act H.R. 3062, Promoting Cross-Border Energy Infrastructure Act H.R. 3843, Baseload Reliability Protection Act H.R. 4690, Reliable Federal Infrastructure Act H.R. 4626, Dont Mess with My Home Appliances Act, EPCA reform H.R. 5600, SPEED and Reliability Act H.R. 4503, ePermit Act Standards for Consumer Gas-fired Instantaneous Water Heaters; Public Law No. 117-169 Inflation Reduction Act Permitting Reform generally Gas Electric Coordination Energy Access Discussion Draft-Two Product Classes Next Generation Pipelines Research and Development Act H.R. 3668. Improving Interagency Coordination for Pipeline Reviews Act H.R. 3898 Promoting Efficient Review for Modern Infrastructure Today (PERMIT) Act. EPCA Reform H.R.6264 - Path to Affordable Homes Act of 2025 Energy Star Furnace Rule Greenhouse Gas Reporting Program (GHGRP) H.R. 6336, FAIR Act H.R. 6633, High‑Capacity Grid Act H.R. 6983, PRICE Act H.R. 7197 Energy Bills Relief Act S. 1327, Advancing GETs Act of 2025 S. 3034, Reliable Power Act S. 3585, DATA Act S. 3682, Power for the People Act of 2026 S. 3852, GRID Act S. 3947, REWIRE Act S. 465, GRID Power Act H.R. 7729, SURGE Act H.R. 7926 Stop Unfair Electricity Prices Act Draft legislation on permitting certainty Draft legislation on microgrids Hydrogen Draft State Energy Oversight Act Draft Federal Utility Affordability Program H.R. 7977, Energy Bills Relief Act of 2026 H.R. 8248, Grid Expansion and Reliability Act H.R. 8568, Lowering Utility Bills Act H.R. 9332, Load Forecasting Enhancement Act H.R. 9339, Affordable Innovation for the Grid Act H.R. 9335, Advanced Transmission Technology to Reduce Rates Act H.R. 9340, Ratepayer Protection Act H.R. 7258, Energy Emergency Leadership Act S. 3192, REDUCE Act S. 3585/H.R. 8400, DATA Act S. 4559, Energy Cost Fairness and Reliability Act S. 5653, Bipartisan American Affordability and Jobs Act of 2026 Draft legislation on account arrears Draft legislation on rate filing Draft legislation on grid supply chain Draft legislation on permitting reform Draft legislation on state PUC support
Client expense: $150,000 · Firm income: Not reported
Government targets: HOUSE OF REPRESENTATIVES, SENATE
2026 · third_quarter · Energy/Nuclear
Electrification policy; energy efficiency; grid and cyber security; transmissions; permitting reform; HR. 6633 High Capacity Grid Act alongside REWIRE Act
Client expense: Not reported · Firm income: $50,000
Government targets: HOUSE OF REPRESENTATIVES, SENATE
2026 · third_quarter · Energy/Nuclear
Appliance efficiency standards, generally; Clean electrification issues generally and including electric vehicle (EV) charging and indoor agriculture; Clean energy issues and technologies, generally and including renewable natural gas; Coal-based generation issues including air quality standards and coal combustion residuals; Data centers and other large electric customer issues, generally; and specifically, H.R. 9340 - Ratepayer Protection Act; Economic development and job growth in the company's region, generally; Electric distribution and transmission policy, generally, including advanced transmission technologies, transmission reconductoring, and grid-enhancing technologies; and specifically, H.R. 6336 - Fair Allocation of Interstate Rates Act, H.R. 6633 - High-Capacity Grid Act; Energy efficiency and weatherization issues, generally; Energy storage issues, generally; Energy supply and capacity needs for the Midwest; Environmental remediation efforts; Environmental Protection Agency (EPA) regulation, generally and specifically greenhouse gas emission standards and water quality standards; Federal Energy Regulatory Commission (FERC) issues, generally, and specifically issues impacting the Midcontinent Independent System Operator (MISO); Grid modernization issues, generally; Grid resiliency issues, generally; Hydroelectric power issues generally; Infrastructure Investment and Jobs Act (IIJA) implementation, including Hydrogen Hub, Electric Vehicle Charging Infrastructure, and Grid Resilience and Innovation Partnerships (GRIP) Grant opportunities; Interconnection issues, including queue reform; Low Income Home Energy Assistance Program (LIHEAP) funding and energy assistance, generally; Nuclear energy topics generally, including nuclear energy development, nuclear fuel, spent fuel, fuel storage, and advanced reactors; Reliability issues, generally, and specifically Army Corps of Engineers' river management impacts to power plants; Resource adequacy issues, generally; Security issues generally; Siting and permitting of energy and transmission infrastructure, generally, including local electric company right of first refusal, and specifically, the SPEED Act, the PERMIT Act, and the Bipartisan American Affordability and Jobs Act; Regional and interregional transmission planning and cost allocation policy, generally. Supply chain issues specific to the electric energy industry including critical mineral mining, transformer, and solar panel availability; Wind energy siting and permitting; Wildfire and other extreme weather mitigation and resilience, generally.
Client expense: $180,000 · Firm income: Not reported
Government targets: HOUSE OF REPRESENTATIVES, SENATE
2026 · third_quarter · Energy/Nuclear
Electricity transmission and energy infrastructure issues; HR6633 High-Capacity Grid Act
Client expense: Not reported · Firm income: $20,000
Government targets: HOUSE OF REPRESENTATIVES
2026 · third_quarter · Energy/Nuclear
Permitting Reform. Bipartisan American Affordability and Jobs Act of 2026 (S. 5653) and broader permitting discussions H.R. 633 Fair Allocation of Interstate Rates Act or the FAIR Act High-Capacity Grid Act (H.R. 6633) H.R. 9340 Ratepayer Protection Act
Client expense: $220,000 · Firm income: Not reported
Government targets: HOUSE OF REPRESENTATIVES, SENATE
2026 · third_quarter · Energy/Nuclear
H.R. 9340 - Ratepayer Protection Act H.R. 9332 - Load Forecasting Enhancement Act H.R. 9339 - Affordable Innovation for the Grid Act H.R. 6633 - High Capacity Grid Act Executive actions and orders affecting federally funded energy projects and programs Monitored actions by federal agencies related to energy/nuclear projects
Client expense: $10,000 · Firm income: Not reported
Government targets: HOUSE OF REPRESENTATIVES
2026 · second_quarter · Energy/Nuclear
Issues related to clean energy project development (including siting, permitting, interconnection or contracting), electricity market design, transmission, energy storage, demand response, load growth, or micro grid projects. Legislation and regulatory policies impacting existing fossil and nuclear power plants. Sections of the following bills related to these topics: Draft legislation on permitting and transmission reform. H.R.6633: High-Capacity Grid Act; S.3814: ARC Act of 2026; H.R.5631, the Geothermal Energy Advancement Act; H.R.2072/S.1020: A bill on hydro relicensing; S.4116/H.R.8437: Geo POWER Act; Nuclear REFUEL Act; H.R.7977: Energy Bill Relief Act; H.R.4128: CIRCUIT Act; H.R.4776 SPEED Act; S.3947: REWIRE Act; H.R.8308: the CERTAIN Act; S.4795: FREEDOM Act; H.R.1687: the CLEAN Act; H.R.301: GEO Act; S.456/H.R.1077 STEAM Act. Draft legislation on Data Center Interconnection. White House implementation of the Ratepayer Protection Pledge. Permitting issues related to the National Historic Preservation Act, the National Environmental Protection Act, the Endangered Species Act, the Clean Water Act, Federal Power Act, PURPA, and the Geothermal Steam Act of 1970. Potential legislation to reauthorize the Grid Resilience and Innovation Partnerships program.
Client expense: $200,000 · Firm income: Not reported
Government targets: Energy, Dept of, HOUSE OF REPRESENTATIVES, Interior, Dept of (DOI), SENATE, White House Office
2026 · first_quarter · Energy/Nuclear
Issues related to clean energy project development (including siting, permitting, interconnection or contracting), electricity market design, transmission, energy storage, demand response or micro grid projects. Legislation and regulatory policies impacting existing fossil and nuclear power plants. H.R.301: Geothermal Energy Opportunity (GEO) Act; H.R.573: Studying NEPAs Impact on Projects Act; H.R.603: Reinforcing the Grid Against Extreme Weather Act; H.R.1047: Guaranteeing Reliability through the Interconnection of Dispatchable (GRID) Power Act (queue jumping); H.R.1077/S.456: Streamlining Thermal Energy Through Advanced Mechanisms (STEAM) Act; H.R.1698: Committing Leases for Energy Access Now (CLEAN) Act; H.R.1994: Public Land Renewable Energy Development Act of 2025; H.R.2072/S.1020: A bill on hydro relicensing; H.R.2301: To promote the development of renewable energy on public land, and for other purposes.; H.R.2703: Advancing Grid-Enhancing Technologies Act of 2025; H.R.2813: Small Modular Reactor Commercialization Act; H.R.2986: Expediting Generator Interconnection Procedures Act of 2025; H.R.3638: Electric Supply Chain Act; H.R.3751: Reliable Grid Act; H.R.4503: ePermit Act; H.R.4776: Standardizing Permitting and Expediting Economic Development (SPEED) Act; H.R.5576: Enhancing Geothermal Production on Federal Lands Act; H.R.5587: Harnessing Energy At Thermal Sources (HEATS) Act; H.R.5600: SPEED and Reliability Act; H.R.5631: Geothermal Ombudsman for National Deployment and Optimal Review Act; H.R.5639/S.896: Co-location Energy Act; H.R.5964: Integrated Resource Planning Modernization Act; H.R.6176: Electricity Transmission Scorecard Act; H.R. 6287: Rural Energy for America Program (REAP) Modernization Act of 2025; H.R.6336/S.3287: Fair Allocation of Interstate Rates Act (changes to beneficiary pays cost allocation); H.R.6357: TVA Increase Rate of Participation (TVA IRP) Act; H.R.6529: Protecting Families from AI Data Center Energy Costs Act; H.R.6633: High-Capacity Grid Act; H.R.6709: Office of Fusion Act; H.R.6805: Expand scope of the advanced reactor demonstration program; as well as the Create Expedited Reviews to Transform American Infrastructure Now (CERTAIN) Act discussion draft; H.R.522:, the Unleashing Low-Cost Rural AI Act; S.3088/H.R.5441: the Fusion Advanced Manufacturing Parity Act; S.3016: the Advancing Research in Nuclear Fuel Recycling Act of 2025; H.R.1687: the CLEAN Act; S.1183: Maintaining and Enhancing Hydroelectricity and River Restoration Act of 2025. H.R.7568: Hot Rock Act; S. 3814: ARC Act of 2026; S.3518: the Fair Licensing for Operations of Water Structures (FLOWS) Act; H.R.6474: To amend the Internal Revenue Code of 1986 to expand the meaning and eligibility of energy communities for purposes of the increased renewable electricity production and increased clean electricity investment credit rates; H.R.3657 Hydropower Licensing Transparency Act; S.1968 Working Waterfronts Act; H.R.5597 BECCS Advancement Commission Act; HR.5617 Geothermal Gold Book Development Act; H.R.7606: the Powering Productivity Act; H.R.7607: the Energy METRIC Act; H.R.7741/S.3926: digital energy management tools; S.3497: the Reconductoring Existing Wires for Infrastructure Reliability and Expansion (REWIRE) Act; S.4166: the GEO Power Act
Client expense: $210,000 · Firm income: Not reported
Government targets: Energy, Dept of, HOUSE OF REPRESENTATIVES, Interior, Dept of (DOI), SENATE, White House Office
2026 · second_quarter · Energy/Nuclear
H.R. 3616, Reliable Power Act; H.R. 1047, Grid Power Act; H.R. 3632, Power Plant Reliability Act; H.R. 3638, Electric Supply Chain Act; H.R. 3157, State Energy Accountability Act; HR. 3628, State Planning for Reliability and Affordability Act; H.R. 3657, Hydropower Relicensing Transparency Act; H.R. 3015, National Coal Council Reestablishment Act; H.R. 3617, Securing Americas Critical Minerals Supply Act; H.R. 3062, Promoting Cross-Border Energy Infrastructure Act; H.R. 5600, SPEED and Reliability Act; H.R. 1355, Weatherization Enhancement and Readiness Act; H.R. 4503, ePermit Act; H.R. 3843, Baseload Reliability Protection Act; H.R. 6336, FAIR Act; H.R. 6633, High-Capacity Grid Act; H.R. 6983, PRICE Act; H.R. 7977, Energy Bills Relief Act of 2026; H.R. 8248, Grid Expansion and Reliability Act; H.R. 8568, Lowering Utility Bills Act; H.R. 7729, SURGE Act; H.R. 9332, Load Forecasting Enhancement Act; H.R. 9339, Affordable Innovation for the Grid Act; H.R. 9335, Advanced Transmission Technology to Reduce Rates Act; H.R. 9340, Ratepayer Protection Act; H.R. 7258, Energy Emergency Leadership Act S. 1327, Advancing GETs Act of 2025; S. 3034, Reliable Power Act; S. 3192, REDUCE Act; S. 3585/H.R. 8400, DATA Act; S. 3682, Power for the People Act of 2026; S. 3852, GRID Act; S. 3947, REWIRE Act; S. 465, GRID Power Act; S. 4559, Energy Cost Fairness and Reliability Act; Draft legislation on transmission; Draft legislation on permitting reform; Draft legislation on permitting certainty; Draft legislation on microgrids; Draft legislation on account arrears; Draft legislation on state PUC support Artificial intelligence issues generally; Load growth, reliability, and resource adequacy generally; Data center issues generally; Energy security issues generally; Energy Efficiency generally; Issues related to energy grid supply chain; Issues related to energy sector impacts from tariff policies; Draft legislation related to cybersecurity; Draft legislation related to security and data; Distribution transformers; Draft legislation related to electric grid/energy infrastructure cybersecurity.
Client expense: $90,000 · Firm income: Not reported
Government targets: Federal Energy Regulatory Commission (FERC), HOUSE OF REPRESENTATIVES, SENATE
2026 · second_quarter · Energy/Nuclear
Powering AI H.R. 9340, Ratepayer Protection Act H.R. 9332, Load Forecasting Enhancement Act H.R. 9339, Affordable Innovation for the Grid Act H.R. 9335, Advanced Transmission Technology to Reduce Rates Act H.R. 6633, High-Capacity Grid Act H.R. 6529, Protecting Families from AI Data Center Energy Costs Act
Client expense: Not reported · Firm income: $30,000
Government targets: HOUSE OF REPRESENTATIVES, SENATE
2026 · second_quarter · Energy/Nuclear
H.R. 1047 & S. 465 - Guaranteeing Reliability through the Interconnection of Dispatchable (GRID) Power Act (transmission and siting of large transmission infrastructure). H.R. 5600 - Streamlining Powerlines Essential to Electric Demand (SPEED) and Reliability Act (transmission market reform, siting of large transmission infrastructure, and interconnection queue reform). H.R. 3657 - The Hydropower Relicensing Transparency Act (uprating and approvals of hydropower turbine replacement). H.R. 3617 - Securing Americas Critical Materials Supply Act (uranium classification as a critical material). E.O. 14179 Removing Barriers to American Leadership in Artificial Intelligence H.R. 6529 - Protecting Families from AI Data Center Energy Costs Act H.R.3898 - Promoting Efficient Review for Modern Infrastructure Today (PERMIT) Act H.R. 7329 - Fighting for Reliable Energy and Ending Doubt for Open Markets (FREEDOM) Act S. 1327 - Advancing GETs Act of 2025 S. 3034 - Reliable Power Act S. 3947 - REWIRE Act H.R. 3616 - The Reliable Power Act S.3585 DATA Act of 2026 H.R. 8033, No Harm Data Centers Act H.R. 7257, SECURE Grid Act S. 3814 - Accelerating Reliable Capacity ARC Act H.R.9332, Load Forecasting Enhancement Act H.R.9339, Affordable Innovation for the Grid Act H.R.9335 Advanced Transmission Technology to Reduce Rates Act H.R. 9340, Ratepayer Protection Act H.R. 6336, Fair Allocation of Interstate Rates Act H.R. 6633, High-Capacity Grid Act H.R. 6529, Protecting Families from AI Data Center Energy Costs Act Lowering Energy Costs through Grid Modernization Act - discussion draft Create Expedited Reviews to Transform American Infrastructure Now (CERTAIN) - discussion draft No specific legislation: Artificial intelligence resource adequacy. Load growth. Data center issues. Energy security issues. Nuclear energy - used fuels. DoD use of nuclear energy. Resiliency. Project permitting certainty. Senate permitting reform. Executive action grid executive orders. DOE/FERC regulations on load interconnection
Client expense: $2,280,000 · Firm income: Not reported
Government targets: Council on Environmental Quality (CEQ), Energy, Dept of, Federal Energy Regulatory Commission (FERC), HOUSE OF REPRESENTATIVES, Interior, Dept of (DOI), SENATE, White House Office
2026 · second_quarter · Energy/Nuclear
Permitting reforms including AI and electricity infrastructure. H.R. 9340, Ratepayer Protection Act H.R. 9332, Load Forecasting Enhancement Act H.R. 9339, Affordable Innovation for the Grid Act H.R. 9335, Advanced Transmission Technology to Reduce Rates Act H.R. 6633, High-Capacity Grid Act H.R. 6529, Protecting Families from AI Data Center Energy Costs Act
Client expense: Not reported · Firm income: $30,000
Government targets: Energy, Dept of, HOUSE OF REPRESENTATIVES, SENATE, White House Office
2026 · second_quarter · Energy/Nuclear
DOE Distribution Transformer Rule; Energy efficiency, generally; Grid enhancing technologies, generally; Issues related to FERCs transmission planning and cost allocation rule (Order 1920); Issues related to FERCs regional transmission organizations, generally; Issues related to deregulation, generally; DOE Loan Program Office issues, generally (1706); Issues related to transmission legislation, generally; Issues related to grid enhancing technologies, generally; Issues related to Natural gas infrastructure development, generally; Issues related to Energy infrastructure development, generally; Issues related to FERC nominations, generally; Issues related to S.2651, the SITE Act; Issues related to Building American Energy Security Act of 2023; Issues related to regional transmission organizations, generally; Issues related to deregulation generally; Issues related to interconnection, generally; Issues related to DOE Loan Program Office, generally; Issues related to wildfires, generally; H.R. 7624, Advancing Grid-Enhancing Technologies Act of 2024; H.R. 4476, PURPA Modernization Act of 2017; H.R. 1897, ESA Amendments of 2025; S.1449 RESTART Act; Issues related to HR 1, generally; Issues related to NEPA and permitting reform, generally; Issues related to Yucca Mountain used fuel repository; Issues related to used fuel management; Issues related to consent-based siting generally; Issues related to AP1000 technology generally; Issues related to Accident Tolerant Fuel program; Issues related to advanced nuclear technology; Issues related to DOE Advanced Reactor Development Program, generally; Issues related to small modular reactors (SMRs) in general; Issues related to natural gas appliances; Issues related to DOE energy efficiency standards for electric distribution transformers; DOE new nuclear R&D programs, generally; NRC fee issues, generally; Issues related to NRC nominees in general; Issues related to the NRC decision on Subsequent License Renewal; Issues related to Subsequent License Renewal, generally; Issues related to nuclear uprates, generally; Issues related to nuclear fuels; Issues related to HAELU fuel; Issues related to distribution transformers, generally; Issues related to Transmission legislation, generally; Issues related to Energy infrastructure development, generally; Issues related to permitting reform, generally; Issues related to new nuclear risk mitigation, generally; The ADVANCE Act, P.L. 118-67; National Science Foundation Regional Innovation Engines; The SPEED and Reliability Act, generally; The BIG WIRES Act, generally H.R.3843 - Baseload Reliability Protection Act H.R.6633 - High-Capacity Grid Act H.R.6336 - Fair Allocation of Interstate Rates Act S.3852, GRID Act S.3947, REWIRE Act H.R.9340, Ratepayer Protection Act
Client expense: $3,220,000 · Firm income: Not reported
Government targets: HOUSE OF REPRESENTATIVES, SENATE
2026 · second_quarter · Energy/Nuclear
H.R. 1047 & S. 465 - Guaranteeing Reliability through the Interconnection of Dispatchable (GRID) Power Act (transmission and siting of large transmission infrastructure). H.R. 5600 - Streamlining Powerlines Essential to Electric Demand (SPEED) and Reliability Act (transmission market reform, siting of large transmission infrastructure, and interconnection queue reform). H.R. 3657 - The Hydropower Relicensing Transparency Act (uprating and approvals of hydropower turbine replacement). H.R. 3617 - Securing Americas Critical Materials Supply Act (uranium classification as a critical material). E.O. 14179 Removing Barriers to American Leadership in Artificial Intelligence H.R. 6529 - Protecting Families from AI Data Center Energy Costs Act H.R.3898 - Promoting Efficient Review for Modern Infrastructure Today (PERMIT) Act H.R. 7329 - Fighting for Reliable Energy and Ending Doubt for Open Markets (FREEDOM) Act S. 1327 - Advancing GETs Act of 2025 S. 3034 - Reliable Power Act S. 3947 - REWIRE Act H.R. 3616 - The Reliable Power Act S.3585 DATA Act of 2026 H.R. 8033, No Harm Data Centers Act H.R. 7257, SECURE Grid Act S. 3814 - Accelerating Reliable Capacity ARC Act H.R.9332, Load Forecasting Enhancement Act H.R.9339, Affordable Innovation for the Grid Act H.R.9335 Advanced Transmission Technology to Reduce Rates Act H.R. 9340, Ratepayer Protection Act H.R. 6336, Fair Allocation of Interstate Rates Act H.R. 6633, High-Capacity Grid Act H.R. 6529, Protecting Families from AI Data Center Energy Costs Act Lowering Energy Costs through Grid Modernization Act - discussion draft Create Expedited Reviews to Transform American Infrastructure Now (CERTAIN) - discussion draft No specific legislation: Artificial intelligence resource adequacy. Load growth. Data center issues. Energy security issues. Nuclear energy - used fuels. DoD use of nuclear energy. Resiliency. Project permitting certainty. Senate permitting reform. Executive action grid executive orders. DOE/FERC regulations on load interconnection
Client expense: $2,280,000 · Firm income: Not reported
Government targets: Council on Environmental Quality (CEQ), Energy, Dept of, Federal Energy Regulatory Commission (FERC), HOUSE OF REPRESENTATIVES, SENATE, White House Office
2026 · second_quarter · Energy/Nuclear
- issues related to permitting reform - issues related to the Reliable Power Act - H.R. 1047: GRID Power Act - PURPA 111(d) Reliability Legislation - PURPA 111(d) Clean Energy Standard Legislation - The Expediting Generator Interconnection Procedures Act - issues related to Prohibiting the Retirement of Baseload Electric Generation - issues related to electric sector security including reliability, public/private and cross-sector partnerships, information sharing and protections, incident reporting, research and development, cyber resources, liability issues, defense critical infrastructure, threat environment, supply chain, and security postures - issues related to electric grid reliability - nominations of DOE political appointees - issues related to DOE infrastructure programs and grants - issues related to DOE funding for advanced and small modular nuclear reactors - issues related to FY27 Energy and Water Appropriations - H.R. 3632, Power Plant Reliability Act of 2025 - H.R. 3062, Promoting Cross-border Energy Infrastructure Act - H.R. 1, One Big Beautiful Bill Act - H.R. 5600: SPEED and Reliability Act of 2025 - H.R. 3699: Energy Choice Act - H.R. 4669: FEMA Act of 2025 - Transformer Security Inspection Act - H.R. 3632: Power Plant Reliability Act of 2025 - H.R. 3062: Promoting Cross-border Energy Infrastructure Act - H.R. 3616: Reliable Power Act - H.R. 3843: Baseload Reliability Protection Act - H.R. 6336: FAIR Act - issues related to the Power to the People Act - H.R. 3062: Promoting Cross-Border Energy Infrastructure Act - H.R. 7266: The Rural and Municipal Utility Cybersecurity Act - H.R. 7258: The Energy Emergency Leadership Act - H.R. 7305: The Energy Threat Analysis Center Act - H.R. 161: New Source Review Permitting Act - Draft Democrat Permitting Reform Bill - Draft Load Forecasting Enhancement Act - H.R. 6633: The High-Capacity Grid Act - H.R. 6529: Protecting Families from AI Data Center Energy Costs Act - H.R. 9332: Load Forecasting Enhancement Act - H.R, 9339: Affordable Innovation for the Grid Act - H.R. 9335: Advanced Transmission Technology to Reduce Rates Act - Hr. 9340: Ratepayer Protection Act
Client expense: $980,000 · Firm income: Not reported
Government targets: HOUSE OF REPRESENTATIVES, SENATE
2026 · second_quarter · Utilities
H. Res. Pending: Expressing support for the designation of July 10th as Journeyman Lineworkers Recognition Day.; all provisions H.R. 471: Fix Our Forests Act; all provisions H.R. 1355: Weatherization Enhancement and Readiness Act of 2025; all provisions H.R. 2072: To require the Federal Energy Regulatory Commission to extend the time period during which licensees are required to commence construction of certain hydropower projects; all provisions H.R. 3657: Hydropower Licensing Transparency Act; all provisions H.R. 3699: Energy Choice Act; all provisions H.R. 4626: Home Appliance Protection and Affordability Act; all provisions H.R. 4690: Reliable Federal infrastructure Act; all provisions H.R. 4776: Standardizing Permitting and Expediting Economic Development (SPEED) Act; all provisions H.R. 5079: Widespread Information Management for the Welfare of Infrastructure and Government Act; provisions related to critical infrastructure security/cybersecurity H.R. 5301: Promoting Innovation in Pipeline Efficiency and Safety (PIPES) Act of 2025; provisions related to pipeline safety H.R. 6176: Electricity Transmission Scorecard Act; all provisions H.R. 6177: Grid Research and Development Act; all provisions H.R. 6529: Protecting Families from AI Data Center Energy Costs Act; all provisions H.R. 6633: High-Capacity Grid Act; all provisions H.R. 7257: Securing Community Upgrades for a Resilient (SECURE) Grid Act; all provisions H.R. 8495: Financial Services and General Government Appropriations Act, 2027; provisions related to spectrum H.R. 8800: National Defense Authorization Act for Fiscal Year 2027; provisions related to cybersecurity H.R. 8889: National Dam and Hydropower Safety Improvements Act of 2026; all provisions H.R. 9022: Energy and Water Development and Related Agencies Appropriations Act, 2027; provisions related to the Department of Energy and energy efficiency programs H.R. 9171: Department of the Interior, Environment, and Related Agencies Appropriations Act, 2027; provisions related to Tribal Health Programs H.R. 9260: Departments of Labor, Health and Human Services, and Education, and Related Agencies Appropriations Act, 2027; provisions related to the Low Income Home Energy Assistance Program funding H.R. 9332: Load Forecasting Enhancement Act; all provisions H.R. 9335: Advanced Transmission Technology to Reduce Rates Act; all provisions H.R. 9337: Hydropower Licensing Affordability Act; all provisions H.R. 9338: Pipeline Safety Authorization Act of 2026; all provisions H.R. 9339: Affordable Innovation for the Grid Act; all provisions H.R. 9340: Ratepayer Protection Act; all provisions S. Res. 794: Expressing support for the designation of July 10th as Journeyman Lineworkers Recognition Day.; all provisions S. 1020: Build More Hydro Act; all provisions S. 1183: Maintaining and Enhancing Hydroelectricity and River Restoration Act; all provisions S. 1337: Cybersecurity Information Sharing Extension Act; all provisions S. 2975: PIPELINE Safety Act of 2025; all provisions S. 3500: Hydropower Licensing Transparency Act; all provisions S. 3518: FLOWS Act; all provisions S. 3852: GRID Act; all provisions S. 3926: E-Access Act; all provisions General discussions related to the Clean Air Act-Section 111(d) and EPA 111(d) rules related to Greenhouse Gas Standards and Guidelines for Fossil Fuel-Fired Power Plants General discussions related to the Clean Air Act - Section 202(a) and EPA Reconsideration of 2009 Endangerment Finding and GHG Vehicle Standards Public Law 119-74 (H.R. 6938): The Commerce, Justice, Science; Energy and Water Development; And Interior and Environment Appropriations Act, 2026; provisions related to Dept. of Energy, energy efficiency programs and Dept. of Interior tribal health programs Public Law 119-75 (H.R. 7148): The Consolidated Appropriations Act; provisions related to Low Income Home Energy Assistance Program funding FCC WT Docket No. 22-323; provisions related to 5 GHz Band Spectrum FCC WT Docket No. 24-99; provisions related to 900 MHz Band Spectrum FCC WT Docket No. 24-240; provisions related to 00 MHz Band Spectrum General discussions related to resilience tax credits and grant proposals General discussions related to Counter-Uncrewed Aircraft Systems (cUAS) authority General discussions related to Uncrewed Aircraft Systems (UAS) General discussions related to wildfire safety, emergency coordination, grid modernization, liability, and permitting issues General discussions related to nuclear issues and relicensing of Diablo Canyon Power Plant General discussions related to electromagnetic spectrum assignment, licensing, and usage General discussions related to cybersecurity and grid security General discussions related to hydrogen production and use General discussions related to California utility rate and energy procurement issues General discussions related to electric vehicles and charging infrastructure General discussion related to the National Environmental Policy Act of 1969 (NEPA) and transmission reform General discussion related to Department of Energy funding programs General discussion related to renewable natural gas production and use General discussion related to hydropower issues and relicensing of hydropower assets General discussion related to offshore wind issues General discussion related to AI/datacenter siting and electricity demand General discussions related to grid security issues for critical infrastructure General discussion related to Energy Storage Safety Research & Development General discussion related to Geothermal energy development General discussion related to Energy and Electricity Affordability; Clean Energy and Energy Efficiency Tax Credits General discussion related to Grid planning and FERC proceedings General discussion related to natural gas issues General discussion related to power transformer supply chain issues
Client expense: $3,530,000 · Firm income: Not reported
Government targets: Agriculture, Dept of (USDA), Energy, Dept of, Federal Communications Commission (FCC), Federal Energy Regulatory Commission (FERC), HOUSE OF REPRESENTATIVES, Interior, Dept of (DOI), Natl Telecommunications & Information Administration (NTIA), Office of Science & Technology Policy (OSTP), SENATE, White House Office
2026 · second_quarter · Energy/Nuclear
H. Res. Pending: Expressing support for the designation of July 10th as Journeyman Lineworkers Recognition Day.; all provisions H.R. 471: Fix Our Forests Act; all provisions H.R. 1355: Weatherization Enhancement and Readiness Act of 2025; all provisions H.R. 2072: To require the Federal Energy Regulatory Commission to extend the time period during which licensees are required to commence construction of certain hydropower projects; all provisions H.R. 2709: Save Our Sequoias Act; all provisions H.R. 3657: Hydropower Licensing Transparency Act; all provisions H.R. 3699: Energy Choice Act; all provisions H.R. 4626: Home Appliance Protection and Affordability Act; all provisions H.R. 4690: Reliable Federal infrastructure Act; all provisions H.R. 4776: Standardizing Permitting and Expediting Economic Development (SPEED) Act; all provisions H.R. 5079: Widespread Information Management for the Welfare of Infrastructure and Government Act; provisions related to critical infrastructure security/cybersecurity H.R. 6176: Electricity Transmission Scorecard Act; all provisions H.R. 6177: Grid Research and Development Act; all provisions H.R. 6473: The Facilitating Increased Resilience, Environmental Weatherization And Lowered Liability (FIREWALL) Act; all provisions H.R. 6529: Protecting Families from AI Data Center Energy Costs Act; all provisions H.R. 6633: High-Capacity Grid Act; all provisions H.R. 7257: Securing Community Upgrades for a Resilient (SECURE) Grid Act; all provisions H.R. 8495: Financial Services and General Government Appropriations Act, 2027; provisions related to spectrum H.R. 8800: National Defense Authorization Act for Fiscal Year 2027; provisions related to cybersecurity H.R. 8870: BUILD America 250 Act; provisions related to electric vehicles and charging infrastructure H.R. 8889: National Dam and Hydropower Safety Improvements Act of 2026; all provisions H.R. 9022: Energy and Water Development and Related Agencies Appropriations Act, 2027; provisions related to the Department of Energy and energy efficiency programs H.R. 9171: Department of the Interior, Environment, and Related Agencies Appropriations Act, 2027; provisions related to Tribal Health Programs H.R. 9260: Departments of Labor, Health and Human Services, and Education, and Related Agencies Appropriations Act, 2027; provisions related to the Low Income Home Energy Assistance Program funding H.R. 9332: Load Forecasting Enhancement Act; all provisions H.R. 9335: Advanced Transmission Technology to Reduce Rates Act; all provisions H.R. 9337: Hydropower Licensing Affordability Act; all provisions H.R. 9339: Affordable Innovation for the Grid Act; all provisions H.R. 9340: Ratepayer Protection Act; all provisions S. Res. 794: Expressing support for the designation of July 10th as Journeyman Lineworkers Recognition Day.; all provisions S. 1020: Build More Hydro Act; all provisions S. 1183: Maintaining and Enhancing Hydroelectricity and River Restoration Act; all provisions S. 1337: Cybersecurity Information Sharing Extension Act; all provisions S. 3500: Hydropower Licensing Transparency Act; all provisions S. 3518: FLOWS Act; all provisions S. 3852: GRID Act; all provisions S. 3926: E-Access Act; all provisions General discussions related to the Clean Air Act-Section 111(d) and EPA 111(d) rules related to Greenhouse Gas Standards and Guidelines for Fossil Fuel-Fired Power Plants General discussions related to the Clean Air Act - Section 202(a) and EPA Reconsideration of 2009 Endangerment Finding and GHG Vehicle Standards Public Law 119-21 (H.R. 1): One Big Beautiful Bill Act; provisions related to tax Public Law 119-74 (H.R. 6938): The Commerce, Justice, Science; Energy and Water Development; And Interior and Environment Appropriations Act, 2026; provisions related to Dept. of Energy, energy efficiency programs and Dept. of Interior tribal health programs Public Law 119-75 (H.R. 7148): The Consolidated Appropriations Act; provisions related to Low Income Home Energy Assistance Program funding Public Law 117-58: Infrastructure Investment and Jobs Act; all provisions related to electric vehicles, grid resilience, clean energy, energy efficiency and wildfires Public Law 117-169: Inflation Reduction Act of 2022; all provisions Public Law 115-97: Tax Cuts and Jobs Act; provisions related to interest deductibility, capital gains, dividends, and corporate tax rate Public Law 115-141: Consolidated Appropriations Act, 2018; provisions related to Section 512 of the Federal Land Policy and Management Act FCC WT Docket No. 22-323; provisions related to 5 GHz Band Spectrum FCC WT Docket No. 24-99; provisions related to 900 MHz Band Spectrum FCC WT Docket No. 24-240; provisions related to 00 MHz Band Spectrum General discussions related to disaster funding General discussions related to grid security issues for critical infrastructure General discussions related to resilience tax credits and grant proposals General discussions related to wildfire safety, emergency coordination, grid modernization, liability, and permitting issues General discussions related to Counter-Uncrewed Aircraft Systems (cUAS) authority General discussions related to Uncrewed Aircraft Systems (UAS) General discussions related to cybersecurity and grid security General discussions related to nuclear issues and relicensing of Diablo Canyon Power Plant General discussions related to electromagnetic spectrum assignment, licensing, and usage General discussions related to hydrogen production and use General discussions related to California utility rate and energy procurement issues General discussions related to electric vehicles and charging infrastructure General discussion related to the National Environmental Policy Act of 1969 (NEPA) and transmission reform General discussion related to Department of Energy funding programs General discussion related to renewable natural gas production and use General discussion related to hydropower issues and relicensing of hydropower assets General discussion related to offshore wind issues General discussion related to AI/datacenter siting and electricity demand General discussion related to Energy Storage Safety Research & Development General discussion related to Geothermal energy development General discussion related to Energy and Electricity Affordability; Clean Energy and Energy Efficiency Tax Credits General discussion related to Grid planning and FERC proceedings General discussion related to natural gas issues General discussion related to power transformer supply chain issues
Client expense: $3,530,000 · Firm income: Not reported
Government targets: Agriculture, Dept of (USDA), Energy, Dept of, Executive Office of the President (EOP), Federal Communications Commission (FCC), Federal Energy Regulatory Commission (FERC), HOUSE OF REPRESENTATIVES, Interior, Dept of (DOI), Natl Telecommunications & Information Administration (NTIA), Office of Science & Technology Policy (OSTP), SENATE, Treasury, Dept of, White House Office
2026 · second_quarter · Energy/Nuclear
H.R. 471, Fix Our Forests Act; H.R. 753, FIRE Act; H.R. 1047, Grid Power Act; H.R. 1355, The Weatherization Enhancement and Readiness Act; H.R.2444 - To establish the Supply Chain Resiliency and Crisis Response Office in the Department of Commerce, and for other purposes; H.R. 2703, Advancing GETs Act; H.R. 3015, National Coal Council Reestablishment Act; H.R. 3062, Promoting Cross-Border Energy Infrastructure Act; H.R. 3157, State Energy Accountability Act; H.R. 3616, Reliable Power Act; H.R. 3617, Securing Americas Critical Minerals Supply Act; H.R. 3626 - To facilitate the development of a whole-of-government strategy for nuclear cooperation and nuclear exports, and for other purposes. HR. 3628, State Planning for Reliability and Affordability Act; H.R. 3632, Power Plant Reliability Act; H.R. 3638, Electric Supply Chain Act; H.R. 3657, Hydropower Relicensing Transparency Act; H.R. 3668, Improving Interagency Coordination for Pipeline Reviews Act; H.R. 3699, Energy Choice Act; H.R. 3843, the Baseload Reliability Protection Act; H.R. 3898, PERMIT Act; H.R. 4136 - To establish an Office of Public Engagement and Participation within the Nuclear Regulatory Commission, and for other purposes; H.R. 4503, ePermit Act; H.R. 5600, SPEED and Reliability Act; H.R. 6336, Fair Allocation of Interstate Rates (FAIR) Act; H.R. 6633 High-Capacity Grid Act; H.R. 6983 PRICE Act; H.R. 7729 SURGE Act; H.R. 7977, Energy Bills Relief Act of 2026; H.R. 8248, Grid Expansion and Reliability Act; H.R. 8400, DATA Act; H.R. 8568, Lowering Utility Bills Act; H.R. 9332, Load Forecasting Enhancement Act; H.R. 9335, Advanced Transmission Technology to Reduce Rates Act; H.R. 9339, Affordable Innovation for the Grid Act; H.R. 9340, Ratepayer Protection Act; H.R. 7258, Energy Emergency Leadership Act H. Res. 290; Recognizing Threat of Retirement of Nonintermittent Electric Generation Facilities; S. 465 GRID Power Act; S. 914, Energy Threat Analysis Establishment Act; S. 1327 Advancing GETs Act of 2025; S. 1462, Fix Our Forests Act; S.1757 - To amend the Atomic Energy Act of 1954 to provide for more efficient hearings on nuclear facility construction applications, and for other purposes; S. 1801 -- To facilitate the development of a whole-of-government strategy for nuclear cooperation and nuclear exports, and for other purposes; S. 1945, Energy Choice Act; S. 2082, the Nuclear Refuel Act; S. 3034 Reliable Power Act; S. 3192, REDUCE Act; S. 3585 DATA Act; S. 3682 Power for the People Act of 2026; S. 3814, the Advancing Reliable Capacity (ARC) Act; S. 3852 GRID Act; S. 3947 REWIRE Act; Artificial intelligence issues generally; Data Center issues generally; Draft Advancing Reliable Capacity (ARC) Act; Draft legislation on permitting certainty; Draft Permitting Reform Legislation; Draft transmission legislation; Electric grid/energy infrastructure cybersecurity; Energy Emergency Leadership Act; Load growth, reliability, and resource adequacy generally; Energy security issues generally; Issues related to energy grid supply chain; Issues related to energy sector impacts from tariff policies; Distribution transformers supply chain; Energy efficiency generally, DOE grant awards and implementation, Draft legislation on permitting certainty; NextNav 900 MHz FCC Petition.
Client expense: $370,000 · Firm income: Not reported
Government targets: Energy, Dept of, Federal Energy Regulatory Commission (FERC), HOUSE OF REPRESENTATIVES, SENATE, White House Office
2026 · second_quarter · Energy/Nuclear
Issues related to clean energy project development (including siting, permitting, interconnection or contracting), electricity market design, transmission, energy storage, demand response, load growth, or micro grid projects. Legislation and regulatory policies impacting existing fossil and nuclear power plants. Sections of the following bills related to these topics: Draft legislation on permitting and transmission reform. H.R.6633: High-Capacity Grid Act; S.3814: ARC Act of 2026; H.R.5631, the Geothermal Energy Advancement Act; H.R.2072/S.1020: A bill on hydro relicensing; S.4116/H.R.8437: Geo POWER Act; Nuclear REFUEL Act; H.R.7977: Energy Bill Relief Act; H.R.4128: CIRCUIT Act; H.R.4776 SPEED Act; S.3947: REWIRE Act; H.R.8308: the CERTAIN Act; S.4795: FREEDOM Act; H.R.1687: the CLEAN Act; H.R.301: GEO Act; S.456/H.R.1077 STEAM Act. Draft legislation on Data Center Interconnection. White House implementation of the Ratepayer Protection Pledge. Permitting issues related to the National Historic Preservation Act, the National Environmental Protection Act, the Endangered Species Act, the Clean Water Act, Federal Power Act, PURPA, and the Geothermal Steam Act of 1970. Potential legislation to reauthorize the Grid Resilience and Innovation Partnerships program.
Client expense: $190,000 · Firm income: Not reported
Government targets: Energy, Dept of, HOUSE OF REPRESENTATIVES, Interior, Dept of (DOI), SENATE, White House Office
2026 · second_quarter · Energy/Nuclear
H.R. 3616, Reliable Power Act; H.R. 1047, Grid Power Act; H.R. 3632, Power Plant Reliability Act; H.R. 3638, Electric Supply Chain Act; H.R. 3157, State Energy Accountability Act; HR. 3628, State Planning for Reliability and Affordability Act; H.R. 3657, Hydropower Relicensing Transparency Act; H.R. 3015, National Coal Council Reestablishment Act; H.R. 3617, Securing Americas Critical Minerals Supply Act; H.R. 3062, Promoting Cross-Border Energy Infrastructure Act; H.R. 5600, SPEED and Reliability Act; H.R. 1355, Weatherization Enhancement and Readiness Act; H.R. 4503, ePermit Act; H.R. 3843, Baseload Reliability Protection Act; H.R. 6336, FAIR Act; H.R. 6633, High-Capacity Grid Act; H.R. 6983, PRICE Act; H.R. 7977, Energy Bills Relief Act of 2026; H.R. 8248, Grid Expansion and Reliability Act; H.R. 8568, Lowering Utility Bills Act; H.R. 7729, SURGE Act; H.R. 9332, Load Forecasting Enhancement Act; H.R. 9339, Affordable Innovation for the Grid Act; H.R. 9335, Advanced Transmission Technology to Reduce Rates Act; H.R. 9340, Ratepayer Protection Act; H.R. 7258, Energy Emergency Leadership Act S. 1327, Advancing GETs Act of 2025; S. 3034, Reliable Power Act; S. 3192, REDUCE Act; S. 3585/H.R. 8400, DATA Act; S. 3682, Power for the People Act of 2026; S. 3852, GRID Act; S. 3947, REWIRE Act; S. 465, GRID Power Act; S. 4559, Energy Cost Fairness and Reliability Act; Draft legislation on transmission; Draft legislation on permitting reform; Draft legislation on permitting certainty; Draft legislation on microgrids; Draft legislation on account arrears; Draft legislation on state PUC support Artificial intelligence issues generally; Load growth, reliability, and resource adequacy generally; Data center issues generally; Energy security issues generally; Energy Efficiency generally; Issues related to energy grid supply chain; Issues related to energy sector impacts from tariff policies; Draft legislation related to cybersecurity; Draft legislation related to security and data; Distribution transformers; Draft legislation related to electric grid/energy infrastructure cybersecurity;
Client expense: Not reported · Firm income: $50,000
Government targets: HOUSE OF REPRESENTATIVES, SENATE
2026 · second_quarter · Energy/Nuclear
Transmission development and deployment Sustainability efforts Energy Permitting Reform H.R. XX, Ratepayer Protection Act H.R. 2703/ S. 1327, Advancing GETS Act H.R. 1077 / S. 456, STEAM Act H.R. 301, GEO Act H.R. 3838, SPEED Act H.R. 6633, High Capacity Grid Act H.R. 2122, IMPACT Act H.R. 6984, Data Center Transparency Act H.R. 6983, Preventing Rate Inflation in Consumer Energy Act
Client expense: $3,570,000 · Firm income: Not reported
Government targets: HOUSE OF REPRESENTATIVES, SENATE
2026 · second_quarter · Energy/Nuclear
HR 161 New Source Review Permitting Improvement Act; HR 4305 DUMP Red Tape Act; HR 6336 Fair Allocation of Interstate Rates Act; HR 6529 Protecting Families from AI Data Center Energy Costs Act; HR 6633 High-Capacity Grid Act; HR 7831 License to Drill Act; HR 8330 Stop Climate Shakedowns Act of 2026; HR 8870 BUILD America 250 Act; HR 9332 Load Forecasting Enhancement Act; HR 9335 Advanced Transmission Technology to Reduce Rates Act; HR 9338 Pipeline Safety Authorization Act of 2026; HR 9339 Affordable Innovation for the Grid Act; HR 9340 Ratepayer Protection Act; S 4340 Stop Climate Shakedowns Act of 2026; S 4475 Unlock American Energy and Jobs Act of 2026; S 4944 A bill to streamline permitting under the Natural Gas Act, the Federal Water Pollution Control Act, and the National Environmental Policy Act of 1969, and for other purposes; draft legislation on permitting reform; draft legislation on reforming the Endangered Species Act; 91 Fed. Reg. 1985 Subpart KKKKa-Standards of Performance for Stationary Combustion Turbines; efforts related to engagement with European Union on Corporate Sustainability Due Diligence Directive (CSDDD)
Client expense: $2,780,000 · Firm income: Not reported
Government targets: Commerce, Dept of (DOC), Council on Environmental Quality (CEQ), Environmental Protection Agency (EPA), HOUSE OF REPRESENTATIVES, SENATE, White House Office
2026 · second_quarter · Energy/Nuclear
Energy policy and infrastructure issues affecting the electrical manufacturing industry, including Energy Policy and Conservation Act (EPCA) reform; critical minerals programs; domestic and international energy-related supply chains; transformer production and supply chain resilience; DOE energy efficiency programs, including building efficiency initiatives and the LIT Act; permitting reform; improvements to federal contracting related to energy efficiency programs; and broader national energy strategy. Advocacy also included legislation related to grid modernization, transmission capacity, consumer appliance standards, and energy infrastructure, including the SECURE Grid Act (H.R. 7257), High-Capacity Grid Act (H.R. 6633), including Section 2 relating to best-available transmission conductor standards, the Don't Mess with My Home Appliances Act (H.R. 4626), the SPEED Act (H.R. 4774), and the REWIRE Act (S. 3947), including Section 2 (Definitions).
Client expense: $650,000 · Firm income: Not reported
Government targets: Energy, Dept of, HOUSE OF REPRESENTATIVES, SENATE, Treasury, Dept of, White House Office