An act to provide for reconciliation pursuant to title II of H. Con. Res. 14.
2026 · third_quarter · Client: AMERICAN ELECTRIC POWER COMPANY, INC. AND AFFILIATED CORPORATIONS
Issues related to H.R.1 - The One Big Beautiful Bill Act; H.R. 8482, Nuclear Rate Stabilization Act; Section 45U nuclear power production credit implementation; Section 48E & 45Y new nuclear guidance; Treasury prohibited foreign entity clarity; Nuclear tax issues generally; Distribution transformer issues generally; Transmission and distribution issues generally; Resiliency issues generally; Distribution transformer issues generally; Transmission and distribution issues generally
Client expense: $370,000 · Firm income: —
Matched citations: H.R.1
GRID Power Act
2026 · third_quarter · Client: AMERICAN ELECTRIC POWER COMPANY, INC. AND AFFILIATED CORPORATIONS
H.R. 3616, Reliable Power Act; H.R. 1047, Grid Power Act; H.R. 3632, Power Plant Reliability Act; H.R. 3638, Electric Supply Chain Act; H.R. 3657, Hydropower Relicensing Transparency Act; H.R. 3015, National Coal Council Reestablishment Act; H.R. 3062, Promoting Cross-Border Energy Infrastructure Act; H.R. 5600, SPEED and Reliability Act; H.R. 1355, Weatherization Enhancement and Readiness Act; H.R. 4503, ePermit Act; H.R. 3843, Baseload Reliability Protection Act; H.R. 6336, FAIR Act; H.R. 6633, High-Capacity Grid Act; H.R. 7977, Energy Bills Relief Act of 2026; H.R. 9332, Load Forecasting Enhancement Act; H.R. 9339, Affordable Innovation for the Grid Act; H.R. 9335, Advanced Transmission Technology to Reduce Rates Act; H.R. 9340, Ratepayer Protection Act; H.R. 5549/S. 1757, Efficient Nuclear Licensing Hearings Act; S. 1327, Advancing GETs Act of 2025; S. 3034, Reliable Power Act; S. 3585/H.R. 8400, DATA Act; S. 3852, GRID Act; S. 3947, REWIRE Act; S. 465, GRID Power Act; S. 4559, Energy Cost Fairness and Reliability Act; Draft legislation on transmission; Draft legislation on permitting reform; Draft legislation on permitting certainty; Artificial intelligence issues generally; Load growth, reliability, and resource adequacy generally; Data center issues generally; Energy security issues generally; Energy efficiency generally; Issues related to energy grid supply chain; Issues related to energy sector impacts from tariff policies; Draft legislation related to cybersecurity; Draft legislation related to security and data; Distribution transformers; Draft legislation related to electric grid/energy infrastructure cybersecurity; Draft legislation on microgrids; Advanced Reactor Demonstration Program generally; Advanced nuclear reactor siting issues generally; Coal power plant modernization support; Issues related to new nuclear reactor completion guarantees, including S. 3814, the Accelerating Reliable Capacity (ARC) Act; Issues related to NRC meteorological tower requirement reforms; Issues related to regional transmission organizations; Issues and draft legislation related to transmission permitting and planning; Issues related to DOE Energy Dominance Financing program; DOE SPARK grant applications
Client expense: $370,000 · Firm income: —
Matched citations: H.R. 1047
Weatherization Enhancement and Readiness Act of 2025
2026 · third_quarter · Client: AMERICAN ELECTRIC POWER COMPANY, INC. AND AFFILIATED CORPORATIONS
H.R. 3616, Reliable Power Act; H.R. 1047, Grid Power Act; H.R. 3632, Power Plant Reliability Act; H.R. 3638, Electric Supply Chain Act; H.R. 3657, Hydropower Relicensing Transparency Act; H.R. 3015, National Coal Council Reestablishment Act; H.R. 3062, Promoting Cross-Border Energy Infrastructure Act; H.R. 5600, SPEED and Reliability Act; H.R. 1355, Weatherization Enhancement and Readiness Act; H.R. 4503, ePermit Act; H.R. 3843, Baseload Reliability Protection Act; H.R. 6336, FAIR Act; H.R. 6633, High-Capacity Grid Act; H.R. 7977, Energy Bills Relief Act of 2026; H.R. 9332, Load Forecasting Enhancement Act; H.R. 9339, Affordable Innovation for the Grid Act; H.R. 9335, Advanced Transmission Technology to Reduce Rates Act; H.R. 9340, Ratepayer Protection Act; H.R. 5549/S. 1757, Efficient Nuclear Licensing Hearings Act; S. 1327, Advancing GETs Act of 2025; S. 3034, Reliable Power Act; S. 3585/H.R. 8400, DATA Act; S. 3852, GRID Act; S. 3947, REWIRE Act; S. 465, GRID Power Act; S. 4559, Energy Cost Fairness and Reliability Act; Draft legislation on transmission; Draft legislation on permitting reform; Draft legislation on permitting certainty; Artificial intelligence issues generally; Load growth, reliability, and resource adequacy generally; Data center issues generally; Energy security issues generally; Energy efficiency generally; Issues related to energy grid supply chain; Issues related to energy sector impacts from tariff policies; Draft legislation related to cybersecurity; Draft legislation related to security and data; Distribution transformers; Draft legislation related to electric grid/energy infrastructure cybersecurity; Draft legislation on microgrids; Advanced Reactor Demonstration Program generally; Advanced nuclear reactor siting issues generally; Coal power plant modernization support; Issues related to new nuclear reactor completion guarantees, including S. 3814, the Accelerating Reliable Capacity (ARC) Act; Issues related to NRC meteorological tower requirement reforms; Issues related to regional transmission organizations; Issues and draft legislation related to transmission permitting and planning; Issues related to DOE Energy Dominance Financing program; DOE SPARK grant applications
Client expense: $370,000 · Firm income: —
Matched citations: H.R. 1355
New Source Review Permitting Improvement Act
2026 · third_quarter · Client: AMERICAN ELECTRIC POWER COMPANY, INC. AND AFFILIATED CORPORATIONS
H.R. 471/S. 1462, the Fix Our Forest Act; H.R. 4776, SPEED Act; H.R. 161, New Source Review Permitting Improvement Act; H.R. 753, FIRE Act; H.R. 573, Studying NEPAs Impact on Projects Act; Conservation regulations at the Bureau of Land Management; Wildfires and other natural disasters; EPA regulations on Clean Air Act Section 111d; EPA regulations generally; Good Neighbor Rule; Coal Combustion Residuals; Effluent Limitation Guidelines; Draft legislation on the Clean Air Act; Rights-of-way; Categorical exclusions; Siting and permitting generally; National Environmental Policy Act; Clean Water Act generally; Endangered Species Act generally; Power demand generally; National Historic Preservation Act generally; Water Resources Development Act generally; Clean Air Act generally; PFAS and Comprehensive Environmental Response, Compensation, and Liability Act
Client expense: $370,000 · Firm income: —
Matched citations: H.R. 161
National Coal Council Reestablishment Act
2026 · third_quarter · Client: AMERICAN ELECTRIC POWER COMPANY, INC. AND AFFILIATED CORPORATIONS
H.R. 3616, Reliable Power Act; H.R. 1047, Grid Power Act; H.R. 3632, Power Plant Reliability Act; H.R. 3638, Electric Supply Chain Act; H.R. 3657, Hydropower Relicensing Transparency Act; H.R. 3015, National Coal Council Reestablishment Act; H.R. 3062, Promoting Cross-Border Energy Infrastructure Act; H.R. 5600, SPEED and Reliability Act; H.R. 1355, Weatherization Enhancement and Readiness Act; H.R. 4503, ePermit Act; H.R. 3843, Baseload Reliability Protection Act; H.R. 6336, FAIR Act; H.R. 6633, High-Capacity Grid Act; H.R. 7977, Energy Bills Relief Act of 2026; H.R. 9332, Load Forecasting Enhancement Act; H.R. 9339, Affordable Innovation for the Grid Act; H.R. 9335, Advanced Transmission Technology to Reduce Rates Act; H.R. 9340, Ratepayer Protection Act; H.R. 5549/S. 1757, Efficient Nuclear Licensing Hearings Act; S. 1327, Advancing GETs Act of 2025; S. 3034, Reliable Power Act; S. 3585/H.R. 8400, DATA Act; S. 3852, GRID Act; S. 3947, REWIRE Act; S. 465, GRID Power Act; S. 4559, Energy Cost Fairness and Reliability Act; Draft legislation on transmission; Draft legislation on permitting reform; Draft legislation on permitting certainty; Artificial intelligence issues generally; Load growth, reliability, and resource adequacy generally; Data center issues generally; Energy security issues generally; Energy efficiency generally; Issues related to energy grid supply chain; Issues related to energy sector impacts from tariff policies; Draft legislation related to cybersecurity; Draft legislation related to security and data; Distribution transformers; Draft legislation related to electric grid/energy infrastructure cybersecurity; Draft legislation on microgrids; Advanced Reactor Demonstration Program generally; Advanced nuclear reactor siting issues generally; Coal power plant modernization support; Issues related to new nuclear reactor completion guarantees, including S. 3814, the Accelerating Reliable Capacity (ARC) Act; Issues related to NRC meteorological tower requirement reforms; Issues related to regional transmission organizations; Issues and draft legislation related to transmission permitting and planning; Issues related to DOE Energy Dominance Financing program; DOE SPARK grant applications
Client expense: $370,000 · Firm income: —
Matched citations: H.R. 3015
Promoting Cross-border Energy Infrastructure Act
2026 · third_quarter · Client: AMERICAN ELECTRIC POWER COMPANY, INC. AND AFFILIATED CORPORATIONS
H.R. 3616, Reliable Power Act; H.R. 1047, Grid Power Act; H.R. 3632, Power Plant Reliability Act; H.R. 3638, Electric Supply Chain Act; H.R. 3657, Hydropower Relicensing Transparency Act; H.R. 3015, National Coal Council Reestablishment Act; H.R. 3062, Promoting Cross-Border Energy Infrastructure Act; H.R. 5600, SPEED and Reliability Act; H.R. 1355, Weatherization Enhancement and Readiness Act; H.R. 4503, ePermit Act; H.R. 3843, Baseload Reliability Protection Act; H.R. 6336, FAIR Act; H.R. 6633, High-Capacity Grid Act; H.R. 7977, Energy Bills Relief Act of 2026; H.R. 9332, Load Forecasting Enhancement Act; H.R. 9339, Affordable Innovation for the Grid Act; H.R. 9335, Advanced Transmission Technology to Reduce Rates Act; H.R. 9340, Ratepayer Protection Act; H.R. 5549/S. 1757, Efficient Nuclear Licensing Hearings Act; S. 1327, Advancing GETs Act of 2025; S. 3034, Reliable Power Act; S. 3585/H.R. 8400, DATA Act; S. 3852, GRID Act; S. 3947, REWIRE Act; S. 465, GRID Power Act; S. 4559, Energy Cost Fairness and Reliability Act; Draft legislation on transmission; Draft legislation on permitting reform; Draft legislation on permitting certainty; Artificial intelligence issues generally; Load growth, reliability, and resource adequacy generally; Data center issues generally; Energy security issues generally; Energy efficiency generally; Issues related to energy grid supply chain; Issues related to energy sector impacts from tariff policies; Draft legislation related to cybersecurity; Draft legislation related to security and data; Distribution transformers; Draft legislation related to electric grid/energy infrastructure cybersecurity; Draft legislation on microgrids; Advanced Reactor Demonstration Program generally; Advanced nuclear reactor siting issues generally; Coal power plant modernization support; Issues related to new nuclear reactor completion guarantees, including S. 3814, the Accelerating Reliable Capacity (ARC) Act; Issues related to NRC meteorological tower requirement reforms; Issues related to regional transmission organizations; Issues and draft legislation related to transmission permitting and planning; Issues related to DOE Energy Dominance Financing program; DOE SPARK grant applications
Client expense: $370,000 · Firm income: —
Matched citations: H.R. 3062
Reliable Power Act
2026 · third_quarter · Client: AMERICAN ELECTRIC POWER COMPANY, INC. AND AFFILIATED CORPORATIONS
H.R. 3616, Reliable Power Act; H.R. 1047, Grid Power Act; H.R. 3632, Power Plant Reliability Act; H.R. 3638, Electric Supply Chain Act; H.R. 3657, Hydropower Relicensing Transparency Act; H.R. 3015, National Coal Council Reestablishment Act; H.R. 3062, Promoting Cross-Border Energy Infrastructure Act; H.R. 5600, SPEED and Reliability Act; H.R. 1355, Weatherization Enhancement and Readiness Act; H.R. 4503, ePermit Act; H.R. 3843, Baseload Reliability Protection Act; H.R. 6336, FAIR Act; H.R. 6633, High-Capacity Grid Act; H.R. 7977, Energy Bills Relief Act of 2026; H.R. 9332, Load Forecasting Enhancement Act; H.R. 9339, Affordable Innovation for the Grid Act; H.R. 9335, Advanced Transmission Technology to Reduce Rates Act; H.R. 9340, Ratepayer Protection Act; H.R. 5549/S. 1757, Efficient Nuclear Licensing Hearings Act; S. 1327, Advancing GETs Act of 2025; S. 3034, Reliable Power Act; S. 3585/H.R. 8400, DATA Act; S. 3852, GRID Act; S. 3947, REWIRE Act; S. 465, GRID Power Act; S. 4559, Energy Cost Fairness and Reliability Act; Draft legislation on transmission; Draft legislation on permitting reform; Draft legislation on permitting certainty; Artificial intelligence issues generally; Load growth, reliability, and resource adequacy generally; Data center issues generally; Energy security issues generally; Energy efficiency generally; Issues related to energy grid supply chain; Issues related to energy sector impacts from tariff policies; Draft legislation related to cybersecurity; Draft legislation related to security and data; Distribution transformers; Draft legislation related to electric grid/energy infrastructure cybersecurity; Draft legislation on microgrids; Advanced Reactor Demonstration Program generally; Advanced nuclear reactor siting issues generally; Coal power plant modernization support; Issues related to new nuclear reactor completion guarantees, including S. 3814, the Accelerating Reliable Capacity (ARC) Act; Issues related to NRC meteorological tower requirement reforms; Issues related to regional transmission organizations; Issues and draft legislation related to transmission permitting and planning; Issues related to DOE Energy Dominance Financing program; DOE SPARK grant applications
Client expense: $370,000 · Firm income: —
Matched citations: H.R. 3616
Power Plant Reliability Act of 2025
2026 · third_quarter · Client: AMERICAN ELECTRIC POWER COMPANY, INC. AND AFFILIATED CORPORATIONS
H.R. 3616, Reliable Power Act; H.R. 1047, Grid Power Act; H.R. 3632, Power Plant Reliability Act; H.R. 3638, Electric Supply Chain Act; H.R. 3657, Hydropower Relicensing Transparency Act; H.R. 3015, National Coal Council Reestablishment Act; H.R. 3062, Promoting Cross-Border Energy Infrastructure Act; H.R. 5600, SPEED and Reliability Act; H.R. 1355, Weatherization Enhancement and Readiness Act; H.R. 4503, ePermit Act; H.R. 3843, Baseload Reliability Protection Act; H.R. 6336, FAIR Act; H.R. 6633, High-Capacity Grid Act; H.R. 7977, Energy Bills Relief Act of 2026; H.R. 9332, Load Forecasting Enhancement Act; H.R. 9339, Affordable Innovation for the Grid Act; H.R. 9335, Advanced Transmission Technology to Reduce Rates Act; H.R. 9340, Ratepayer Protection Act; H.R. 5549/S. 1757, Efficient Nuclear Licensing Hearings Act; S. 1327, Advancing GETs Act of 2025; S. 3034, Reliable Power Act; S. 3585/H.R. 8400, DATA Act; S. 3852, GRID Act; S. 3947, REWIRE Act; S. 465, GRID Power Act; S. 4559, Energy Cost Fairness and Reliability Act; Draft legislation on transmission; Draft legislation on permitting reform; Draft legislation on permitting certainty; Artificial intelligence issues generally; Load growth, reliability, and resource adequacy generally; Data center issues generally; Energy security issues generally; Energy efficiency generally; Issues related to energy grid supply chain; Issues related to energy sector impacts from tariff policies; Draft legislation related to cybersecurity; Draft legislation related to security and data; Distribution transformers; Draft legislation related to electric grid/energy infrastructure cybersecurity; Draft legislation on microgrids; Advanced Reactor Demonstration Program generally; Advanced nuclear reactor siting issues generally; Coal power plant modernization support; Issues related to new nuclear reactor completion guarantees, including S. 3814, the Accelerating Reliable Capacity (ARC) Act; Issues related to NRC meteorological tower requirement reforms; Issues related to regional transmission organizations; Issues and draft legislation related to transmission permitting and planning; Issues related to DOE Energy Dominance Financing program; DOE SPARK grant applications
Client expense: $370,000 · Firm income: —
Matched citations: H.R. 3632
Electric Supply Chain Act
2026 · third_quarter · Client: AMERICAN ELECTRIC POWER COMPANY, INC. AND AFFILIATED CORPORATIONS
H.R. 3616, Reliable Power Act; H.R. 1047, Grid Power Act; H.R. 3632, Power Plant Reliability Act; H.R. 3638, Electric Supply Chain Act; H.R. 3657, Hydropower Relicensing Transparency Act; H.R. 3015, National Coal Council Reestablishment Act; H.R. 3062, Promoting Cross-Border Energy Infrastructure Act; H.R. 5600, SPEED and Reliability Act; H.R. 1355, Weatherization Enhancement and Readiness Act; H.R. 4503, ePermit Act; H.R. 3843, Baseload Reliability Protection Act; H.R. 6336, FAIR Act; H.R. 6633, High-Capacity Grid Act; H.R. 7977, Energy Bills Relief Act of 2026; H.R. 9332, Load Forecasting Enhancement Act; H.R. 9339, Affordable Innovation for the Grid Act; H.R. 9335, Advanced Transmission Technology to Reduce Rates Act; H.R. 9340, Ratepayer Protection Act; H.R. 5549/S. 1757, Efficient Nuclear Licensing Hearings Act; S. 1327, Advancing GETs Act of 2025; S. 3034, Reliable Power Act; S. 3585/H.R. 8400, DATA Act; S. 3852, GRID Act; S. 3947, REWIRE Act; S. 465, GRID Power Act; S. 4559, Energy Cost Fairness and Reliability Act; Draft legislation on transmission; Draft legislation on permitting reform; Draft legislation on permitting certainty; Artificial intelligence issues generally; Load growth, reliability, and resource adequacy generally; Data center issues generally; Energy security issues generally; Energy efficiency generally; Issues related to energy grid supply chain; Issues related to energy sector impacts from tariff policies; Draft legislation related to cybersecurity; Draft legislation related to security and data; Distribution transformers; Draft legislation related to electric grid/energy infrastructure cybersecurity; Draft legislation on microgrids; Advanced Reactor Demonstration Program generally; Advanced nuclear reactor siting issues generally; Coal power plant modernization support; Issues related to new nuclear reactor completion guarantees, including S. 3814, the Accelerating Reliable Capacity (ARC) Act; Issues related to NRC meteorological tower requirement reforms; Issues related to regional transmission organizations; Issues and draft legislation related to transmission permitting and planning; Issues related to DOE Energy Dominance Financing program; DOE SPARK grant applications
Client expense: $370,000 · Firm income: —
Matched citations: H.R. 3638
Hydropower Licensing Transparency Act
2026 · third_quarter · Client: AMERICAN ELECTRIC POWER COMPANY, INC. AND AFFILIATED CORPORATIONS
H.R. 3616, Reliable Power Act; H.R. 1047, Grid Power Act; H.R. 3632, Power Plant Reliability Act; H.R. 3638, Electric Supply Chain Act; H.R. 3657, Hydropower Relicensing Transparency Act; H.R. 3015, National Coal Council Reestablishment Act; H.R. 3062, Promoting Cross-Border Energy Infrastructure Act; H.R. 5600, SPEED and Reliability Act; H.R. 1355, Weatherization Enhancement and Readiness Act; H.R. 4503, ePermit Act; H.R. 3843, Baseload Reliability Protection Act; H.R. 6336, FAIR Act; H.R. 6633, High-Capacity Grid Act; H.R. 7977, Energy Bills Relief Act of 2026; H.R. 9332, Load Forecasting Enhancement Act; H.R. 9339, Affordable Innovation for the Grid Act; H.R. 9335, Advanced Transmission Technology to Reduce Rates Act; H.R. 9340, Ratepayer Protection Act; H.R. 5549/S. 1757, Efficient Nuclear Licensing Hearings Act; S. 1327, Advancing GETs Act of 2025; S. 3034, Reliable Power Act; S. 3585/H.R. 8400, DATA Act; S. 3852, GRID Act; S. 3947, REWIRE Act; S. 465, GRID Power Act; S. 4559, Energy Cost Fairness and Reliability Act; Draft legislation on transmission; Draft legislation on permitting reform; Draft legislation on permitting certainty; Artificial intelligence issues generally; Load growth, reliability, and resource adequacy generally; Data center issues generally; Energy security issues generally; Energy efficiency generally; Issues related to energy grid supply chain; Issues related to energy sector impacts from tariff policies; Draft legislation related to cybersecurity; Draft legislation related to security and data; Distribution transformers; Draft legislation related to electric grid/energy infrastructure cybersecurity; Draft legislation on microgrids; Advanced Reactor Demonstration Program generally; Advanced nuclear reactor siting issues generally; Coal power plant modernization support; Issues related to new nuclear reactor completion guarantees, including S. 3814, the Accelerating Reliable Capacity (ARC) Act; Issues related to NRC meteorological tower requirement reforms; Issues related to regional transmission organizations; Issues and draft legislation related to transmission permitting and planning; Issues related to DOE Energy Dominance Financing program; DOE SPARK grant applications
Client expense: $370,000 · Firm income: —
Matched citations: H.R. 3657
Baseload Reliability Protection Act
2026 · third_quarter · Client: AMERICAN ELECTRIC POWER COMPANY, INC. AND AFFILIATED CORPORATIONS
H.R. 3616, Reliable Power Act; H.R. 1047, Grid Power Act; H.R. 3632, Power Plant Reliability Act; H.R. 3638, Electric Supply Chain Act; H.R. 3657, Hydropower Relicensing Transparency Act; H.R. 3015, National Coal Council Reestablishment Act; H.R. 3062, Promoting Cross-Border Energy Infrastructure Act; H.R. 5600, SPEED and Reliability Act; H.R. 1355, Weatherization Enhancement and Readiness Act; H.R. 4503, ePermit Act; H.R. 3843, Baseload Reliability Protection Act; H.R. 6336, FAIR Act; H.R. 6633, High-Capacity Grid Act; H.R. 7977, Energy Bills Relief Act of 2026; H.R. 9332, Load Forecasting Enhancement Act; H.R. 9339, Affordable Innovation for the Grid Act; H.R. 9335, Advanced Transmission Technology to Reduce Rates Act; H.R. 9340, Ratepayer Protection Act; H.R. 5549/S. 1757, Efficient Nuclear Licensing Hearings Act; S. 1327, Advancing GETs Act of 2025; S. 3034, Reliable Power Act; S. 3585/H.R. 8400, DATA Act; S. 3852, GRID Act; S. 3947, REWIRE Act; S. 465, GRID Power Act; S. 4559, Energy Cost Fairness and Reliability Act; Draft legislation on transmission; Draft legislation on permitting reform; Draft legislation on permitting certainty; Artificial intelligence issues generally; Load growth, reliability, and resource adequacy generally; Data center issues generally; Energy security issues generally; Energy efficiency generally; Issues related to energy grid supply chain; Issues related to energy sector impacts from tariff policies; Draft legislation related to cybersecurity; Draft legislation related to security and data; Distribution transformers; Draft legislation related to electric grid/energy infrastructure cybersecurity; Draft legislation on microgrids; Advanced Reactor Demonstration Program generally; Advanced nuclear reactor siting issues generally; Coal power plant modernization support; Issues related to new nuclear reactor completion guarantees, including S. 3814, the Accelerating Reliable Capacity (ARC) Act; Issues related to NRC meteorological tower requirement reforms; Issues related to regional transmission organizations; Issues and draft legislation related to transmission permitting and planning; Issues related to DOE Energy Dominance Financing program; DOE SPARK grant applications
Client expense: $370,000 · Firm income: —
Matched citations: H.R. 3843
ePermit Act
2026 · third_quarter · Client: AMERICAN ELECTRIC POWER COMPANY, INC. AND AFFILIATED CORPORATIONS
H.R. 3616, Reliable Power Act; H.R. 1047, Grid Power Act; H.R. 3632, Power Plant Reliability Act; H.R. 3638, Electric Supply Chain Act; H.R. 3657, Hydropower Relicensing Transparency Act; H.R. 3015, National Coal Council Reestablishment Act; H.R. 3062, Promoting Cross-Border Energy Infrastructure Act; H.R. 5600, SPEED and Reliability Act; H.R. 1355, Weatherization Enhancement and Readiness Act; H.R. 4503, ePermit Act; H.R. 3843, Baseload Reliability Protection Act; H.R. 6336, FAIR Act; H.R. 6633, High-Capacity Grid Act; H.R. 7977, Energy Bills Relief Act of 2026; H.R. 9332, Load Forecasting Enhancement Act; H.R. 9339, Affordable Innovation for the Grid Act; H.R. 9335, Advanced Transmission Technology to Reduce Rates Act; H.R. 9340, Ratepayer Protection Act; H.R. 5549/S. 1757, Efficient Nuclear Licensing Hearings Act; S. 1327, Advancing GETs Act of 2025; S. 3034, Reliable Power Act; S. 3585/H.R. 8400, DATA Act; S. 3852, GRID Act; S. 3947, REWIRE Act; S. 465, GRID Power Act; S. 4559, Energy Cost Fairness and Reliability Act; Draft legislation on transmission; Draft legislation on permitting reform; Draft legislation on permitting certainty; Artificial intelligence issues generally; Load growth, reliability, and resource adequacy generally; Data center issues generally; Energy security issues generally; Energy efficiency generally; Issues related to energy grid supply chain; Issues related to energy sector impacts from tariff policies; Draft legislation related to cybersecurity; Draft legislation related to security and data; Distribution transformers; Draft legislation related to electric grid/energy infrastructure cybersecurity; Draft legislation on microgrids; Advanced Reactor Demonstration Program generally; Advanced nuclear reactor siting issues generally; Coal power plant modernization support; Issues related to new nuclear reactor completion guarantees, including S. 3814, the Accelerating Reliable Capacity (ARC) Act; Issues related to NRC meteorological tower requirement reforms; Issues related to regional transmission organizations; Issues and draft legislation related to transmission permitting and planning; Issues related to DOE Energy Dominance Financing program; DOE SPARK grant applications
Client expense: $370,000 · Firm income: —
Matched citations: H.R. 4503
Fix Our Forests Act
2026 · third_quarter · Client: AMERICAN ELECTRIC POWER COMPANY, INC. AND AFFILIATED CORPORATIONS
H.R. 471/S. 1462, the Fix Our Forest Act; H.R. 4776, SPEED Act; H.R. 161, New Source Review Permitting Improvement Act; H.R. 753, FIRE Act; H.R. 573, Studying NEPAs Impact on Projects Act; Conservation regulations at the Bureau of Land Management; Wildfires and other natural disasters; EPA regulations on Clean Air Act Section 111d; EPA regulations generally; Good Neighbor Rule; Coal Combustion Residuals; Effluent Limitation Guidelines; Draft legislation on the Clean Air Act; Rights-of-way; Categorical exclusions; Siting and permitting generally; National Environmental Policy Act; Clean Water Act generally; Endangered Species Act generally; Power demand generally; National Historic Preservation Act generally; Water Resources Development Act generally; Clean Air Act generally; PFAS and Comprehensive Environmental Response, Compensation, and Liability Act
Client expense: $370,000 · Firm income: —
Matched citations: H.R. 471
SPEED Act
2026 · third_quarter · Client: AMERICAN ELECTRIC POWER COMPANY, INC. AND AFFILIATED CORPORATIONS
H.R. 471/S. 1462, the Fix Our Forest Act; H.R. 4776, SPEED Act; H.R. 161, New Source Review Permitting Improvement Act; H.R. 753, FIRE Act; H.R. 573, Studying NEPAs Impact on Projects Act; Conservation regulations at the Bureau of Land Management; Wildfires and other natural disasters; EPA regulations on Clean Air Act Section 111d; EPA regulations generally; Good Neighbor Rule; Coal Combustion Residuals; Effluent Limitation Guidelines; Draft legislation on the Clean Air Act; Rights-of-way; Categorical exclusions; Siting and permitting generally; National Environmental Policy Act; Clean Water Act generally; Endangered Species Act generally; Power demand generally; National Historic Preservation Act generally; Water Resources Development Act generally; Clean Air Act generally; PFAS and Comprehensive Environmental Response, Compensation, and Liability Act
Client expense: $370,000 · Firm income: —
Matched citations: H.R. 4776
Efficient Nuclear Licensing Hearings Act
2026 · third_quarter · Client: AMERICAN ELECTRIC POWER COMPANY, INC. AND AFFILIATED CORPORATIONS
H.R. 3616, Reliable Power Act; H.R. 1047, Grid Power Act; H.R. 3632, Power Plant Reliability Act; H.R. 3638, Electric Supply Chain Act; H.R. 3657, Hydropower Relicensing Transparency Act; H.R. 3015, National Coal Council Reestablishment Act; H.R. 3062, Promoting Cross-Border Energy Infrastructure Act; H.R. 5600, SPEED and Reliability Act; H.R. 1355, Weatherization Enhancement and Readiness Act; H.R. 4503, ePermit Act; H.R. 3843, Baseload Reliability Protection Act; H.R. 6336, FAIR Act; H.R. 6633, High-Capacity Grid Act; H.R. 7977, Energy Bills Relief Act of 2026; H.R. 9332, Load Forecasting Enhancement Act; H.R. 9339, Affordable Innovation for the Grid Act; H.R. 9335, Advanced Transmission Technology to Reduce Rates Act; H.R. 9340, Ratepayer Protection Act; H.R. 5549/S. 1757, Efficient Nuclear Licensing Hearings Act; S. 1327, Advancing GETs Act of 2025; S. 3034, Reliable Power Act; S. 3585/H.R. 8400, DATA Act; S. 3852, GRID Act; S. 3947, REWIRE Act; S. 465, GRID Power Act; S. 4559, Energy Cost Fairness and Reliability Act; Draft legislation on transmission; Draft legislation on permitting reform; Draft legislation on permitting certainty; Artificial intelligence issues generally; Load growth, reliability, and resource adequacy generally; Data center issues generally; Energy security issues generally; Energy efficiency generally; Issues related to energy grid supply chain; Issues related to energy sector impacts from tariff policies; Draft legislation related to cybersecurity; Draft legislation related to security and data; Distribution transformers; Draft legislation related to electric grid/energy infrastructure cybersecurity; Draft legislation on microgrids; Advanced Reactor Demonstration Program generally; Advanced nuclear reactor siting issues generally; Coal power plant modernization support; Issues related to new nuclear reactor completion guarantees, including S. 3814, the Accelerating Reliable Capacity (ARC) Act; Issues related to NRC meteorological tower requirement reforms; Issues related to regional transmission organizations; Issues and draft legislation related to transmission permitting and planning; Issues related to DOE Energy Dominance Financing program; DOE SPARK grant applications
Client expense: $370,000 · Firm income: —
Matched citations: H.R. 5549
SPEED and Reliability Act of 2025
2026 · third_quarter · Client: AMERICAN ELECTRIC POWER COMPANY, INC. AND AFFILIATED CORPORATIONS
H.R. 3616, Reliable Power Act; H.R. 1047, Grid Power Act; H.R. 3632, Power Plant Reliability Act; H.R. 3638, Electric Supply Chain Act; H.R. 3657, Hydropower Relicensing Transparency Act; H.R. 3015, National Coal Council Reestablishment Act; H.R. 3062, Promoting Cross-Border Energy Infrastructure Act; H.R. 5600, SPEED and Reliability Act; H.R. 1355, Weatherization Enhancement and Readiness Act; H.R. 4503, ePermit Act; H.R. 3843, Baseload Reliability Protection Act; H.R. 6336, FAIR Act; H.R. 6633, High-Capacity Grid Act; H.R. 7977, Energy Bills Relief Act of 2026; H.R. 9332, Load Forecasting Enhancement Act; H.R. 9339, Affordable Innovation for the Grid Act; H.R. 9335, Advanced Transmission Technology to Reduce Rates Act; H.R. 9340, Ratepayer Protection Act; H.R. 5549/S. 1757, Efficient Nuclear Licensing Hearings Act; S. 1327, Advancing GETs Act of 2025; S. 3034, Reliable Power Act; S. 3585/H.R. 8400, DATA Act; S. 3852, GRID Act; S. 3947, REWIRE Act; S. 465, GRID Power Act; S. 4559, Energy Cost Fairness and Reliability Act; Draft legislation on transmission; Draft legislation on permitting reform; Draft legislation on permitting certainty; Artificial intelligence issues generally; Load growth, reliability, and resource adequacy generally; Data center issues generally; Energy security issues generally; Energy efficiency generally; Issues related to energy grid supply chain; Issues related to energy sector impacts from tariff policies; Draft legislation related to cybersecurity; Draft legislation related to security and data; Distribution transformers; Draft legislation related to electric grid/energy infrastructure cybersecurity; Draft legislation on microgrids; Advanced Reactor Demonstration Program generally; Advanced nuclear reactor siting issues generally; Coal power plant modernization support; Issues related to new nuclear reactor completion guarantees, including S. 3814, the Accelerating Reliable Capacity (ARC) Act; Issues related to NRC meteorological tower requirement reforms; Issues related to regional transmission organizations; Issues and draft legislation related to transmission permitting and planning; Issues related to DOE Energy Dominance Financing program; DOE SPARK grant applications
Client expense: $370,000 · Firm income: —
Matched citations: H.R. 5600
Studying NEPA’s Impact on Projects Act
2026 · third_quarter · Client: AMERICAN ELECTRIC POWER COMPANY, INC. AND AFFILIATED CORPORATIONS
H.R. 471/S. 1462, the Fix Our Forest Act; H.R. 4776, SPEED Act; H.R. 161, New Source Review Permitting Improvement Act; H.R. 753, FIRE Act; H.R. 573, Studying NEPAs Impact on Projects Act; Conservation regulations at the Bureau of Land Management; Wildfires and other natural disasters; EPA regulations on Clean Air Act Section 111d; EPA regulations generally; Good Neighbor Rule; Coal Combustion Residuals; Effluent Limitation Guidelines; Draft legislation on the Clean Air Act; Rights-of-way; Categorical exclusions; Siting and permitting generally; National Environmental Policy Act; Clean Water Act generally; Endangered Species Act generally; Power demand generally; National Historic Preservation Act generally; Water Resources Development Act generally; Clean Air Act generally; PFAS and Comprehensive Environmental Response, Compensation, and Liability Act
Client expense: $370,000 · Firm income: —
Matched citations: H.R. 573
Fair Allocation of Interstate Rates Act
2026 · third_quarter · Client: AMERICAN ELECTRIC POWER COMPANY, INC. AND AFFILIATED CORPORATIONS
H.R. 3616, Reliable Power Act; H.R. 1047, Grid Power Act; H.R. 3632, Power Plant Reliability Act; H.R. 3638, Electric Supply Chain Act; H.R. 3657, Hydropower Relicensing Transparency Act; H.R. 3015, National Coal Council Reestablishment Act; H.R. 3062, Promoting Cross-Border Energy Infrastructure Act; H.R. 5600, SPEED and Reliability Act; H.R. 1355, Weatherization Enhancement and Readiness Act; H.R. 4503, ePermit Act; H.R. 3843, Baseload Reliability Protection Act; H.R. 6336, FAIR Act; H.R. 6633, High-Capacity Grid Act; H.R. 7977, Energy Bills Relief Act of 2026; H.R. 9332, Load Forecasting Enhancement Act; H.R. 9339, Affordable Innovation for the Grid Act; H.R. 9335, Advanced Transmission Technology to Reduce Rates Act; H.R. 9340, Ratepayer Protection Act; H.R. 5549/S. 1757, Efficient Nuclear Licensing Hearings Act; S. 1327, Advancing GETs Act of 2025; S. 3034, Reliable Power Act; S. 3585/H.R. 8400, DATA Act; S. 3852, GRID Act; S. 3947, REWIRE Act; S. 465, GRID Power Act; S. 4559, Energy Cost Fairness and Reliability Act; Draft legislation on transmission; Draft legislation on permitting reform; Draft legislation on permitting certainty; Artificial intelligence issues generally; Load growth, reliability, and resource adequacy generally; Data center issues generally; Energy security issues generally; Energy efficiency generally; Issues related to energy grid supply chain; Issues related to energy sector impacts from tariff policies; Draft legislation related to cybersecurity; Draft legislation related to security and data; Distribution transformers; Draft legislation related to electric grid/energy infrastructure cybersecurity; Draft legislation on microgrids; Advanced Reactor Demonstration Program generally; Advanced nuclear reactor siting issues generally; Coal power plant modernization support; Issues related to new nuclear reactor completion guarantees, including S. 3814, the Accelerating Reliable Capacity (ARC) Act; Issues related to NRC meteorological tower requirement reforms; Issues related to regional transmission organizations; Issues and draft legislation related to transmission permitting and planning; Issues related to DOE Energy Dominance Financing program; DOE SPARK grant applications
Client expense: $370,000 · Firm income: —
Matched citations: H.R. 6336
High-Capacity Grid Act
2026 · third_quarter · Client: AMERICAN ELECTRIC POWER COMPANY, INC. AND AFFILIATED CORPORATIONS
H.R. 3616, Reliable Power Act; H.R. 1047, Grid Power Act; H.R. 3632, Power Plant Reliability Act; H.R. 3638, Electric Supply Chain Act; H.R. 3657, Hydropower Relicensing Transparency Act; H.R. 3015, National Coal Council Reestablishment Act; H.R. 3062, Promoting Cross-Border Energy Infrastructure Act; H.R. 5600, SPEED and Reliability Act; H.R. 1355, Weatherization Enhancement and Readiness Act; H.R. 4503, ePermit Act; H.R. 3843, Baseload Reliability Protection Act; H.R. 6336, FAIR Act; H.R. 6633, High-Capacity Grid Act; H.R. 7977, Energy Bills Relief Act of 2026; H.R. 9332, Load Forecasting Enhancement Act; H.R. 9339, Affordable Innovation for the Grid Act; H.R. 9335, Advanced Transmission Technology to Reduce Rates Act; H.R. 9340, Ratepayer Protection Act; H.R. 5549/S. 1757, Efficient Nuclear Licensing Hearings Act; S. 1327, Advancing GETs Act of 2025; S. 3034, Reliable Power Act; S. 3585/H.R. 8400, DATA Act; S. 3852, GRID Act; S. 3947, REWIRE Act; S. 465, GRID Power Act; S. 4559, Energy Cost Fairness and Reliability Act; Draft legislation on transmission; Draft legislation on permitting reform; Draft legislation on permitting certainty; Artificial intelligence issues generally; Load growth, reliability, and resource adequacy generally; Data center issues generally; Energy security issues generally; Energy efficiency generally; Issues related to energy grid supply chain; Issues related to energy sector impacts from tariff policies; Draft legislation related to cybersecurity; Draft legislation related to security and data; Distribution transformers; Draft legislation related to electric grid/energy infrastructure cybersecurity; Draft legislation on microgrids; Advanced Reactor Demonstration Program generally; Advanced nuclear reactor siting issues generally; Coal power plant modernization support; Issues related to new nuclear reactor completion guarantees, including S. 3814, the Accelerating Reliable Capacity (ARC) Act; Issues related to NRC meteorological tower requirement reforms; Issues related to regional transmission organizations; Issues and draft legislation related to transmission permitting and planning; Issues related to DOE Energy Dominance Financing program; DOE SPARK grant applications
Client expense: $370,000 · Firm income: —
Matched citations: H.R. 6633
SECURE Grid Act
2026 · third_quarter · Client: AMERICAN ELECTRIC POWER COMPANY, INC. AND AFFILIATED CORPORATIONS
H.R. 7305, Energy Threat Analysis Center Act of 2026; H.R. 7257, SECURE Grid Act; H.R. 7272, Pipeline Cybersecurity Preparedness Act; S. 4380 / H.R. 9232, Critical Infrastructure Airspace Defense Act; S. 1337, Cybersecurity Information Sharing Extension Act; S. 1875, Streamlining Federal Cybersecurity Regulations Act of 2025; Counter-UAS legislation generally; Cyber incident reporting generally; Cyber regulatory harmonization generally; Cybersecurity Information Sharing Act of 2015 reauthorization; Issues Related to Critical Infrastructure Partnership Advisory Council
Client expense: $370,000 · Firm income: —
Matched citations: H.R. 7257
Pipeline Cybersecurity Preparedness Act
2026 · third_quarter · Client: AMERICAN ELECTRIC POWER COMPANY, INC. AND AFFILIATED CORPORATIONS
H.R. 7305, Energy Threat Analysis Center Act of 2026; H.R. 7257, SECURE Grid Act; H.R. 7272, Pipeline Cybersecurity Preparedness Act; S. 4380 / H.R. 9232, Critical Infrastructure Airspace Defense Act; S. 1337, Cybersecurity Information Sharing Extension Act; S. 1875, Streamlining Federal Cybersecurity Regulations Act of 2025; Counter-UAS legislation generally; Cyber incident reporting generally; Cyber regulatory harmonization generally; Cybersecurity Information Sharing Act of 2015 reauthorization; Issues Related to Critical Infrastructure Partnership Advisory Council
Client expense: $370,000 · Firm income: —
Matched citations: H.R. 7272
Energy Threat Analysis Center Act of 2026
2026 · third_quarter · Client: AMERICAN ELECTRIC POWER COMPANY, INC. AND AFFILIATED CORPORATIONS
H.R. 7305, Energy Threat Analysis Center Act of 2026; H.R. 7257, SECURE Grid Act; H.R. 7272, Pipeline Cybersecurity Preparedness Act; S. 4380 / H.R. 9232, Critical Infrastructure Airspace Defense Act; S. 1337, Cybersecurity Information Sharing Extension Act; S. 1875, Streamlining Federal Cybersecurity Regulations Act of 2025; Counter-UAS legislation generally; Cyber incident reporting generally; Cyber regulatory harmonization generally; Cybersecurity Information Sharing Act of 2015 reauthorization; Issues Related to Critical Infrastructure Partnership Advisory Council
Client expense: $370,000 · Firm income: —
Matched citations: H.R. 7305
FIRE Act of 2025
2026 · third_quarter · Client: AMERICAN ELECTRIC POWER COMPANY, INC. AND AFFILIATED CORPORATIONS
H.R. 471/S. 1462, the Fix Our Forest Act; H.R. 4776, SPEED Act; H.R. 161, New Source Review Permitting Improvement Act; H.R. 753, FIRE Act; H.R. 573, Studying NEPAs Impact on Projects Act; Conservation regulations at the Bureau of Land Management; Wildfires and other natural disasters; EPA regulations on Clean Air Act Section 111d; EPA regulations generally; Good Neighbor Rule; Coal Combustion Residuals; Effluent Limitation Guidelines; Draft legislation on the Clean Air Act; Rights-of-way; Categorical exclusions; Siting and permitting generally; National Environmental Policy Act; Clean Water Act generally; Endangered Species Act generally; Power demand generally; National Historic Preservation Act generally; Water Resources Development Act generally; Clean Air Act generally; PFAS and Comprehensive Environmental Response, Compensation, and Liability Act
Client expense: $370,000 · Firm income: —
Matched citations: H.R. 753
Energy Bills Relief Act
2026 · third_quarter · Client: AMERICAN ELECTRIC POWER COMPANY, INC. AND AFFILIATED CORPORATIONS
H.R. 3616, Reliable Power Act; H.R. 1047, Grid Power Act; H.R. 3632, Power Plant Reliability Act; H.R. 3638, Electric Supply Chain Act; H.R. 3657, Hydropower Relicensing Transparency Act; H.R. 3015, National Coal Council Reestablishment Act; H.R. 3062, Promoting Cross-Border Energy Infrastructure Act; H.R. 5600, SPEED and Reliability Act; H.R. 1355, Weatherization Enhancement and Readiness Act; H.R. 4503, ePermit Act; H.R. 3843, Baseload Reliability Protection Act; H.R. 6336, FAIR Act; H.R. 6633, High-Capacity Grid Act; H.R. 7977, Energy Bills Relief Act of 2026; H.R. 9332, Load Forecasting Enhancement Act; H.R. 9339, Affordable Innovation for the Grid Act; H.R. 9335, Advanced Transmission Technology to Reduce Rates Act; H.R. 9340, Ratepayer Protection Act; H.R. 5549/S. 1757, Efficient Nuclear Licensing Hearings Act; S. 1327, Advancing GETs Act of 2025; S. 3034, Reliable Power Act; S. 3585/H.R. 8400, DATA Act; S. 3852, GRID Act; S. 3947, REWIRE Act; S. 465, GRID Power Act; S. 4559, Energy Cost Fairness and Reliability Act; Draft legislation on transmission; Draft legislation on permitting reform; Draft legislation on permitting certainty; Artificial intelligence issues generally; Load growth, reliability, and resource adequacy generally; Data center issues generally; Energy security issues generally; Energy efficiency generally; Issues related to energy grid supply chain; Issues related to energy sector impacts from tariff policies; Draft legislation related to cybersecurity; Draft legislation related to security and data; Distribution transformers; Draft legislation related to electric grid/energy infrastructure cybersecurity; Draft legislation on microgrids; Advanced Reactor Demonstration Program generally; Advanced nuclear reactor siting issues generally; Coal power plant modernization support; Issues related to new nuclear reactor completion guarantees, including S. 3814, the Accelerating Reliable Capacity (ARC) Act; Issues related to NRC meteorological tower requirement reforms; Issues related to regional transmission organizations; Issues and draft legislation related to transmission permitting and planning; Issues related to DOE Energy Dominance Financing program; DOE SPARK grant applications
Client expense: $370,000 · Firm income: —
Matched citations: H.R. 7977
DATA Act of 2026
2026 · third_quarter · Client: AMERICAN ELECTRIC POWER COMPANY, INC. AND AFFILIATED CORPORATIONS
H.R. 3616, Reliable Power Act; H.R. 1047, Grid Power Act; H.R. 3632, Power Plant Reliability Act; H.R. 3638, Electric Supply Chain Act; H.R. 3657, Hydropower Relicensing Transparency Act; H.R. 3015, National Coal Council Reestablishment Act; H.R. 3062, Promoting Cross-Border Energy Infrastructure Act; H.R. 5600, SPEED and Reliability Act; H.R. 1355, Weatherization Enhancement and Readiness Act; H.R. 4503, ePermit Act; H.R. 3843, Baseload Reliability Protection Act; H.R. 6336, FAIR Act; H.R. 6633, High-Capacity Grid Act; H.R. 7977, Energy Bills Relief Act of 2026; H.R. 9332, Load Forecasting Enhancement Act; H.R. 9339, Affordable Innovation for the Grid Act; H.R. 9335, Advanced Transmission Technology to Reduce Rates Act; H.R. 9340, Ratepayer Protection Act; H.R. 5549/S. 1757, Efficient Nuclear Licensing Hearings Act; S. 1327, Advancing GETs Act of 2025; S. 3034, Reliable Power Act; S. 3585/H.R. 8400, DATA Act; S. 3852, GRID Act; S. 3947, REWIRE Act; S. 465, GRID Power Act; S. 4559, Energy Cost Fairness and Reliability Act; Draft legislation on transmission; Draft legislation on permitting reform; Draft legislation on permitting certainty; Artificial intelligence issues generally; Load growth, reliability, and resource adequacy generally; Data center issues generally; Energy security issues generally; Energy efficiency generally; Issues related to energy grid supply chain; Issues related to energy sector impacts from tariff policies; Draft legislation related to cybersecurity; Draft legislation related to security and data; Distribution transformers; Draft legislation related to electric grid/energy infrastructure cybersecurity; Draft legislation on microgrids; Advanced Reactor Demonstration Program generally; Advanced nuclear reactor siting issues generally; Coal power plant modernization support; Issues related to new nuclear reactor completion guarantees, including S. 3814, the Accelerating Reliable Capacity (ARC) Act; Issues related to NRC meteorological tower requirement reforms; Issues related to regional transmission organizations; Issues and draft legislation related to transmission permitting and planning; Issues related to DOE Energy Dominance Financing program; DOE SPARK grant applications
Client expense: $370,000 · Firm income: —
Matched citations: H.R. 8400